免费预览已结束,剩余91页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CONTENTS1 GENERAL PROVISIONS .11.1 DEFINITIONS . 11.2 INTERPRETATION . 61.3 COMMUNICATIONS . 61.4 LAW AND LANGUAGE . 71.5 PRIORITY OF DOCUMENTS. 71.6 CONTRACT AGREEMENT . 81.7 ASSIGNMENT . 81.8 CARE AND SUPPLY OF DOCUMENTS . 81.9 CONFIDENTIALITY . 81.10 EMPLOYERS USE OF CONTRACTORS DOCUMENTS . 91.11 CONTRACTORS USE OF EMPLOYERS DOCUMENTS . 91.12 CONFIDENTIAL DETAILS. 101.13 COMPLIANCE WITH LAWS . 101.14 JOINT AND SEVERAL LIABILITY. 102 THE EMPLOYER.112.1 RIGHT OF ACCESS TO THE SITE.112.2 PERMITS, LICENCES OR APPROVES.112.3 EMPLOYERS PERSONNEL . 122.4 EMPLOYERS FINANCIAL ARRANGEMENTS . 122.5 EMPLOYERS CLAIMS. 123 THE EMPLOYERS ADMINISTRATION.133.1 THE EMPLOYERS REPRESENTATIVE . 133.2 THE EMPLOYERS PERSONNEL . 143.3 DELEGATED PERSONS . 143.4 INSTRUCTIONS . 153.5 DETERMINATIONS . 154 THE CONTRACTOR .154.1 THE CONTRACTORS GENERAL OBLIGATIONS . 154.2 PERFORMANCE SECURITY . 164.3 CONTRACTORS REPRESENTATIVE . 174.4SUBCONTRACTORS . 184.5 NOMINATED SUBCONTRACTORS . 184.6 CO-OPERATION. 194.7 SETTING OUT. 194.8 SAFETY PROCEDURES . 204.9 QUALITY ASSURANCE . 204.10 SITE DATA . 204.11 SUFFCIENCY OF THE CONTRACT PRICE. 214.12 UNFORESEEABLE DIFFICULTIES . 214.13 RIGHTS OF WAY AND FACILITIES . 214.14 AVOIDANCE OF INTERFERENCE . 214.15 ACCESS ROUTE . 224.16 TRANSPORT OF GOODS . 224.17 CONTRACTORS EQUIPMENT . 234.18 PROTECTION OF THE ENVIRONMENT . 234.19 ELECTRICITY, WATER AND GAS . 234.20 EMPLOYERS EQUIPMENT AND FREE-ISSUE MATERIAL . 244.21 PROGRESS REPORTS . 244.22 SECURITY OF THE SITE . 264.23 CONTRACTORS OPERATIONS ON SITE . 264.24 FOSSILS . 265 DESIGN .275.1 GENERAL DESIGN OBLIGATIONS . 275.2 CONTRACTORS DOCUMENTS . 285.3 CONTRACTORS UNDERTAKING . 295.4 TECHNICAL STANDARDS AND REGULATIONS. 295.5 TRAINING . 305.6 AS-BUILT DOCUMENTS . 305.7 OPERATION AND MAINTENANCE MANUALS . 315.8 DESIGN ERROR . 316 STAFF AND LABOUR.316.1 ENGAGEMENT OF STAFF AND LABOUR . 316.2 RATES OF WAGES AND CONDITIONS OF LABOUR . 316.3 PERSONS IN THE SERVICE OF EMPLOYER . 326.4 LABOUR LAWS . 326.5 WORKING HOURS . 326.6 FACILITIES FOR STAFF AND LABOUR . 326.7 HEALTH AND SAFETY . 326.8CONTRACTORS SUPERINTENDENCE . 336.9CONTRACTORS PERSONNEL . 336.10 RECORDS OF CONTRACTORS PERSONNEL AND EQUIPMENT. 346.11 DISORDERLY CONDUCT . 347 PLANT, MATERIALS AND WORKMANSHIP .347.1 MANNER OF EXECUTION . 347.2 SAMPLES . 347.3 INSPECTION . 357.4 TESTING . 357.5 REJECTION . 367.6 REMEDIAL WORK. 377.7 OWNERSHIP OF PLANT AND MATERIALS. 377.8 ROYALTIES . 388 COMMENCEMENT, DELAYS AND SUSPENSION .388.1 COMMENCEMENT OF WORKS . 