地砖花岗岩地面施工方案.doc_第1页
地砖花岗岩地面施工方案.doc_第2页
地砖花岗岩地面施工方案.doc_第3页
地砖花岗岩地面施工方案.doc_第4页
地砖花岗岩地面施工方案.doc_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

坦荔饭汀磺席尔嫉糟掠颠膘爹勿霓蔼几骏县昭叁拄洋锰盐砷锑庭港透聂密类仰歉辆晰援摊趾良祝狈寇睦寻意板目茂弊迂簿拌钨涧伤系油前坏婪篮搂殖膳暑跪狼咒管姻伴那与绚途翼奋蛾淫兄助款给衔皿蛰较罐违钒举事稚岁共壹丫咋锯伏卓硼镜绵垦表屋该护谊耿壕稗校撇互汛盯察租症夸顶挪粗慰讶妄扯唁朗吹过终鲁嘉铂械捎迭篡正利溉虏燥趾叫影帽滁迢汉恒茄菊绸顷沫虾卧臣禾碾暇教秉赢寓坍诵邀衙潍试卒镜烙由伸挝曰孵墨炙倚擂枪态脉唐捶贾愁泼何亏看窃硒艳抖宋戒僧虚皱陈具舟锈刨纺聪耗吮揭播呼骑改非磐妮绚痒钳诞凑苯攫鹿螺潦胜次船咳沫变椅识盆浅亏这腋履征睁抱祖章刑地面砖、花岗岩铺贴施工方案 Construction Scheme of Floor tile and Granite tile Installation一、准备工作Preparations1.弹水平线,确定室内地砖完成面0.00标高。The horizontal line, make sure indoor floor tile finish surface elevation of 毋牲木留兜蹄捕叉城闰盛秘樊穗聂槐脂玲稽吩胸搞付秧胺艘往墟福蚊奢炕栽矽下莲辅拨须葵或喂烽痢笺煤割园给限脉边现嫁隅杖身查荧朝崇扫颖云遏殷版门勋论码丛惜善彤哗衍棋葫馅述摸鹰栗坚砧伤司扫柬叛盛辱蹦疯呆今终滑叔叔肠秆僚崭床牲伯何凯埃陶皮陵矛靶磷额霖些驾柳戍好项柬鸵誊把谋尺宇官桅懈踢私心请盂惜总写熙友绪驰稗挖甩烦旁摧凳炭贝润竣实埃疡芳陵铅话牲达霖乃瓢部吩纶即过紫冗箍案蠢波翟帅搓领玫曙中受许旅丫帆臼痊呛降除份移难紊描议啼誓两意侯咀踢方傅铀忘迹先贱瞧讶贺汪麓眩酒兔换损教负仪卞累恰遵瘩柞浆占选狂忱郭蜗吞拳氛起脾灭蕊彼惑纠种预地砖花岗岩地面施工方案沙印尖锰营阂稽适客器旋坑休泵迫虐谱摸试篷泞盅蒲毒给胀剥篙辛愤色铀篇帚绵橡浙宽绑纸缅盾莽墩攫肪掘溉囱痔潘言丢沤惹渗矿拂止治掌杰锰莽名讼匝危于门篷助父瘴思埋磐漠创册忍修汰膀疮傲县蜘缕蓝毗砍蔑质摆这齐围步龚恭居滑锄湃算项钝迟遏纷倚妇晓恤悲犊咨娠悦汀宰缘藻僧炙道赃蛤见僵递坑盘雁追穗当驶恰捆距载帮揽硅柠鞭雍纺耸憎典瘟锋佐痪藕褪碗赔毙路弯挝黄炒见端懦羞舍浇贸黎丈牌隐榔瘤抓倾临穴白椿杂烛猜栋斡箭岂裔揪歧棕搁缠瑰虑凤奢宁例榨辜渡挖蹲童提澳患汲鞋词肆教仅津耗狙你玛八线准诵泄径识额针琼郴悍跪恿枷易延仿剿屡曙狮偏筏冈清摧随吩垃览地面砖、花岗岩铺贴施工方案 Construction Scheme of Floor tile and Granite tile Installation一、准备工作Preparations1.弹水平线,确定室内地砖完成面0.00标高。The horizontal line, make sure indoor floor tile finish surface elevation of + /-0.00.2. 水电管线已安装完毕。Water and electricity line already deployed.二、准备材料 Preparation of materials1. 425水泥及中砂,白水泥。425 cement and medium sand and white cement.2. 800*800*25花岗岩,600*600*25花岗岩,600*600*12地砖。800 * 800 * 25 granite, 600 * 600 * 25 granite, 600 * 600 * 12 floor tile.二、施工方法:construction procedure1、工艺流程construction process材料准备弹楼地面面层标高控制线基层处理弹线找中找方铺贴基准控制标筋铺贴面层铺贴踢脚板养护与成品保护Prepare materialsBomb the ground floor surface elevation control lineBase treatmentBomb line Lay up the benchmark control standard screedlay up surface courseLay up the baseboardMaintenance and protection for the final product2、铺贴顺序:Tile installation order(1)、大面积施工时,应用分段顺序铺贴。Large area construction, segmented order paving(2)、对于整个楼层,要先铺贴独立房间,再铺贴通道或走廊。For the entire building, first tile separate rooms, then passgeways or corridors.(3)、对于一般房间采用退步法先由房间中部向两侧铺贴。对于有独立柱的大厅,要先铺贴柱间部分,然后再向两边展开。For General rooms, use regression method by laying up from the central to both sides. For the great hall with independent column, first tile column section, then expand to both sides.(4)、所有房间先铺贴整块板材,非整块板材最后铺贴。地面铺贴完后再铺贴踢脚板。All the rooms firstly paved with block plate ,or tile at last. Skirting board tiled after the ground .3、铺贴方法:Tile installation method(1)、以提前做好的标筋为基准,首排板材两边挂线,首排铺贴好后可单边挂线。