已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
交 工 文 件 目 录contents of documents for project hand over 施02 编号no: 单位(子单位)工程名称name of unit project文件内容contents of documents通风与空调工程施工记录record of ventilation and air conditioning works序号no.交工文件名称name of documents of project hand over页数page备注remarks1设备开箱检查记录record of equipment box-open inspection通012基础验收记录record of foundation acceptance通023垫铁隐蔽记录inspection record of sizing blocks concealment通044隐蔽工程(系统封闭)检查记录record of concealed works (system enclose) inspection通035设备安装检查记录re cord of equipment installation inspection通076静置设备安装检查记录record of stationary equipment installation inspection通087阀门试验(清洗)记录record of valves test (cleaning) 通058风管漏光检测记录air duct check and measuring for light leakage风019风管漏风检测记录record of check and measuring for air duct leakage风0210管道(设备)强度试验记录record of pipeline (equipment) hydraulic pressure test水0111辅助设备水(气)压试验记录record of water(air)pressure test of auxiliary equipment水0312消声器安装记录 record of silencer installation 风0313风机盘管试验记录record of fan-coil test风0414变风量末端装置试验记录test record of air varying terminal device风0515净化系统风管清洗记录record of air ducts of purifying system washing风0616层流罩(风机过滤单元)安装记录record of laminar flow cover (fan filtering unit) installation 风0717空气净化系统检测记录record of air purifying system check and measuring风0818单机试运转记录record of single machine test run通0919风系统调试记录 record of ventilation system commissioning风0920通风空调系统无生产负荷联合试运转记录record of ventilation & air-conditioning system non-load combined test running 风1021设备/管道防腐、保温或保冷、涂漆施工记录record of anticorrosion、insulation、painting of equipment /pipeline通06 质量部门负责人: 制表人: 年 月 日quality dept. in charge: sheet maker year/month/day风管漏光检测记录air duct check and measuring for light leakage 风01 编号no:_单位工程名称name of unit project子分部工程名称name of divisional project 分项工程名称name of sub-divisional project光源功率power of light source设计风压(mpa)design air pressure检测日期inspection date施工图号(系统名称)construction drawing no. (system name)实测记录measured record部位position风管缝长 (m)air duct seam length检测结果check result部位position风管缝长 (m)air duct seam length检测结果check result检测结果:check result:监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day风管漏风检测记录record of check and measuring for air duct leakage 单位工程名称name of unit project子分部工程名称name of divisional project分项工程名称name of sub-divisional project试验日期test date施工图号(系统名称)construction drawing no. (system name)风管级别grade of air duct系统总面积(m2)total area of the system试验总面积(m2)total area of the test 试验压力(pa)test pressure系统测定分段数measured system sections 允许单位面积漏风量(m3/m2.h)permitted air leakage per unit area实测单位面积漏风量(m3/m2.h)measured air leakage per unit area分段实测数值measured values of the sections序号no.分段表面积(m2)surface area of the section工作压力(pa)working pressure试验压力(pa)test pressure实测漏风量(m3/h)measured air leakage1234检测区图示:illustration of test area:检测结果:check result:监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day 风02 编号no:_消声器安装记录 record of silencer installation 单位工程名称name of unit project江干区全民健身中心子分部工程名称name of divisional project送排风系统分项工程名称name of sub-divisional project风管部件与消声器制作系统编号system no. 序号no.型号type规格spec.安装位置、方向orientation of installation 支吊架设置support and suspending frames01消声静压箱符合设计及施工规范要求独立设置、结构合理020304050607080910111213141516171819202122232425 风03 编号no:_班组长: 施工员: 质检员: 年 月 日monitor of work team: technician: quality inspector: year/month/day风机盘管试验记录record of fan-coil test 单位工程名称name of unit project子分部工程名称name of divisional project分项工程名称name of sub-divisional project系统编号system no.试验仪器型号、精度type & accuracy of test instru.序号no.规格型号spec. and type数量(台)number(set)单机试运转情况single machine test run result水压试验情况hydraulic pressure test试验结果test result工作压力(mpa)working pressure试验压力(mpa)test pressure观察时间(min)duration010203040506070809101112131415161718监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day 风04 编号no:_变风量末端装置试验记录test record of air varying terminal device 单位工程名称name of unit project子分部工程名称name of divisional project分项工程名称name of sub-divisional project系 统 编 号system no.序号no.规格型号spec. and type数量(台)number(set)动作试验情况details of action test试验结果test result01020304050607080910111213141516171819监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day 风05 编号no: 净化系统风管清洗记录record of air ducts of purifying system washing 单位工程名称name of unit project子分部工程名称name of divisional project分项工程名称name of sub-divisional project清洗日期cleaning date施工图号(系统名称)construction drawing no. (system name)风管材质air duct material清洗剂名称name of detergent清洗方法cleaning mode管段号pipeline sect. no.检查方法inspection mode检查结果inspection result管段号pipeline sect. no.