蒸汽锅炉安全技术监察规程(英文版)_第1页
蒸汽锅炉安全技术监察规程(英文版)_第2页
蒸汽锅炉安全技术监察规程(英文版)_第3页
蒸汽锅炉安全技术监察规程(英文版)_第4页
蒸汽锅炉安全技术监察规程(英文版)_第5页
已阅读5页,还剩69页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

The Chinese version of standards has precedence to their English translations which are only for internal reference.本英文版为内部资料,仅供参考,以中文版为准。Ministry of Labor, Peoples Republic of China中华人民共和国劳动部Steam Boiler Safety Technology Supervisory Regulations蒸汽锅炉安全技术监察规程China Labor Publishing House中国劳动出版社Document of the Ministry of LaborLaoBuFa 1996 No.276Notice about issuing of “Steam Boiler Safety Technology Supervisory Regulation”To: Departments (Bureaus) of Labor (Labor and Personnel) of all the provinces, autonomous regions, and the municipalities under central authority, Ministries and Committees relevant under the State Council and Organizations directly under it, the Supreme Peoples Procuratorate, the Supreme Peoples Court, General Logistics Department of the PLA and Xinjiang Production and Construction Corps:Along with the development of our national economy, the advancement of science and technology, and the improvement of management level, great changes have taken place in the boiler industry of our country in the design, manufacture and operation level. Therefore, the “Steam Boiler Safety Technology Supervisory Regulations” (LaoRenGuo 1987 No.4) issued by the former Ministry of Labor and Personnel cannot meet current requirements for the supervisory of safety and technology. Therefore, we have revised the original regulations thoroughly on the basis of making extensive investigations and soliciting experts opinions. Now, the newly revised “Steam Boiler Safety Technology Supervisory Regulation” is issued to you and it will be implemented from January 1, 1997, and the original “Steam Boiler Safety Technology Supervisory Regulation” (LaoRenGuo 1987 No.4) will be annulled on the same date. If the existing regulations of our ministry are in conflict with the new regulations, the new regulations shall govern.The labor departments at all levels and the units relevant shall organize the personnel concerned to study and implement conscientiously the new regulations. Any problem occurred during the implementation, please inform the Supervisory Bureau of Occupational Safety and Health and Boiler Pressure Vessels of our Ministry. Ministry of LaborAugust 19, 1996Contents1. General42. General requirements 53. Materials74. Structures145. Welding of pressure elements 216. Expanded Tube Joint347. Main Accessories and Instruments358. Boiler House459. Operation Management4710. Testing and Inspection4911. Supplementary Provisions52AppendixI. Qualification of Welding Procedure53II. Specimens for Welding Joint Tensile Test and Bend Test65Steam Boiler Safety Technology Supervisory RegulationChapter 1 GeneralArticle 1 This regulation is made, on the basis of the stipulations of the “Tentative Regulations for the Supervision of Safety of Boiler Pressure Vessels”, to ensure boiler safety operation, protect human safety, and promote the development of the national economy. Article 2 This regulation applies to stationary pressure steam boilers with water as their medium, and to the design, manufacture, installation, handling, inspection, repair and modification of pipes within the boiler scope.Steam-water dual-purpose boilers shall conform to the related stipulations in “Supervisory Regulation for Safety and Technology of Hot Water Boilers”, in addition to conforming to the stipulations in this Regulation.This Regulation does not apply to stationary pressure steam boilers with water volume less than 30L and nuclear steam generators.Article 3 All the related units and their responsible departments must implement stipulations in this Regulation.The labor administrative departments of the peoples governments above the county level shall be responsible for the boiler safety supervisory.The safety supervisory agency of boiler pressure vessel of labor administrative departments at all levels (hereinafter referred to as “the safety supervisory agency”) shall be responsible for supervisory of the implementation of this Regulation.Article 4 The stipulations in this Regulation are the basic requirements in the field of boiler safety management and safety technology. If the requirements in other related technical standards are not in conformity with the stipulations in this Regulation, this Regulation shall govern.Article 5 The imported stationary steam boiler or the stationary steam boiler manufactured by domestic enterprises (including enterprises invested by foreign investors) that have imported foreign technology and followed foreign standards in manufacturing and used domestically shall also be in conformity with this Regulation. If it is not in conformity with this Regulation under special cases, pre-approval shall be obtained from the safety supervisory agency of the Ministry of Labor.Article 6 If new technology, such as, new structure, new process, new material, etc. are used by related units, if they are not in conformity with this Regulation, the test condition and data or related technical information and grounds shall be submitted to the safety supervisory agency at province level for approval and submitted to the safety supervisory agency of the Ministry of Labor for approval.Chapter 2 General requirementsArticle 7 The design of boilers shall conform to the requirements of safety and reliability. The structure of boilers shall conform to the requirements in Chapter 4 of this Regulation. The strength of boiler pressure elements shall be calculated and verified according to “Strength Calculation of Pressure Elements of Water-tube Boilers” or “Strength Calculation of Pressure Elements of Drum Boilers”.Article 8 When boiler is delivered from factory, it must be accompanied by technical data related to safety, including:1. Boiler drawings (including general drawings, installation drawings and main pressure parts drawings);2. Strength calculation sheets of pressure elements or summary of calculation results;3. Calculation sheets of relieving capacity of relief valves or summary of calculation results;4. Boiler quality certificate (including ex-work certificate, metal material certificate, welding quality certificate and hydraulic test certificate);5. Boiler installation instructions and operation instructions;6. Information of major design modification of pressure elements.For boilers with rated steam pressure greater than or equal to 3.8Mpa, at least the following technical information have to be provided:1. Thermal calculation sheets or summary of thermal calculation results of boiler;2. Calculation sheets or summary of calculation results of superheater wall temperature;3. Calculation sheets or summary of calculation results of fume and air resistance;4. Thermal expansion system drawings.For boilers with rated steam pressure greater than or equal to 9.8Mpa, the following additional technical information has to be provided:1. Calculation sheets or summary of calculation results of reheater wall temperature;2. Calculation sheets or summary of calculation results of boiler water circulation (including steam-water resistance);3. Steam-water system drawings;4. Set values of all protection devices.Article 9 Metal nameplate shall be provided at obvious place when boiler product delivered from factory and shall be carried with the following items:1. Boiler model;2. Serial number of boiler products of manufacturer;3. Rated evaporative capacity (t/h) or rated power (MW);4. Rated steam pressure (MPa);5. Rated steam temperature ();6. Inlet and outlet temperature () and inlet and outlet pressure (MPa) of reheat steam;7. Name of manufacturer;8. Class and number of license of boiler manufacture;9. Name of supervision and inspection unit and mark of supervision and inspection of boiler manufacture;10. Year of manufacture.For boilers delivered from factory in bulk, embossed stamp shall be stamped on the head or end of major pressure parts, such as drum, superheater header, reheater header, water wall header, economizer header and attemperator and startup separator, and product serial number of this part shall be indicated.Article 10 For boilers with rated steam pressure lower than or equal to 2.5Mpa, the related stipulations in Volume 6 TJ231 (six) “Installation of Crushing and Pulverizing Plants, Hoisters, Stationary Diesels, Industrial Boilers” of “Code for Installation Construction and Acceptance of Mechanical Equipment” may be referred to, in addition to conforming to this Regulation. For boilers with rated steam pressure greater than 2.5Mpa, related stipulations in SDJ245 “Technical Specifications for Construction and Acceptance of Electrical Power Construction (Boiler Section)” may be referred to.Article 11 If the installation company found quality problem existed in pressure parts, which will impact the safety operation of boiler before and during installation, the company shall stop the installation and report to local safety supervisory agency, and the safety supervisory agency shall give its instructions for the raised quality problem as early as possible.Article 12 Sectional acceptance of boiler installation quality and hydraulic test shall be carried out jointly by the installation company and operation unit. During general acceptance, usually, the safety supervisory agency shall send person to take part in, in addition to the boiler installation company and operation unit.After boiler installation acceptance, the installation company shall handover the technical documents and construction quality certificate, etc related to boiler installation to the operation unit for placing on file. Article 13 Boiler operation unit shall handle the registration formalities for each boiler according to “Boiler Operation Registration Measures” issued by the former Ministry of Labor and Personnel. Those not registered are not allowed to put into operation.Article 14 Boiler operation unit shall conduct the firemen management according to “Management Measures for Safety and Skill Examination of Boiler Firemen” issued by the former Ministry of Labor and Personnel”. Boilers without firemen who are qualified for the corresponding boilers, are not allowed to be put into operation.Article 15 Operation management for boilers used for power generation in electrical power system and management examination of the operators shall be conducted according to the related stipulations in “Supervisory Regulations for Electrical Industrial Boilers”.Article 16 Boiler operation unit and its management department shall assign special or part-time personnel to be in charge of the safety management of boiler equipment and do a good job in the boiler operation management based on the requirements in this Regulation.Boiler operation unit shall work out the operation procedure to ensure boiler safety operation and safety management system of explosion-proof, fire-proof, poison-proof, etc and accident handling methods based on boiler structure, combustion pattern and operation requirements, and implement them earnestly.Boiler operation unit shall work out and implement the system of maintenance and repair and period maintenance for boilers and their safety accessories. For boilers with automatic control system, system to calibrate and maintain the automatic instruments periodically