全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
up at the same time or box body.b.Use bolt box, box fixedly on flat iron, then the flat iron Han is on the reinforcing bar, or directly use to wear a Jin box fixedly on the reinforcing bar, and prop up reinforcing bar so much according to the wall body thickness Han, make noodles and wall honourable even together.5)crest the plank is steady to cover up socket of box:a.Add to annoy a concrete plank, circle bore plank steady cover up socket of box.Mark the position size of a light and beat bore first according to the design diagram, then from bottom upward Ti hole, entrance to cave next small top big.Put the fixed body that the box go together with to up correspond into hole, and fix to mourn plank so much, strach with the high strength grade cement sand after treating to go together with a tube steady cover up firm.b.Sprinkle concrete building now plank etc., should prepare to cover up to mourn hook or stud bolt while needing to install a ceiling fan, lamp or mourning to pack a lamp over the 3 kgs, its mourning to hang dint Ju should promise a loading request and safety.c.Separate a wall steady cover up a switch box, electric outlet box.Such as in the brick wall, and foam concrete wall.etc., Ti slot should play slot both sides first line, width and depth ratio of slot take care of outside path big, depth and width of slot should be bigger than to take care of 1.5 times that of outside path above.The brick wall can be followed side inside the slot to carry on Ti slot with the Zan son, foam concrete wall after canning be sawed into the both sides of slot with the knife, again Ti become slot.Should be first steady to cover up a box after the Ti slot, again connector, take care of road to separate a 1 m each time or so use to plate zinc wire to fix good tube road, finally put on ash combine even together, such as is gypsum plank, proper wear the tube into plank bore and spread to establish into a box, box place.(4)Take care of road dark spread to establish1)take care of a road conjunction:a.Taking care of the road conjunction should use set hoop conjunction.(include to carry to deal with contact a connector)Glue the plastics tube gum of kit to glue with the small brush, the even daubery inserts the pipe into a set of hoop on the outside wall of tube, tube should good enough.The gum after gluing request to glue to connect doesnt move inside the 1 min, the sticky keeps time long, and have watertightness.b.Separate a 1 m each time while taking care of road perpendicularity or level to spread to establish being apart from should have a little bit fixed one, at bent the part should add one in the both ends 300500 mm of arc a little bit fixed.c.Tube enter box, box, a tube wear one bore, connect first to carry to deal with contact, then use inside lock mother fixedly on the box, box, in taking care of bore with a hat type protect a peoples like tube, finally use foam plastics piece good box of.2)the tube road Be dark to spread to establish:a.Sprinkle a concrete wall now road Be dark to spread to establish:At 2 F reinforcing bar in the center, tube enter box box in response to Wei become gradation curved, take care of road to separate a 1 m each time the place is used to plate zinc wire colligation firm, curve part according to have fixed request, leading a tube upward should not lead long, with ability the Wei is curved for quasi-, outside lead a tube to use tube hat to reserve a tube to the wall, treat to dismantle mold after take out tube hat again connector.b.The light tube can lead into a cow leg first inside the wall while being slippery to rise template to spread to establish to take care of road, the slippery mold later on pays a good crest plank, again spread to establish to take care of road to the light.c.Sprinkle concrete building to take care of road inside the plank now dark spread to establish:According to the room inside the building is on all sides the thickness of wall, play the position of ten word lines assurance socket box, will carry to deal with contact, inside lock mother fixedly on the tube bore of box, the use crest hat protects a peoples like tube, and block up a good box of, will fix good box to use machine screw or short reinforcing bar fixedly on the bottom Jin, immediately after spread a tube, taking care of the road should spread to establish the underneath in the bow Jin and the top of the bottom Jin and take care of road each time separate a 1 m to use to plate zinc silk colligation firm.Lead toward the pipe that cuts off a wall, can use tube hat to reserve a tube, take out tube hat to take over again after dismantling a mold.d.Prepare to make a thin type the concrete building plank tube road Be dark to spread to establish:Make sure a good socket box size position, use first to give or get an electric shock the hammer beats bore on the building plank, then below expands bore in the plank, the bore size should is more slightly a little bit big than outside the box and makes use of Gao Zhuang Hes top to install good card iron, will carry to deal with contact, inside lock female pair of pipe fixedly at box bore place, counteract high strength cement sand syrup firmness good, then spread to establish to take care of road, the thickness should be no smaller than 15 mms.e.Prepare to make to take care of road inside a bore dark spread to establish:The soil sets up while mourning to pack a bore plank, the electrician should go together with to all spread to establish to take care of road in time.While mourning to pack a bore plank, seek good socket position in time size, open a light box bore, pull to spread to establish to take care of road.Pipe can from the circle inside the bore plank on carrying to wear to go into into socket, pipe fixedly on the socket box, then box with card iron fix well, use cement sand at the same time syrup to fix good box.f.Take care of road inside the dust layer dark spread to establish:After the popular dust layer is actually, carry on take care of slot of open and dig and dig, then spread and establish and take care of road with Ti, after taking care of road and spreading and establishing in taking care of the top of the road and filling concrete sand syrup, the thickness should be no smaller than 15 mms.(5)Sweep a tube to wear to take lineFor sprinkle concrete structure now, such as wall, building plank should in time along with carry on sweeping a tube while dismantling a mold, for the purpose of detection in time and processing take care of road be blocked up a phenomenon.Mix a structure wall body to the brick, should be while putting on ash carry on sweeping a tube, carry on a modification and return work while there being problem being within the reach of, for the purpose of soil set up to repair wall noodles.Has been swept a tube behind confirm to take care of road unimpeded, wear to take line so much in time, and tube, box, box in time block up well, start construction in the follow-up process in, strengthen have already gone together with the finished product protection of taking care of the road, preventfrom appearing to for two times block.1.18.6.2.3Quality standard1.18.6.2.3.1The lord controls itemThe Zu Ran models to anticipate a tube and it the enclosure material oxygen index number attain the function index sign of above 27%, the Zu Ran models to anticipate a tube get not outdoors heat with easily is clearly spread by the place that the machine hurts to establish.Check a method:Check data, observation check1.18.6.2.3.2General item(1)Using gum to glue one while taking care of a road conjunction is close conjunction and firm;The protection layer is bigger than 15 mms.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 产品经理需求文档撰写范例
- 中小学教师专业发展读书心得
- 家长寄语与孩子成长激励手册
- 古诗词《羁旅诗》教学教案及赏析指导
- 财务会计学原理在线作业设计实例
- 基于第一性原理剖析太阳能电池界面电子动力学与性能关联
- 基于空间转录组学技术解析原发性肝癌空间异质性:洞察与展望
- 初中科学课堂观察教学设计
- 施工技术关键环节与风险控制方案
- 小学英语阅读理解提高训练方案
- 公益诉讼检察课件
- 2023-2024学年语文四年级上册-第六单元主题阅读练习(含答案)
- 医院后勤服务培训课件
- 循证医学试卷与答案
- 黄石第一商圈市场分析
- 新高考“3+1+2”选科模式解读
- 定位技术在物流中的应用
- 涉路施工培训课件
- 《道路勘测设计》课件-第三章 平面设计
- 学堂在线 英文科技论文写作与学术报告 期末考试答案
- 年中考英语复习人教版初中词汇变形
评论
0/150
提交评论