已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
BOEOT B1 PROJECT CONDITIONS OFBEIJING,CHINA TENDERFIRE PROTECTION SUBCONTRACT WORKS FORM OF TENDER BONDBy this Tender Bond we _ whose registered office is at (hereinafter called “the Tender”)and_ whose registered office is at _ (hereinafter called”the Sureties”)are held and firmly bound unto the(hereinafter called”the Employer”) in the sum of RMB _(RMB _)for the payment of which sum the Tenderer and the Sureties bind themselves their successors and assignees jointly and severally by these present. Sealed with our respective seals and dated this_ day of _ 2004Whereas(1) The Employer has invited the Tenderer and other persons to complete Tenders in similar terms for carrying out works (hereinafter called”the Works”)and to submit the same for consideration by the Employer.(2) The Tenderer herewith submits to the Employer a proposal(hereinafter called”the Tender”)in accordance with such invitation and has agreed by the above written Tender Bond to provide security for the due performance by him of the undertaking and obligations in the Tender on his part contained therein.Now the conditions of the above written Tender Bond are such that:(a)If the Tender is accepted by the Employer within 2 months from the _day of _.2004and the tenderer shall provide a surety or sureties in accordance with Clause 13of the Conditions of Tender,or.(b)If the Tender is not accepted by the Employer within 2 months from the _ day of _ .2004or if before the expiration of that period of 2 months a Tender from another person for carrying out the Works shall have been accepted by the Employer and that person shall have provided a surety in accordance with this undertaking in accordance with Clause 13 of the Conditions of Tender then this obligstion shall be null and void but otherwise shall be and remain in full force and effect but no alteration in forgiveness in or in respect of any matter or thing concerning the Tender on the part of the Employer shall in any way release the Surety from any liability under the above written Tender Bond.BOEOT B1 PROJECT CONDITIONS OFBEIJING,CHINA TENDERFIRE PROTECTION SUBCONTRACT WORKS FORM OF TENDER BOND(Contd)We further agree,in the event of our failure to execute such Subcontract within fifteen(15)days of its being left for execution at the address given below,that any acceptance of this Tender may be revoked bu the Employer without prejudice to any other rights or remedies which he may have in respect of such failure.Dated this _ day of _ 2004.Signed: _ Signed: _On behalf of : _ On behalf of : _ Address: _ Address: _ Signed: _ Signed: _On behalf of : _ On behalf of : _Address: _ Address: _ _ _ BOEOT B1 PROJECT FORM OF TENDERBEIJING,CHINA FIRE PROTECTION SUBCONTRACT WORKS FORM OF TENDER forFIRE PROTECTION SUBCONTRACT WORKS forBOEOT B1 PROJECTatBLOCK55,BEIJING ECONOMIC-TECHNOLOGICALDEVELOPMENT AREA,CHINAforBEIJING BOE OPTOELECTRONICS TECHNOLOGYCO,LTDFrom.Date.NOTE:(1)If a tender is being submitted by a partnership or an unincorporated body, the name and residential address of all partners should be given in the spaces provided below.(2)In all cases,the tender must give the number and date of their business registration certificate here:Number Date .To:BEIJING BOE OPTOELECTRONICS TECHNOLOGY CO,LTDNO.10Jiuxiangiao Road,Chaoyang District,Beijing,100016China1. I/We,having inspected the site and examined the Tender DocumentsClause 1 of the Conditions of Tender,for the Fire Protection Subcontract Works for BOEOT B1 Project at Block 55,Beijing Economic-Technological Development Area The Subcontract Works,do hereby offer to execute,complete and maintain the whole of The Subcontract Works all in accordance with the Tender Documents.BOEOT B1 PROJECT Form of TenderBEIJING,CHINA FIRE PROTECTION SUBCONTRACT WORKS FORM OF TENDER(Contd) for the sum of Ren Min Bi(RMB)or such sums as may be ascertained in accordance with the Conditions given in the Tender Documents.2. I/We undertake if my/our tender is accepted to commence the Subcontract Works within weven(7) days of receipt of the Engineers order to commence and to complete the Subcontract Works comprised in the Tender Documents within the period as stated in the Tender Documents.3. I/We agree to abide by this Tender for a period of 60 days from the date fixed for receving the same and it shall remain binding upon me/us and may be accepted at any time before the expiration of that period.4. Unless and until the Subcontract is prepared and executed thes Tender together with your written acceptance thereof by the Engineer on behalf of the Employer or with written acceptance thereof by the Main Contractor, subject to the provision of Clause 3 hereof, shall constitute a binding contract.5. I/We understand that you are not bound to accept the lowest or any Tender.(Signature page follows)BOEOT B1 PROJECT Form of TenderBEIJING,CHINA FIRE PROTECTION SUBCONTRACT WORKS FORM OF TENDER(Contd)SignatureIn the capacity of.Duly aothorized to sign tenders for and on behalf of Registered address of firm. Signature of Witness. Name&Block Letters.Address.Occupation.Name of Partners Residenitial Address of Partners. . .