A. 1.1.2.5 poisoning accident emergency rescue plans A. 1.1.2.5.1 determination of emergency accidents 1, the production, living area, carbon monoxide poisoning accident, poisoning or casualties. 2, benzene poisoning accident which happened in production area, olefinic materials, waterproof coating (paint) poisoning or casualties. 3, unit, canteen food poisoning accidents, food poisoning or casualties. 4, depending on the degree of injury poisoning personnel, determine the scope of the rescue method and report. A. 1.1.2.5.2 carbon monoxide poisoning After carbon monoxide poisoning accident, the following rescue measures should be taken: 1, immediately lift the poisoning personnel from poisoning area, and open the interior doors and Windows for ventilation. 2, put to the poisoning personnel airiness, warm place for emergency treatment. 3, according to the condition of poisoning personnel, arrange vehicles or dial 120 the ambulance immediately sent to hospital for emergency treatment. A. 1.1.2.5.3 benzene poisoning After benzene poisoning accident, the following rescue measures should be taken: 1, immediately will poisoning from poisoning area, set to air LiuTongChu to rescue. 2, poisoning to regions in a relatively closed point, rescue personnel should be according to the condition of poisoning personnel before the rescue situation, self-protection measures. Such as forced ventilation, and the dismantling of sealing materials and masks or wear a mask, and using the rope live rescue personnel. To prevent the poisoning accidents. 3, according to the condition of poisoning personnel, arrange vehicles, or dial 120 the ambulance rushed to occupational disease specialist hospital for treatment. A. 1.1.2.5.4 food poisoning After food poisoning accident, the following rescue measures should be taken: 1, unit, canteen staff, many people appear the same symptoms such as diarrhea, dizziness, vomiting, should immediately arrange vehicles, or dial 120 the ambulance will poisoning personnel sent to hospital for emergency treatment. 2, will eat meal seal, and sent to the health and epidemic prevention departments assay, to determine the nature of poisoning. A. 1.1.2.5.5 emergency rescue equipment Stretcher, first-aid kit, emergency lighting, interphone, oxygen bag A. 1.1.2.6 mechanical injury accident emergency rescue plan A. 1.1.2.6.1 determination of emergency accidents Equipment damage due to part 1, the production process, equipment malfunction, causing casualties. 2, equipment operator peccancy operation, causing casualties. A. 1.1.2.6.2 relief measures Machinery and equipment damage accidents occurred after the following rescue measures should be taken: 1, the project manager should organize personnel rescue, immediately lift the injured away from the scene of the accident. 2, on-site emergency personnel injury, according to the injured first-aid kit equipment to stop bleeding, bandage, fracture fixation. 3, immediately arrange vehicles or contact 120 ambulances, rushed to the hospital. 4, protect the scene, to cut off the power supply, will be WeiDang around the scene of the accident area. A. 1.1.2.6.3 emergency rescue equipment Stretcher, first-aid kit, emergency lighting, interphone, oxygen bagA. hit the accident emergency rescue preplan 1.1.1.1 object A. 1.1.1.1.1 emergency accidents to determine: 1, production areas, objects against accidents, causing casualties. 2, determine the scope of the rescue method and report. A. 1.1.1.1.2 relief measures 1, immediately injured on a stretcher, or other methods, falling off site, moved to the gate near the site, easy to hospital treatment. 2, on-site emergency personnel injury, according to the injured use first aid equipment, timely rescue. Including the bleeding, bandage, fracture fixation. 3, immediately arrange vehicles or contact 120 ambulances, sent to hospital for emergency treatment. 4, protect the scene of the accident. To keep out, surround bar, closed to prevent the accident spread and expand. A. 2 site civilization construction measures A. 2.1 the site of the project management system A. 2.1.1 general provisions 1. The project should be seriously intends to do well the construction site management, do civilization construction, the safe and orderly, clean, not a nuisance, not harm the public interests. 2. The door head should set up the sign of the contractor. Project shall be responsible for construction site intends to let civilized image management of overall planning and deployment; In accordance with the principle of sound partition panel, do well the construction management planning land area of the field, let civilized image. 3. The project should be eye-catching place of the entrance to the site, intends to publish the following contents: 3.1. Engineering general situation of the brand, including: engineering scale, nature, purpose, the developer, designer, contractor and supervision company, the name of the starting and ending years construction, etc. 3.2. Safety discipline. 3.3. Fire information card. 3.4. No major safety accident time card. 3.5. Safety production, civilized construction. 3.6. Construction site plan. 3.7. The project organization structure and main management intends to list. 4. The project manager should include the construction site management in regular patrol inspection content, and combine with daily management, listen to neighboring units, social public opinion and reflect, pays special attention to the improvement in time. A. 2.1.2 civilization construction management organization A. 2.1.2.1 civilization construction leading group 1. Establish a civilized construction management organization and construction site members include: project manager, construction foreman and safety personnel and equipment. 