shall be set up.Article 17 Drawings and relative technical specifications shall be available for major repairs of boiler pressure elements, such as replacing and mending by replacing the damaged parts of barrel (drum), flue, return-firing chamber, head, flue top, tube sheet, bottom belt, and header, patch weld of major welding, expansion joint of tubes changed to welding joint, and replacing large amount of heating tubes. Technical specification for repair may refer to the technical standard of boiler speciality and the relative technical stipulations. After repairing, the boiler operation unit shall place the technical data, such as drawings, material quality certificate, repairing quality inspection certificate on boiler technical file. Article 18 When repairing the operating boiler, it is strictly forbidden to repair pressure element under pressure or high boiler water temperature. When welding is used to repair pressure element, it is strictly forbidden to weld while there is water inside. Article 19 The technical requirements for modification of boilers and their pressure elements may refer to the technical standard of boiler speciality and the relative technical stipulations.For modifications to improve boiler operation parameters, the modification scheme shall include the necessary calculation data. Since the structure and operation parameters are changed, water treatment measures and safety accessories shall match the new parameters.Article 20 After completion of boiler modification, boiler operation unit shall place the technical data, such as drawings, material quality certificate, construction quality inspection certificate, on boiler technical file.Chapter 3 MaterialsArticle 21 Metal materials and welding materials, etc. used in boiler pressure elements shall conform to the relative national standard and industrial standard. The material production units shall ensure the material quality and provide quality certificate. Metal materials and weld metal shall have the specified strength, ductility, elongation and good fatigue resistance and corrosion resistance under operation conditions. Steel plates, steel tubes and welding materials used for repairing boiler pressure elements shall be the same material brand or with the same property as the original material in the repair parts.Article 22 Metal materials used for manufacturing boiler pressure elements shall be of killed steel. The elongation5 of plates at 20 shall not be less than 18%. For Charpy of carbon steel and carbon manganese steel under room temperature (“V” type notch sample) shock absorption power shall not be less than 27J.Article 23 Metal materials used in boiler pressure elements shall be selected according to the following requirements:1. Steel plateTable 3-1 Boiler steel plateType of steelSteel gradeStandard No.Applicable rangeOperation P (MPa)Wall T ()Carbon steelQ235-A, Q235-BGB700GB32741.0See note Q235-C, Q235-D-15, 20GB710, GB711GB132371.0-20RGB6654YB (T) 405.945020g22gGB713YB (T) 415.9450Alloy steel12Mng, 16MngGB713YB (T) 415.940016MnRGB6654TB (T) 405.9400Note:When used for boiler pressure elements with rated steam pressure exceeding 0.1MPa, the components shall not contact flame. Aging shock test shall be performed and qualified. Operation pressure shall not be limited when manufacturing the drum not exposed to radiation heat.2. Steel tubesTable 3-2 Boiler steel tubesType of steelSteel gradeStandard No.Applicable rangeUsageOperation P (MPa)Wall T ()Carbon steel10, 20GB8163Heating surface tubes1.0Headers, steam pipes10, 20GB3087YB (T) 33Heating surface tubes5.9480Headers, steam pipes43020GGB5310YB (T) 32Heating surface tubesNot limited480Headers, steam pipes430Alloy steel12CrMoG15CrMoGGB5310Heating surface tubesNot limited560Headers, steam pipes55012CrlMoVGHeating surface tubes580Headers, steam pipes56512Cr2MoWVTiBGB5310Heating surface tubes60012Cr3MoVSiTiBNote: It may be increased to 450, when service life is requested to be within 20 years. When oxidation losses is considered during strength calculation, it may be raised to 620.3. Forge pieceTable 3-3 Boiler forge piecesType of steelSteel gradeStandard No.Applicable rangeOperation P (MPa)Wall T ()Carbon steelQ235-A, Q235-BQ235-C, Q235-DGB7002.535020, 25GB6995.9450Alloy steel12CrMoZBJ98016Not limited54015CrMo55012CrlMoV56530CrMo35CrMoNot limited45025Cr2MoVANot limited510Note: Operation pressure shall not be limited for forge pieces not exposed to flame. Hollow cylinder type fittings meeting the following requirements may be machined with rolled or forged round steel of corresponding steel grade except various types of flanges;a. Outer diameter of carbon steel fittings not greater than 160mm, outer diameter of alloy steel fittings or pipe cap ranges fittings not greater than 114mm;b. Machined pipe fittings are qualified after non destructive test;c. Longitudinal axis of fittings in parallel with that of round steel.4. Cast steelTable 3-4 Boiler cast steelType of steelSteel gradeStandard No.Applicable rangeNominal Pressure (MPa)Wall T ()Carbon steelZG200 - 400GB11352ZBJ980156.3450ZG230 - 450Not limited450Alloy steelZG20CrMoZBJ98015Not limited510ZG20CrMoVNot limited540ZG15CrlMolVNot limited5705. Cast ironTable 3-5 Boiler cast ironType of cast ironBrandStandard No.Applicable rangeAccessory nominal latus rectum (mm)Nominal P (MPa)Medium T ()Gray cast ironNot lower than HT150GB9439JB/T26393000.82302001.6230Ductile cast ironKTH300-06KTH300-08KTH300-10KTH350-12GB94401001.6300Spheroidal graphite ironQT400-18GB1348JB/T26371501.63001002.5QT450-10GB13481501.63001002.5Note: Blow down valve and blow down elbow sha

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论