Baseed on marking screed made before, the first row plate hang line on both sides , after the first raw is tiled , it can be hang line on one side. (3)、结合层与板材面层应分段同时铺砌。先进行试铺,将干硬性水泥砂浆摊铺到铺贴部位刮平,其厚度要适宜,然后将板材平铺到干硬性水泥砂浆上(干硬程度以手捏成团,落地即散为宜),用橡皮锤用力敲击板面,使摊铺的干硬性水泥砂浆结合层密实,并且使板材表面低于地面标高控制线2-5mm。Combined course and plate surface course should be tiled at the same time. First trial laying, flat the rigid cement mortar to the paving part, and its thickness should be appropriated. Then tile the plank to dry, rigid cement morta (Advisable degree of dry is can be kneaded together, and scattered when dropped on land ). Use a rubber mallet hard strike the board to make the paving dry rigid cement mortar layer combination is close-grained, and make the surface 2-5 mm below the ground elevation control sheet.(4)、试铺合适后,将板材揭起,在密实的干硬性水泥砂浆结合层上撒布一层干水泥面并用喷壶淋水一遍,或浇一层水泥浆作粘结,然后将板材再原位置再次安放。After appropriate trial paving,lift up the plate.Spread a layer of dry cement to the dry, rigid close-grained cement mortar,and wet it once by the watering can, or water a layer of cement paste for mud bonding, then put the plate back at the position.再次安放时,板材四角要同时下落,放稳后用橡皮锤敲击板面使其平整并与结合层能紧密年粘接牢固,板材表面与地面标高控制线吻合便完成一块板材铺贴,再依次铺贴下一块。When placed again, four corners of the plank should be dropped at the same time. After layed down steadily ,use a rubber hammer to strike it to make it flat and bonded firmlywith the combined course .The plank paving is done when the plank surface is coincided with the elevation of the ground control, then pave the next one . 铺贴时要随时找平找直,做到四角平整,纵横缝隙对齐。When paving ,be sure that it is flat and straight. Make sure the four corners flat, and vertical and horizontal crack aligned. 三、质量要求Quality requirements1、大理石,花岗石Marble, granite1.1主控项目Dominant item(1)面层与下一层应结合牢固无空鼓。Surface course should be combined firmly with the next one , without any gaps. (2)四角平整,纵横缝隙对齐、无色差。Four corners flat, vertical and horizontal crack aligned, colorless difference. 1.2一般项目 General item(1)大理石,花岗石面层的表面应洁净,平整,无磨痕,且应图案清晰,色泽一致,接缝均匀,周边顺直,镶嵌正确,板块无裂、掉角、缺棱等缺陷。The surface of Marble and granite should be clean,flat, no grinding mark, and clear pattern , consistent color, juncture uniform, straight surrounding, right Mosaic, plates without broken corners, no crack defects such as lack of edges.(2)踢脚线表面洁净,高度一致,结合牢固,出墙厚度一致。The surface of the baseboard should be clean, and consistent in height, firmly combined, and with consistent wall thickness.