3503-J502交流电动机安装检验与空载运行记录_第1页
3503-J502交流电动机安装检验与空载运行记录_第2页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

SH/T 3503-J502交流电动机安装检验与空载运行记录Inspection Record of AC Motor Installation and Idle Operation 工程名称:Project:单元名称:Unit:Item No.Driving machineName plateModelRated power kWNo. of explosion proof certificate Stator voltage VRotor voltage VManufacturerStator current ARotor current ADate of Ex-workRotating speed rpmInsulation gradeSerial No.Inspection items and requirementsResultMotor and wiringParameters on nameplate, type and class of explosion proof, as well as categorization shall be compatible with requirement of design.In junction box, the connection shall be correct, well fastened and insulated; electrical clearance and creepage distance shall be arranged as requirement.Flameproof surface and inlet gland of explosion proof junction box shall comply with requirement, bolts and check washers shall be complete and reliable. Motor and its starting up device shall be earthed as specified.Insulation resistance of stator winding shall be measured. MWSurface of collector ring shall be clean and smooth; brush yoke, brush rigging and brush shall be mounted according to requirement.Proper amount of quality grease (oil) shall be injected into bearings as per technical requirement. Rotator can be turned smoothly without obstruction.CircuitSet point for short circuit protection device shall comply with design. Set point of overload protection device shall comply with design.Insulation resistance of main circuit. MWInsulation resistance of control circuit. MWFunction of analogue operation of control, protection and interlock circuits shall be consistent with requirement of design. Idle operationStator current ARotator currentA Double amplitude value mmTemp. of motor Temp. of bearingAt loaded end: ; At unloaded end: Duration hDateAmbient Temp. Conclusion: Owner/Construction Supervision ContractorGeneral ContractorConstruction ContractorDiscipline engineer:Date:Discipline engineer:Date:Discipline engineer:Quality inspector:Construction foreman:Date:E.2 SH/T3503J502“交流电动机安装检验与空载运行记录”用于同步电动机和异步电动机,对于1000V及100kW以下的鼠笼电动机只填写此记录,不再填写交流电动机试验记录,故记录中列有“测量定子绕组的绝缘电阻”栏,绝缘电阻应在电动机接线前测量,下列栏目按说明填写:“轴承润滑脂(油)及填充量符合产品技术文件规定”栏,既不拆卸端盖也不更换润滑脂时,此栏填写“”;当拆卸端盖只更换润滑脂,而不进行电机抽芯检查时填写此栏,并写明润滑脂牌号,但不再填写电机抽芯检查记录;“短路保护设备整定值符合设计文件要求”和“过载保护设备整定值符合设计文件要求”栏,在“检查结果”栏中填写设备名称(如低压断路器、熔断器、热继电器

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论