检查方法inspection mode检查结果inspection result清洗结果:cleaning result:风06 编号no:_ 班组长: 施工员: 质检员: 年 月 日monitor of work team: technician: quality inspector: year/month/day层流罩(风机过滤单元)安装记录record of laminar flow cover (fan filtering unit) installation 单位工程名称name of unit project系统编号system no.子分部(分项)工程名称name of sub-divisional project洁净室级别grade of clean room层流罩laminar flow cover 水平度允许偏差permitted error of levelness1/1000高度允许偏差permitted error of height 1mm型号type支吊架设置support and suspending flames实际偏差actual error水平度(mm/m)levelness高度(mm)height风机过滤单元fan filtering unit型号type安装方向orientation of installation 泄漏测试方法 leakage test mode 泄漏测试情况result of leakage test 风07 编号no:_班组长: 施工员: 质检员: 年 月 日 monitor of work team: technician: quality inspector: year/month/day空气净化系统检测记录record of air purifying system check and measuring 单位工程名称name of unit project系统编号system no.子分部(分项)工程名称name of sub-divisional project洁净室级别.grade of clean room仪器型号instrument type仪器编号instrument no.高效过滤器high effective filter型号type数量(套)number (set)测试方法及结果:test method and result:室内洁净度clean degree洁净室面积(m2)clean room area测试方法test mode 实测洁净室等级measured grade of clean room测试人员people for the test 监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day 风08 编号no:_风系统调试记录 record of ventilation system commissioning单位工程名称name of unit project试运转日期test run date年 月 日year/month/day子分部(分项)工程名称name of sub-divisional project设计总风量(m3/h)design total air qt.实测总风量(m3/h)measured total air qt.测量仪器型号、精度type & accuracy of test instru. 序号no.系统名称name of system 风口形式air port type风口规格air port spec.设计风量m3/hdesign air quantity实测风量m3/hmeasured air quantity试验结果:test result:试运转人员people for test run 监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction corporation:班组长:monitor of work team: (公章)施工员: (seal)technician: 质检员: quality inspector: 年 月 日 year/month/day 风09 编号no:_通风空调系统无生产负荷联合试运转记录(一)record of ventilation & air-conditioning system non-load combined test running (1)单位工程名称name of unit project试运转日期test running date年 月 日year/month/day子分部(分项)工程名称name of sub-divisional project试运转测试仪表或设备情况精度等级:precision grade of equipment or instrument test and measuring for test running:项目items序号no.内容contents结果result判定judgement空调工程air conditioneng.1总风量与设计值比较total air quantity in comparison with the design value2冷、热水总流量与设计值比较total cold and hot water flow in comparison with the design value3舒适空调的温度、相对湿度comfortable temperature and relative humidity of conditioners4恒温恒湿房间室内温湿度、相对湿度及波动范围temperature、relative humidity and fluctuation range in the constant temperature and humidity room5空调机组水流量与设计值比较flow of air conditioning unit in comparison with the design value6与ba、fa配合情况situation of matching to ba、fa7多台冷却塔进出水量均衡情况situation of water input and output balance between cooling towers8其他others通风工程ventilationeng.1各风口或吸风罩风量与设计值比较air quantity in air ports or air inducing covers in comparison with the design value2湿式除尘器供排水情况water supply and drainage in humid dust cleaner3设备及主要部件的联动情况combined running of equipment and major parts试运转联动结果:result of test running:试运转人员people for test running监理(建设)单位:supervision company (the owner): (公章)监理工程师: ( seal )supervising engineer:(建设单位代表):(representative of the owner): 年 月 日year/month/day施工单位:construction company:班组长:monitor of work team: (公章)施工员: ( seal )technician: 质检员: quality inspector: 年 月 日year/month/day 风10 编号no: 通风空调系统无生产负荷联合试运转记录(二)record of ventilation & air-conditioning system non-load combined test running (2) 单位工程名称name of unit project试运转日期test running date年 月 日year/month/day子分部(分项)工程名称name of sub-divisional project试运转测试仪表或设备情况精度等级:precision grade of equipment or instrument test and measuring for test running:项目items序号no.内容contents结果result判定judgement洁净空调工程cleaningconditioncng.1单向流洁净室系统总风量与设计值比较system total air quantity in one-way clean room in comparison with the design value2室内各风口风量与设计值比较air
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 肿瘤筛查的护理个案
- 大脑前动脉狭窄的护理
- 2026年网络预约出租汽车驾驶员从业资格考试题库含答案【考试直接用】
- 2025贵州黔南州粮油储备库主任选聘笔试模拟试卷附答案解析
- 2026天津市定向同济大学招录选调生历年真题汇编附答案解析(夺冠)
- 2025北京大学人事部大数据分析与应用技术国家工程实验室招聘劳动合同制工作人员1人笔试模拟试卷带答案解析
- 全球环境基金“长江经济带生物多样性就地保护”项目招聘3人备考题库附答案
- 浙江国企招聘-2025台州市椒江城市发展投资集团有限公司台州市高铁新区开发建设有限公司公开招聘工作人员及特殊人才14人历年真题汇编带答案解析
- 2026年国家家能源投资集团有限责任公司高校毕业生直招备考题库(900人)附答案
- 2026年陕西省选调生招录(面向厦门大学)笔试模拟试卷附答案解析
- 音乐学专业就业规划
- 家电维修人员技能培训模式创新研究
- 培训机构教务老师的工作内容与职责
- 房地产精装装修培训讲师
- JJF(京) 77-2021 真空干燥箱校准规范
- 2024年人教版四年级上册道德与法治知识点(背诵资料)
- 《跨文化传播教程》全套教学课件
- SH/T 0358-199510号航空液压油
- GB/T 15597.1-2024塑料聚甲基丙烯酸甲酯(PMMA)模塑和挤出材料第1部分:命名系统和分类基础
- JTG-3830-2018公路工程建设项目概算预算编制办法
- JGJ33-2012 建筑机械使用安全技术规程
评论
0/150
提交评论