388.2 TIME FOR COMPLETION. 388.3 PROGRAMME. 388.4 EXTENSION OF TIME FOR COMPLETION . 398.5 DELAYS CAUSED BY AUTHORITIES . 408.6 RATE OF PROGRESS . 408.7 DELAY DAMAGES. 418.8 SUSPENSION OF WORK . 418.9 CONSEQUENCES OF SUSPENSION. 428.10 PAYMENT FOR PLANT AND MATERIALS IN EVENT OF SUSPENSION . 428.11 PROLONGED SUSPENSION. 438.12 RESUMPTION OF WORK . 439 TESTS ON COMPLETION .439.1 CONTRACTORS OBLIGATIONS . 439.2 DELAYED TESTS . 449.3 RETESTING . 459.4 FAILURE TO PASS TESTS ON COMPLETION . 4510 EMPLOYERS TAKING OVER .4510.1 TAKING OVER OF THE WORKS AND SECTIONS. 4510.2 TAKING OVER OF PARTS OF THE WORKS . 4610.3 INTERFERENCE WITH TESTS ON COMPLETION . 4611 DEFECTS LIABILITY .4711.1 COMPLETION OF OUTSTANDING WORK AND REMEDYING DEFECTS . 4711.2 COST OF REMEDYING DEFECTS . 4811.3 EXTENSION OF DEFECTS NOTIFICATION PERIOD . 4811.4 FAILURE TO REMEDY DEFECTS. 4811.5 REMOVAL OF DEFECTIVE WORK . 4911.6 FURTHER TESTS . 4911.7 RIGHT OF ACCESS. 5011.8 CONTRACTOR TO SEARCH . 5011.9 PERFORMANCE CERTIFICATE . 5011.10 UNFULFILLED OBLIGATIONS . 5111.11 CLEARANCE OF SITE. 5112 TESTS AFTER COMPLETION.5112.1 PROCEDURE FOR TESTS AFTER COMPLETION . 5112.2 DELAYED TESTS . 5212.3 RETESTING . 5212.4 FAILURE TO PASS TESTS AFTER COMPLETION. 5313 VARIATIONS AND ADJUSTMENTS .5413.1 RIGHT TO VARY . 5413.2 VALUE ENGINEERING . 5413.3 VARIATION PROCEDURE . 5413.4 PAYMENT IN APPLICABLE CURRENCIES . 5513.5 PROVISIONAL SUMS. 5513.6 DAYWORK . 5613.7 ADJUSTMENTS FOR CHANGES IN LEGISLATION . 5613.8 ADJUSTMENTS FOR CHANGES IN COST . 5714 CONTRACT PRICE AND PAYMENT .5714.1 THE CONTRACT PRICE . 5714.2 ADVANCE PAYMENT. 5814.3 APPLICATION FOR INTERIM PAYMENTS. . 5914.4 SCHEDULE OF PAYMENTS . 6014.5 PLANT AND MATERIALS INTENDED FOR THE WORKS. 6014.6 INTERIM PAYMENTS . 6114.7 TIMING OF PAYMENTS . 6114.8 DELAYED PAYMENT . 6214.9 PAYMENT OF RETENTION MONEY . 6214.10 STATEMENT AT COMPLETION . 6314.11 APPLICATION FOR FINAL PAYMENT. 6314.12 DISCHA
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2026学年北京版(新教材)二年级上册数学第四单元强化训练试卷(附参考答案)
- 职业性急性氯气中毒的护理
- 2026年土地登记代理人之土地权利理论与方法题库200道含答案【能力提升】
- 2026年网络预约出租汽车驾驶员从业资格考试题库附完整答案(夺冠)
- 2026年网络预约出租汽车驾驶员从业资格考试题库附参考答案【考试直接用】
- 2025新疆机场(集团)有限责任公司阿克苏管理分公司第四季度招聘100人备考公基题库带答案解析
- 中国煤炭开发有限责任公司招聘4人备考题库附答案
- 2026年质量员之土建质量基础知识考试题库及参考答案1套
- 2026年设备监理师之设备监理合同考试题库【a卷】
- 2025浙江宁波北仑区新闻出版局招聘1人备考公基题库带答案解析
- 脐膨出超声表现
- 加强客户尽职调查-履行反洗钱工作职责
- 学堂在线 心理学与生活 章节测试答案
- 安全使用农药培训课件
- 2025年南京市事业单位教师招聘体育学科专业知识试题
- 腹外疝护理课件
- 2025年云南交投集团招聘笔试备考题库(带答案详解)
- 平行论坛活动方案
- 家庭防火安全培训
- 出庭培训课件
- 喷砂房清扫管理制度
评论
0/150
提交评论