2. The subcontractors shall obey the unity of the total package units of civilization construction management organization management, and accept the supervision and inspection. 3. The civilized construction management group is responsible for the formulation and implementation of the civilized construction system, evaluation and rewards and punishments. A. 2.1.2.2 civilization construction division of responsibility The division of responsibility project person in charge Site road, wai file and site construction, materials, operations, sanqing Equipment information management in the industry equipment Frame body, the gems four protection The construction of electricity Small and medium-sized machinery management, and stir zone Information security in the industry Labor personnel to coordinate security officer Public security fire prevention safety personnel management Office and living facilities and regional management Encroachments, drainage, preparation peripheral coordination of equipment The scene five card a figure, three columns propaganda forms such as equipment Project to build house and the construction is not a nuisance Emergency care security officer at the scene The construction site, plan, schedule and statistics Visa statements, construction management, construction foreman The finished product protection Technical data in the industry QSE jitc with construction foreman Organization culture construction inspection, summary and evaluation to the project manager A. 2.1.2.3 civilization construction management system 1. The education system: extensive developing civilized construction management, the standard of the civilization worksite construction activities of education, improve the overall civilization construction enthusiasm, initiative, to improve the ideological understanding, to create a secure civilization site makes the worker protection construction items, take good care of construction items, observance of good habit of construction order. 2. Could the system: the site is divided into several manage area, clear responsibility person unit, the contractor and service team, and express. 3. Regular inspection system: regularly once a week, not regular, periodic spot checks by the branch deputy manager organize relevant departments to participate in the civilized construction inspection, evaluation, summary, and document, find out the problem formulation, improvement, carries out the responsibility, the rectification period. 4. Rewards and punishment system: to contribute to the construction of civilization of personnel, the unit reward; In violation of the provisions of civilized construction, loss or damage to the project personnel and units give of the companys reputation. Rewards, punishment and rated by the project, implementation. A. 2.1.3 environmental protection 1. The project should be based on standard of environmental management series intends to set up project environment monitoring system, continuous monitoring information feedback, and to take corrective actions. 2. Construction site sludge and sewage untreated may not be directly discharged into urban drainage facilities and rivers, lakes and ponds. 3. In addition to conform to the provisions of the devices are, may not be in melting bitumen at construction site and burned, linoleum, paint, also can not burn the other can produce toxic or harmful smoke and stench of waste, the use of toxic hazardous waste for earthwork backfill. 4. Construction waste, waste residue should be piled up at designated places, daily to clean up. High altitude construction garbage and waste closed string tube or other measures should be adopted for the clean up handling. Loading of building materials, garbage or waste residue of vehicles, should be taken to prevent the dust float in the sky, falls, or flush the effective measures. The construction site should be according to the need to set up the motor vehicle washing facilities, washing sewage should be handled. 5. After the construction site of underground pipeline, should inform the contractor by the employer before the construction, the marked position, to protect it. Found during the construction of cultural relics or historic sites, explosives, cable, etc., shall stop the construction, protect the good scene, report to the relevant departments, in accordance with the relevant regulations, deal with rear can continue the construction. 6. Need water, power, road and influence in the construction environment, must be approved by the relevant departments, prior notice. Where the pedestrian and vehicle traffic construction, shall be set up, well, candy, covering and marks. 7. The appropriate warm season to afforest decorate the construction site. A. 2.1.4 fire security Site shall establish the guard, according to the need to set up guard, is responsible for the security work on the construction site, and take the necessary security measures. Main management personnel at the construction site of the construction site sh
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 第19课《一棵小桃树》(练习)-2022-2023学年部编版(五四制)七年级语文下册(上海专用)原卷版+解析
- 福建省泉州某中学2024-2025学年九年级上学期期中历史试题(解析版)
- 部编版七年级历史上册期中核心必背知识清单
- 2025-2031全球及中国破乳剂行业研究及十五五规划分析报告 Sample-yangbo
- 审计行业人才选拔面试实战技巧
- 2025年医疗器械注册与生产项目可行性研究报告及总结分析
- 2025年食品溯源技术应用项目可行性研究报告及总结分析
- 2025年先进制造装备研发基地可行性研究报告及总结分析
- 景区执法协勤人员笔试题及答案
- 交警辅警面试题目及答案
- 药剂证书考试题库及答案
- 绳锯施工方案及现场安全操作标准
- 前庭大腺囊肿课件
- 四川美术学院2025年设计考研《64中外设计史》真题与试题解析及答案
- 江苏省2026年普通高中学业水平合格性考试英语仿真模拟卷01(春季高考适用)(全解全析)
- 2025年中铁党建考试试题及答案
- 拯救北极熊课件
- 管业制造安全应急预案范文
- 雨课堂学堂云在线《医患沟通与调适(广州医大 )》单元测试考核答案
- 人工运动场草坪施工方案
- 专科会计职业生涯规划
评论
0/150
提交评论