全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
托福阅读练习材料:国际空战站 The crew of the International Space Station have been forced to reducepower after half the cooling system suddenly shut down over the weekend. Nasa officials insisted the three Americans and three Russians aboard werenot in danger. Urgent spacewalk repairs are being discussed for this week. Without thermal controls,temperatures on the ISSs Sun-facing side can soarto 121C (250F),plunging to minus 157C (-250F) on the dark side,Nasa says. “There might be a comfortable spot somewhere in the middle of thestation,but searching for it wouldnt be much fun,” a statement on its websiteadds. The station is now operating on a single string,the Associated Pressreports,and has no safeguard in case of further cooling system failures. Alarms sound Trouble arose on Saturday night when one of the two ammonia-fed coolingloops shut down,triggering alarms throughout the ISS. The two ammonia lines ensure that all the stations electronic equipmentdoes not overheat. Astronaut Tracy Caldwell Dyson set in motion equipment shutdown proceduresand,with crewmate Douglas Wheelock,installed a jumper cable to keep all therooms cool. The Global Positioning System circuit,several power converters and a set ofdevices that route commands to various pieces of equipment were switchedoff. Two of the four gyroscopes - part of the space stations pointing andnavigating system - were initially shut down but the crew installed a jumpercable to bring up a third gyroscope,leaving the station in a much more stableposition,AP says. Flight controllers tried to restart the disabled ammonia pump early onSunday but the circuit breaker tripped again. Any repairs later this week almost certainly will involve replacing thefaulty ammonia pump,a difficult job that would require two spacewalks,APadds. “Its pretty clear that were going to want to have a course of action totake as quickly as possible,” Nasa spokesman Rob Navias said at the JohnsonSpace Center in Houston,Texas. “This is not something we want to linger over.” Two spare pumps are stored on the outside of the station. Two of theAmericans on board are already scheduled to conduct
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 房屋权属划拨协议书
- 房屋灾害治理协议书
- 房屋租赁赔偿协议书
- 房屋维修买房协议书
- 房屋补漏维修协议书
- 房屋装修维权协议书
- 房屋车辆成交协议书
- 房屋鉴定赔偿协议书
- 房山安置补偿协议书
- 房租减免转移协议书
- 儿童死亡监测培训课件
- 更换变压器施工方案及安全措施
- 驾照d证考试理论试题及答案
- 护理艾灸烫伤项目改善计划
- 2025年新高考数学命题趋势及二轮复习备考策略(深度课件)
- 针灸治疗脑梗死
- 数据安全常识培训
- T-HAS 141-2024 合成超硬材料用叶蜡石
- 农业碳汇开发咨询服务合同范本(CCER项目)
- 中山大学《信号与系统1》2023-2024学年第一学期期末试卷
- 安徽省合肥市科大附中高新中学2024~2025学年九年级上学期化学期末模拟试卷(含答案)
评论
0/150
提交评论