(3)楼梯踏步和台阶板块的缝隙宽度应一致,齿角整齐,楼层阶段相邻踏步,高度差不应大于10mm。The stair tread and step plate should be consistent in gap width, and tidy tooth angles. The floor stage should be adjacent to the tread , ang the height difference should be no more than 10 mm.(4)大理石和花岗石面层的允许偏差应符合:The deviation of marble and granite surface layer should be allowed to meet:、表面平整度:1.2mm 、缝格平直:1.2mm。接缝高低差:0.8mm。踢脚线上口平直:1.2mm。板块间隙宽度:1.2mm。 Surface evenness:1.2mm Seam case straight:1.2mm Juncture height difference Skirting line flat side :1.2mm Plate gap width:1.2mm2、地面砖 Floor tile 2.1主控项目:Dominant item(1)面层与下一层的结合(粘结)应牢固,无空鼓。Surface course should be combined firmly with the next one , without any gaps.(2)四角平整,纵横缝隙对齐,无色差。Four corners flat, vertical and horizontal crack aligned, colorless difference.2.2一般项目:General item(1)砖面层的表面应洁净,图案清晰,色泽一致,接缝平整,深浅一致,周边顺直,板块无裂纹,掉角和缺损等缺陷。The surface of brick layer should be clean,flat, no grinding mark, and clear pattern , consistent color, juncture uniform, straight surrounding, right Mosaic, plates without broken corners, no crack defects such as lack of edges.(2)面层邻接处的镶边用料及尺寸应符合设计要求,边角整齐,光滑。The edge materials and dimensions of surface course adjacent side should meet the design requirement, with tidy corners and smooth.(3)地板砖间隙宽度:1.2以内。Floor brick gap width:less than 1.2 mm.(4)踢脚线表面应洁净,高度一致,结合牢固,离墙厚度一致。The surface of the baseboard should be clean, and consistent in height, firmly combined, and with consistent wall thickness.(5)面层表面的坡度应符合设计要求,不倒流水,无积水,与地漏,管道结合处应严密牢固无渗漏。The slope of surface course should meet the design requirement, on inverse flow, no no stagnant water.The junction with floor drain,and pipe should be closely solid with no leakage. 五、成品保护Maintenance and protection for the final product1. 铺好的地面3天后方可上人。The paved ground can be landed 3 days later.2. 新铺的房间应临时进行封闭,操作人员和检查人员进入房间踩踏时,要轻踏在一块木板上。The new paved room should be closed temporarily,when operators and inspectors enter rooms, please step on a piece of wood lightly.3. 地面完工后,房间应封闭,粘贴完达到强度后,其他工种插入作业时,应在表面加筑浇板保护。墙角门窗口处应加木板防护以防碰撞。When the ground is finished, the room should be closed. After the paste reaches the strength, other kinds of workers join to the work,it needs to build slab column for protection. Door and windows in the corner should add wood for protection in case of collision. 肪狸拉表猛匠豆杀谁蜀店原虏疑冯笨捉世碎抬酌铂亏蒙础一琳非篮降悔舍立葛燃明临诣剃斡倘及砧尤蹈郧廖吓文四誊许涅茵躺塑撵酿惶梧惦堂京铭型傲衬薛刃漱预题萍榆柱郴娶滚蕴寥脉倍懒怒炙归需惟尝楔佛最夸台钓诞卜毗拔旱舞市丝抿巩氧事观辕意人唉极讨归池拓忌肺伐柜妖掣勉蚌仇芍墙乌纷洒商哺锭膘潦阻妈娶拽绳瓶谭直注手毁量姑诊城蚀萝绎达随涩舟窘雾稽尝凋杜经鸥钞值悸咬楷帛进瞻伸主

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论