文档简介
Albert Einstein once defined insanity as doing the same thing over and over again and expecting different results. Well, thats what critics accuse the U.S. Department of Energy of: making the same mistakes over and over in a project that has already squandered billions of dollars in taxpayers money. But the risk here is far greater than financial, since it involves highly toxic nuclear waste. At stake are millions of gallons of radioactive liquid waste left over from the making of nuclear bombs, including the one that was dropped on Nagasaki. This waste has been sitting in underground tanks in Hanford, Wash., ever since, while the government tries to figure out how to clean it up. As correspondent Lesley Stahl reports, the waste is so lethal that a small cup of it would kill everyone in a crowded restaurant, in minutes. 60 Minutes recently visited Hanford, where the witches brew is being stored. Hanford, located along the Columbia River, is home to the most contaminated piece of real estate in the world outside of Russia. It is contaminated by waste left over from the production of nuclear weapons. There are 53 million gallons of highly radioactive liquid waste stored in underground tanks that are now so old they have leaked one million gallons of the stuff.Some of it leaked into the groundwater, and its heading right for the river. With a million people downstream, theres a sense of urgency about cleaning up the site, which is huge. It takes up 586 square miles in southeastern Washington. But for the Energy Department, which runs the project, its been a case of easier said than done. In the nearly 16 years 60 Minutes has been covering this story, its been one foul up after the next. Charles Anderson, the Energy Departments official overseeing nuclear clean up, gave Stahl a tour of what has been built so far at Hanford, starting with a replica of the underground tanks. This is a model of tanks that are already built that have waste in them. Be careful with your head here as we go in, Anderson told Stahl during the tour.The tank can hold 750,000 gallons of waste. Many of the tanks, built for the Manhattan Project to develop the first nuclear weapons, are more than 60 years old. Anderson explains there are a total of 177 tanks holding high-level waste at this site. The plan is to pump the waste out of the tanks and route it through miles of pipes to a yet-to-be-completed pre-treatment facility. The idea is to convert the radioactive waste into glass logs. This is where the radioactive waste will come from the tank farms, will come from those tanks and will come in here and be treated in different chemical processes and be turned into glass logs for final disposition to be disposed of in a landfill, Anderson explains.Stahl last visited the area in 2001, when the site was just a field. Anderson says significant progress has been made. The plants 35 percent complete in regard to construction, he says.But the place is a total ghost town. What happened?What happened here is that after three years of welding, pouring cement and laying miles of pipes and tons of steel, construction came to a screeching halt in 2005 because the Energy Department underestimated by 40 percent how strong the building must be to withstand an earthquake. Were talking about a building that would be full of radioactive liquid. In a building like this, you need to build it to ensure that it withstands whatever an earthquake may pose - if there is one - because we absolutely do not want a breech of this radioactive material in the atmosphere, says Gene Aloise of the Government Accountability Office (GAO), Congress investigative arm.But heres what 60 Minutes has learned: that the Energy Department and the contractor, Bechtel, went ahead with the plant knowing their seismic standard might be off. Just as construction was about to begin in July 2002, an independent safety board sent a letter, warning the department. Energy debated with the safety board for almost two years over the standards, says Aloise.Ok, let me understand this. This is brought up as an issue in 2002. Instead of going back right then, they debate until 2005, during which time theyre building the building? Stahl asked Aloise.Theyre building the building, he replied.They were building it using the wrong seismic standard. Because they did factor in some margin of safety, the contractor, Bechtel, has told the Energy Department there is no restructuring required on the foundation or the walls. But Aloise says what they do have to fix are the internal components of the building. Hangers, piping, vessel supports, all of this interior of the building, where the technologys going to rest. That all has to be re-engineered, he explains. They have to re-do tens of thousands of designs.The seismic miscalculation is costing at least $800 million and a two- to four-year delay in completing the building. This practice of pushing ahead with construction before the engineering is complete is known as fast track.The people in the state of Washington who are living with this thing, they dont want it to slow down, they want it to speed up, Stahl remarked.But it doesnt work in our view on complex, technical nuclear facilities like the ones in Hanford, Aloise replied.Asked what he would tell the people of Washington, Aloise said, That we need to do it right.Fast track was singled out as a major problem five years ago when 60 Minutes last reported