*In the case of a limited company,insert name of company. In the case of a partnership or unincorporated body,the names of all partners must be inserted.BOEOT B1 PROJECT BEIJING,CHINA FIRE PROTECTION SUBCONTRACT WORKS FORM OF PERFORMANCE SECURITYAddress:Sir,Whereas our client Messrs_(hereinafterCalled”the Subcontractor”)have entered into a Sub-Contract known as Contract No._(herniafter called”the Sub-Contract”)with the _(hereinafter called”the Employer”)on behalf of the Contractor to be appointed by the Employer for the _(hereinafter called”the Works”)and the Sub-Contract requires the provision of a performance security by the Employer on behalf of the Contractor.Now therefore we,(hereinafter called “the Surety”)are held and firmly bound unto the Employer in a sum not exceeding RMB(RMB)for the payments of which sum we bind ourselves and our assignees by these present.Now the condition of the above written Bond is such that if the Subcontractor fails to perform and observe all the terms,provisions,conditions and stipulations of the said Sub-Cntract on the Subcontractors part to be performed and observed according to the true purport intent and meaning thereof or if on default by the Subcontractor,the Surety shall satisfy and discharge the damages or losses and shall pay all costs,expenses or otherwise sustained by the Main Contractor the damages or losses and shall pay all costs,expenses or otherwise sustained by the Employer thereby up to the amount of the above-wtitten Bond on the Contractors first return demand notwithstanding any contesing or protest by the Subcontractor or by the Surety or by any other third party and shall pay all costs,expenses or otherwise shall be and remain in full force and effect but no alteration in terms of the said Sub-Contract made by the Agreement between the Main Contractor and the Subcontractor or in the extent or nature of the Works to be executed and maintained thereunder and no allowance of time by the Contractor under the said Sub-Contract nor any forbearance or forgivenessin or in respect of any matter or thing concerning the said Subcontractor on the part of the Contractor shall in any ways release the Surety from any liability under the above written Bond.The Surety shall not be discharge or released from this Guarantee by any arrangement between.BOEOT B1 PROJECT BEIJING,CHINA FIRE PROTECTION SUBCONTRACT WORKSThe Subcontractor and the Contractor with or without the consent of the Surety or by any alteration in the obligations undertaken by the Subcontractor or by any forbearance whether as to payments,time,performance or otherwise,but the Surety shall be entitled to be informed of such arrangements or alteration.This Bond shall be irrevocable and shall remain in force and effect untilthe expiry date of the Maintenance Period of Main Contract Works stated in the said Sub-Contract computed from the date of completion of the Works or any authorized extension thereofor( )month from the Commencement Date of Sub-Contract Works.claims,if any must be received by the Surety within the validity periods of the Bond.Given under our hand the date mentioned above.Signed ,sealed and delivered By the said Surety in the Presence of Name: _Designation : _Witness : _Name : _ Bankers Seal: _Designation : _ BOEOT B1 PROJECT SPECIFICATIONBEIJING,CHINA PRELIMINARIESFIRE PROTECTION SUBCONTRACT WORKSPRELIMINARIES(Contd)15.0 Main Contract Conditions15.01 The Subcontractor shall be deemed to have had notice of all Main Contract Conditons except the prices of the Main Contractor.Documens describing the Main Contract Conditions may be seen at the office of the Engineer during normal office hours.15.02 The Main Contract Conditions shall include but in no way be limited to the Part of the FIDIC”Conditions of Contract for Works of Civil Engineering Construction,Fourth Edition 1987 reprinted 1992 with further amendments.and Special Conditions of Conditions of Contract as adapted by the Employer and the Main Contracor which form part of the Main Contract.15.03 The Subcontractoe shall comply with all the provisions of the said Schedule of Conditions including any amendments thereto described in other Main Contract Conditions insofar as they apply to the Subcontract Works and are not inconsistent with the express provisions of the Subcontract.16.0 Appendix to the Conditions of Main ContractThe following particulars have been inserted in the Appendix to the Conditions of Main Contract and/or the Letter of Acceptance of the Main Contract:Sub-clauseAmount of security(if any)10.1 Ten per cent of the Contract Price _Minimum amount of third part 23.2 RMB5000000000 per occurrence,with theInsurance number of occurrence unlimitedTime for issue of notice to commence 41.1 seven daysTime for Completion from 43.1 CommencementKey Date(i)RC structure of Waffle(Column &beam) in Clean room 100daysKey DATE(ii)Whole RC structure of FABIncluding light weight concrete roof slab 118daysKey Date(iii)Finish including Clean Room ex
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年吉林交通职业技术学院单招职业适应性考试题库及答案解析(夺冠系列)
- 2026年安徽电气工程职业技术学院单招综合素质考试必刷测试卷及答案解析(名师系列)
- 2026年天津理工大学中环信息学院单招职业技能考试必刷测试卷及答案解析(夺冠系列)
- 2026年河源职业技术学院单招职业技能测试必刷测试卷及答案解析(名师系列)
- 2026年南京科技职业学院单招职业适应性考试题库带答案解析
- 2026年吉林城市职业技术学院单招职业技能考试必刷测试卷附答案解析
- 2026年太原城市职业技术学院单招职业适应性测试题库附答案解析
- 2026年唐山工业职业技术学院单招综合素质考试题库带答案解析
- 2026年四川护理职业学院单招职业技能测试题库及答案解析(名师系列)
- 2026年浙江旅游职业学院单招职业技能测试题库及答案解析(夺冠系列)
- 国家自然科学基金申请经验汇总课件
- 监造手册第三章船体
- 《忆秦娥·娄山关》课件
- 新《高等教育学》考试复习题库450题(含各题型)
- 最新版个人征信报告(可编辑+带水印)
- 科目一1000题及答案
- 供应商现场审核汇报报告
- 连续性肾脏替代治疗(CRRT)质量控制标准
- 大学生模拟法庭情景剧本100篇
- 嘉兴市生态绿道网规划建设技术导则
- 【思维导图】完整小学英语单词3-6年级各单元单词大全单词梳理(人教版)课件
评论
0/150
提交评论