1、11/1/2020 4:39 AM,P2 - 1,Session Outline,What is a WBS and where is it useful? What is successive decomposition? How is the WBS used on a program? How can I tell if I have a good WBS? Numbering notation. Examples. Common errors.,Outline,11/1/2020 4:39 AM,P2 - 2,Where is WBS Useful?,Rocket Science? B
2、rain Surgery? CVISN?,11/1/2020 4:39 AM,P2 - 3,The Work Breakdown Structure Is.,“Product-oriented hierarchy of goods and services.” Form: inverted tree; or indented list. Visualizing the entire project. Common framework for planning and control. Vehicle to divide work into tasks that are: Manageable
3、Independent Measurable Integratable Graphically displays entire project. Clear definition of all effort. “Top Assembly Drawing” of the project. “Product Breakdown Structure” or “Project Breakdown Structure” more apt name! Or perhaps “Work Buildup Structure”.,WBS Definition,11/1/2020 4:39 AM,P2 - 4,C
4、reate a WBS via RecursiveProduct-Oriented Decomposition,(Call This Level 1),WBS Construction,2000-01-26,11/1/2020 4:39 AM,P2 - 5,Example: Break Down 100% (1 of 2),100%,2000-01-26,11/1/2020 4:39 AM,P2 - 6,Example: Break Down 100% (2 of 2),100%,2000-01-26,11/1/2020 4:39 AM,P2 - 7,By decomposing, event
5、ually.,.you get to activities that can be assigned and scheduled.,WBS Construction,11/1/2020 4:39 AM,P2 - 8,Example Extended WBS for a Complex Program,Note the different orientations from top to bottom.,WBS unfolds and evolves as scope and design become known.,WBS Definition,11/1/2020 4:39 AM,P2 - 9
6、,WBS for Brain Surgery (tree format),Illustrative,Sources: 1. Bailey units are stand-alone testable. Eliminating one product element will delete the associated costs. Segregate recurring from non-recurring costs. Identifies and defines all effort to be expended: correlation of lower levels to specif
7、ication tree, contract line items, data items, and work statement tasks. Useful! Reflects the way the work is managed and performed. Sufficiently low level to establish adequate visibility and confidence for cost estimating, project planning, and project control. Technical/cost/schedule can be integ
8、rated at every level for each element.,WBS Definition,11/1/2020 4:39 AM,P2 - 13,WBS Levels & Numbering Notation,Satellite Mission Project 1. Project Management 2. Science Instruments 2.1 Magnetometer 2.2 Spectrograph 3. Spacecraft Bus 3.1 Propulsion Subsystem 3.2 Attitude Control Subsystem 3.3 Comma
9、nd & Data Handling Subsystem 3.3.1 C&DH Hardware Processor Card Memory Card 3.3.2 C&DH Software 3.3.3 Subsystem Integration 4. Ground Support Equipment,WBS Definition,11/1/2020 4:39 AM,P2 - 14,Exercise,Scenario Exercise,Imagine you are working at the Atlantic Pacific Sea Vision Fount
10、ain Pen Manufacturing Company,Motto: “Yesterdays Technology Solving Todays Problems Tomorrow”,11/1/2020 4:39 AM,P2 - 15,Key Concept: The WBS is a product-oriented, hierarchical list of the work to be done. The program plan is linked to the system design through the upper levels of the WBS.,Work Brea
11、kdown Structure,WBS Concept,11/1/2020 4:39 AM,P2 - 16,Where Does the Work Get Done?!,Satellite Mission Project 1. Project Management 2. Science Instruments 3. Spacecraft Bus 3.1 Propulsion Subsystem 3.2 Attitude Control Subsystem 3.3 Command & Data Handling Subsystem 3.3.1 C&DH Hardware Proc
12、essor Card .1 Engineering Design .2 Layout & Package Design .3 Fabrication .4 Assembly & Test 3.3.2 C&DH Software Command Parsing Module .1 Architectural Design .2 Detailed Design .3 Coding .4 Unit Test 3.3.3 Subsystem Integration 3.3.3
13、.1 Integration Plan Integrate Instruments with Bus 4. Ground Support Equipment,WBS Definition,11/1/2020 4:39 AM,P2 - 17,Typical WBS for a State CVISN Program,WBS Sample,2001-06-14,Level 1,Level 2,Level 3,11/1/2020 4:39 AM,P2 - 18,Elements Not to Include in WBS,Do not use the structure of the
14、 contractors organization as the basis of a WBS. At the top levels do not begin by decomposing into the functions or cost categories associated with developing those products.,Adapted from Department of Defense Handbook Work Breakdown Structure, MIL-HDBK-881. Available at: /pm/n
15、ewpolicy/wbs/wbs.html. Includes examples from the defense industry.,Do not use generic names - use actual system names and nomenclature. No disembodied software - software developed to reside on specific equipment must be identified as a subset of that equipment.,WBS Definition,11/1/2020 4:39 AM,P2
16、- 19,Common Errors When Creating WBS,Does not include all of the work. Example: The project calls for a prototype and a final version, but the WBS shows only one of these. Or it shows the prototype in detail, and then simply lists the other without showing the work needed to produce it. The level of
17、 detail is not sufficient to manage the program. Example: The big pieces may be there, but they are not broken down sufficiently to enable the work to be assigned, tracked, and managed. (The test would be: Can you use this WBS to make a good, detailed CPM network?) Important but not readily apparent steps are
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年品牌总监年底工作总结及2026年工作计划
- 体育运动教练岗位招聘面试题与参考回答(某大型国企)2025年
- 华联超市的采购管理
- 2025年工业知识图谱服务合同
- 真实医疗法律案例
- 恩施导游考试题库及答案
- 导游实务试题及答案
- 陕师大教育技术学论文:Blended Learning初步研究
- 2025年医务人员年终工作心得总结范文(四篇)
- 2025年《药品注册管理办法》考试试题及答案
- 2025年共青团入团考试题库及完整答案
- 网御安全系统power v功能使用手册
- 氢能系列报告认识氢能
- GB/T 120.2-2000内螺纹圆柱销淬硬钢和马氏体不锈钢
- 支气管哮喘诊疗指南
- 社区心理学课件
- 2022年石家庄市工会系统招聘考试笔试试题及答案解析
- 彤程化学装置水联运方案(草稿)
- 注塑模具验收标准
- 2009-2022历年上海市公务员考试《专业科目-政法》真题含答案2022-2023上岸必备汇编4
- 布袋除尘器技术协议
评论
0/150
提交评论