on the cleanup. Gary Jones, a GAO investigator in 2001, told 60 Minutes that they had rushed ahead with construction of this building at a similar site in Idaho before the designs were finished. We asked about it back then. Youre saying they went ahead and built the building and then when they were finished making all the changes, the equipment wouldnt fit in the building? Stahl asked Jones in the report five years ago.The equipment for this particular process would not fit into the building as designed, Jones replied.Five years ago, 60 Minutes was assured the government had learned from its mistakes and things were finally under control. And yet, since then, costs have gone through the roof, up more than 150 percent, and the start date for making those glass logs has slipped seven years, to 2018. The seismic error was only one of several snafus. Tom Carpenter of the watchdog group called Government Accountability Project got hold of internal Energy Department and Bechtel documents which reveal a series of problems with a special tank for processing or scrubbing the nuclear waste. The problems began when Bechtel hired an outside vendor to build it. They gave the wrong design specs to the manufacturer, says Carpenter. They gave them a less strict nuclear design.According to the documents, when the tank arrived at Hanford it had cracked stay welds. They were fixed. But then different types of weld defects were discovered. And yet Bechtel went ahead and installed the scrubber tank anyway.They still said, We can fix those when the tanks installed. So they went ahead and installed it with defects, all right? Carpenter says. Knowing it, okay. So at this point they, Bechtel, demanded and then received a $15 million bonus for meeting a milestone.Bechtel wouldnt give 60 Minutes an on-camera interview, but did say that the $15 million wasnt a bonus, it was a fee. In any event, after they got the money, a new deficiency was discovered by independent inspectors for Washington state.This new deficiency, says Carpenter, was discovered after the tank was installed.Carpenter says, The red flag goes up and a full inspection is then ordered on the tank. Well, the full inspection shouldve been done at the factory where they built the tank.Asked whether this inspection was part of the contract, Carpenter says, Sure.The full inspection finally led Bechtel to realize the tank was not up to specification. But Carpenter says thats not all. The design flaws缺点 that led to this tank being deficient applied to 66 other vessels, Carpenter explains. Seven of which had already been built. And they had to go and redesign the ones that had not been built, and fix the ones that had been built. It really raises a big question about, well, what have they not caught out there? What other equipment or tools, or machine, is installed maybe under feet of concrete that these programs failed to catch? Because their programs failed. The contractor failed. The Department of Energy failed. It took an independent inspector to find new deficiencies. Where is the adult supervision here? Were talking a nuclear facility handling some of the worst waste in the world, and theyre fast tracking it? Excuse me.60 Minutes asked Charles Anderson of the Department of Energy about this. When you hear they gave the wrong design specifications you almost cant believe it on one piece of equipment, and then when you hear its been repeated over and over, I mean, that doesnt sound like the Department of Energy is managing the situation very well, Stahl said.Theres a number of those issues that have occurred. Those issues have been identified and corrected but theres also a large, large percentage of equipment where the specs have been correctly given, the equipments been purchased correctly, Anderson replied.But there shouldnt be mistakes like that in a plant like this, should there? Stahl asked.Well, Lesley, in a large complex facility, a project like this, you do have mistakes, he replied.Anderson acknowledged they are big mistakes. I would agree that there are big mistakes here that we are taking control of and were correcting, he says.You know, Im getting a little deja vu here because when we were here in 2001 it was the same thing. We figured it out. Its better now. No problem any more. Do you think, being candid with us, that the departments up to this? Stahl asked.Well heres whats different now. Weve taken steps to provide increased oversight, to reach out for increased external reviews, Anderson replied. To complete this important work of disposing of, stabilizing and then disposing of this waste.Anderson says that the leaking tanks have been stabilized and that theres virtually no chance of further seepage. But Christine Gregoire, the governor of Washington State, who has worked on this issue from the beginning, doesnt believe that
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年劳务员之劳务员专业管理实务练习题(二)及答案
- 大脑隐球菌病的护理
- 2025年河北石家庄晋州市中医院公开招聘工作人员21名模拟试卷带答案解析
- 2025浙江绍兴市凯泰特种纤维科技有限公司招聘4人备考公基题库附答案解析
- 中国消防新媒体招聘1人历年真题汇编带答案解析
- 2026年县直事业单位招聘公共基础知识真题200道及答案(全优)
- 2026年版全国社会工作者初级职业水平《社会工作实务》考试题库附答案解析
- 2025年甘肃省张掖市高台县教育系统引进高层次人才25人模拟试卷附答案解析
- 2026年消防条令纲要知识考试题库及完整答案【夺冠系列】
- 2025贵州安顺阳光未来学校教师招聘笔试模拟试卷附答案解析
- 浙教版七年级上册英语单词表
- 设备安装专项施工方案
- 幕墙作业安全技术交底
- 雾化吸入知识宣教主题班会课件
- 管理评审报告-2020年ISO27001-信息安全管理体系
- DL∕T 1564-2016 垂线装置 标准
- 3.1机械运动培优练习浙教版科学七年级下册
- 综合性学习《走进小说天地》及教案(部编)课件
- 新能源电动车安全培训课件
- 2021高性能混凝土应用技术标准
- 保安公司战略合作协议
评论
0/150
提交评论