全文预览已结束
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
October 2013 Octobre 2013 IEC 62271-103 (First edition 2011) High-voltage switchgear and controlgear Part 103: Switches for rated voltages above 1 kV up to and including 52 kV CEI 62271-103 (Premire dition 2011) Appareillage haute tension Partie 103: Interrupteurs pour tensions assignes suprieures 1 kV et infrieures ou gales 52 kV C O R R I G E N D U M 1 6.101.7.3.3 Characteristics of supply circuit Replace the first existing sentence of second paragraph of this subclause by the following new paragraph: TDsb and TDbb: For capacitor bank switching tests, the characteristic of the supply circuit shall be such that the voltage variation (voltage increase after making, voltage decrease after breaking) is less than 2 % for TDsb1 and TDbb1 and less than 5 % for TDsb2 and TDbb2. 6.101.7.3.3 Caractristiques du circuit dalimentation Remplacer la premire phrase existante du deuxime alina de ce paragraphe par le nouvel alina suivant: TDsb et TDbb: Pour les essais de manuvre de batterie de condensateurs, la caractristique du circuit dalimentation doit tre telle que la variation de tension (augmentation de la tension aprs tablissement, dcroissance de la tension aprs coupure) soit infrieure 2 % pour TDsb1 et TDbb1 et infrieure 5 % pour TDsb2 et TDbb2. Figure 5 General test circuit for three- and single-phase capacitive switching tests Replace the existing table in the figure by the following new table: Test duty Power source Zs TRV- control C1 Rd C2 C3a TDlc1, TDlc2 1) Earthed 2) Isolated Like TDload Like TDload - 0,05Xc Earthed 1):2 C2 2):- not required TDcc1, TDcc2 1) Earthed 2) Isolated Like TDload Like TDload - 0,05Xc Earthed 1):2 C2 2):- not required TDsb1,TDsb2 1) Earthed 2) Isolated sb1 0,02Xc sb2 0,05Xc, and actual Isc rated Isc Like TDload - - 1) Isolated or earthed 2) Earthed - TDbb1, TDbb2 1) Earthed 2) Isolated bb1 0,02Xc bb2 0,05Xc, and actual Isc rated Isc Not specified 1) Isolated or earthed 2): earthed - Like C1 - Copyright International Electrotechnical Commission Provided by IHS under license with IEC -,-,- October 2013 Octobre 2013 1) For tests of a switch intended for use in effectively earthed neutral systems. 2) For tests of a switch intended for use in non-effectively earthed neutral systems. For convenience of testing, it is equivalent to earth the supply circuit and to isolate the load circuit. a For C3, equivalent capacitance circuit may be used instead of the parallel capacitor bank represented. Figure 5 Circuit dessai gnral pour essais triphass et monophass de manoeuvre de charges capacitives Remplacer le tableau existant dans la figure par le nouveau tableau suivant: Squence dessais Source dalimentation Zs Commande de TTR C1 Rd C2 Ca3 TDlc1, TDlc2 1) Mise la terre 2) Isole Comme TDload Comme TDload - 0,05Xc Mise la terre 1):2C2 2):- non requis TDcc1, TDcc2 1) Mise la terre 2) Isole Comme TDload Comme TDload - 0,05Xc Mise la terre 1):2C2 2):- non requis TDsb1,TDs b2 1) Mise la terre 2) Isole sb1 0,02Xc sb2 0,05Xc, et Isc rel Isc assign Comme TDload - - 1) Isole ou mise la terre 2) Mise la terre - TDbb1, TDbb2 1) Mise la terre 2) Isole sb1 0,02Xc sb2 0,05Xc, et Isc rel Isc assign Non spcifi 1) Isole ou mise la terre 2): mise la terre - Comme C1 - 1) Pour les essais dun interrupteur destin tre utilis dans des rseaux neutre mis la terre. 2) Pour les essais dun interrupteur destin tre utilis dans des rseaux neutre isol et compens par bobine dextinction. Pour commodit de test, il est quivalent de mettre la terre le circuit dalimentation et disoler le circuit de charge. a Pour C3, un circuit de
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 风险管理与损害防阻
- 行业分析主要内容有行业特征分析
- 网络货运行业薪酬水平分析
- 直播电商行业供应链分析
- 生物医药行业新前景分析
- 株洲温暖行业分析
- 鞍山万科惠斯勒小镇
- 汽车零配件基础知识及报价实务事项
- 保险理赔担保协议书
- 刚入职酒水行业的市场分析
- 日立原子吸收分光光度计Z2300使用说明
- 房地产开发公司工程竣工验收及移交管理办法
- 【组织结构】组织机构设置和调整的管理办法汇编模版
- 穿孔机调整参数及常见缺陷
- 微变等效电路共集放大电路
- 污水管道安装安全技术交底.doc
- (最新整理)绝味鸭脖员工手册
- 晚托协议书(精选3篇)
- 成都市万兴环保发电厂污泥干化及协同焚烧处置项目环境影响
- 月子中心护理部护理档案模板
- 医学遗传学:系谱分析
评论
0/150
提交评论