1、Supplier Quality Statement of Requirements 供应商质量声明October 2002Page PAGE 6 of NUMPAGES 6GM1927-3Supplier Quality Base Requirements: 供应商质量基本要求:(From General Terms and Conditions) Seller agrees to participate in Buyers supplier quality and development program(s) and to comply with all quality requireme
2、nts and procedures specified by Buyer, as revised from time to time, including those applicable to Seller as set forth in Quality System Requirements QS-9000. In addition, Buyer shall have the right to enter Sellers facility at reasonable times to inspect the facility, goods, materials and any prope
3、rty of Buyer covered by this contract. Buyers inspection of the goods, whether during manufacture, prior to delivery or within a reasonable time after delivery, shall not constitute acceptance of any work-in-process or finished goods.(一般条款和条件)供应商应同意买方制定的供应商质量和开发程序并遵守买方列出的所有质量要求和程序(有时会修订), 以及QS9000质量
4、体系提出的对供应商适用的要求. 除此之外,买方有权随时进入供应商的设施来检查设备,产品,材料和合同规定的SGM所有物. 无论在制造期间,发运之前还是在发运后的某段时间,买方对产品的检查,不能够免除供应商对在制品或成品检查的责任。All suppliers are expected to supply parts to SGM with zero defects. Parts shall meet all engineering specifications and function with no abnormalities according to intent. 所有供应商应该向上海通用汽
5、车提供零缺陷的零件. 。零件应满足所有工程规范和功能要求以达到零缺陷的目标。 Funding is to be identified in the initial quote and subsequent quotes to reflect error occurrence detection (poka yoke, error proofing devices, etc) and defect outflow prevention to customers. Controls implemented at a later date are the financial responsibili
6、ty of the supplier.在首次报价和其后的报价中,供应商需要说明为检测缺陷(防错装置等) 和 防止缺陷流向顾客所需要的预算。供应商以后追加的控制手段,费用由供应商承担。ISO/TS 16949 or QS-9000 - Quality System Requirements: ISO/TS 16949 或QS-9000质量体系要求:All suppliers to SGM must be certified to ISO/TS 16949 or QS-9000 and have a current certificate available demonstrating compl
7、iance to GM supplements. All suppliers should migrate to ISO/TS 16949 at the expiration of their current QS9000 certificate but before December 4, 2006. SGM的所有供应商必须通过ISO/TS 16949 或QS-9000标准的认证, 并且取得相应证书。在现行的QS9000证书 2006年12月到期之前,所有供应商应该通过ISO/TS16949认证。Suppliers not certified to ISO/TS 16949 or QS-90
8、00, or those suppliers constructing or purchasing facilities to manufacture the parts being quoted, must include an outline of their certification attainment plan with their quote for further consideration.供应商如果没有通过ISO/TS 16949 或 QS-9000认证,或者这些供应商新建或采购设备来制造报价的零件,供应商在报价时必须包括通过认证的计划。SGM Procedures and
9、 Reference Documents: 上海通用汽车的程序和参考文件:Suppliers are to adhere to the requirements contained in the following documents: 供应商必须遵守以下文件:PROCEDURE 程序Advanced Product Quality Planning & Control Plan Reference Manual (AIAG) 质量先期策划和控制计划参考手册(AIAG) Potential Failure Mode and Effects Analysis (FMEA) Reference M
10、anual (AIAG) 潜在失效模式和影响分析(FMEA)参考手册(AIAG)Fundamental Statistical Process Control (SPC) Reference Manual (AIAG) 统计过程控制参考手册(SPC)Measurement Systems Analysis (MSA) Reference Manual (AIAG)测量系统分析(MSA)参考手册(AIAG)Production Part Approval Process (PPAP) Manual (AIAG)生产件批准手册(AIAG)Key Characteristics Designatio
11、n System (KCDS) GM-1805QN关键特性指示系统(KCDS) GM-1805QNGP-5 Supplier Quality Processes and Measurements Procedure. GM-1746 GP-5 供应商质量过程和测量程序 GM-1746GP-8 Continuous Improvement Procedure. GM-1747 GP-8 持续改进程序 GM-1747GP-9 Run Rate. GM-1960 GP-9 按节拍生产 GM-1960GP-10 Evaluation and Accreditation of Supplier Test
12、 Facilities. GM-1796 GP-10 供应商检测设备的评价和鉴定 GM-1796GP-11 General Procedure for Pre-Prototype and Prototype Material. GM-1820 GP-11 Pre-Prototype和Prototype物料综合程序 GM-1820GP-12 Early Production Containment. GM-1920 GP-12 早期生产遏制GM-1920Traceability Identifier Requirement 追溯性标识的要求 (根据SGM追溯性要求)Supplier Qualit
13、y Weld Support Manual 供应商焊接质量支持手册Fixture Standards Requirement GM-1925 检具要求标准GM-1925GM Global Advanced Product Quality Planning (APQP) Manual GM-1927 GM全球质量先期策划手册GM-1927GP-4 Pre-Production /Pilot Material Shipping Procedure. GM-1407GP-4 预试生产/试生产物料发运程序 GM-1407Quality Planning Requirements: 质量策划要求:APQ
14、P: Suppliers must use an advanced product quality planning process that follows the GM APQP Project Plan (GM1927-1) that ensures production readiness with parts that meet 100% of the products specifications. APQP:供应商必须按照产品质量先期策划和GM APQP项目计划(GM1927-1)来执行,确保生产准备就绪和零件100%满足产品规范。Operator Training: Train
15、ing plan must address new operators and current operators performing new functions. Training status should be displayed in the area of the manufacturing process.员工培训:培训计划必须强调对新进员工和转岗员工的培训,培训状态应该在制造区域展示出来。Error Proofing: Suppliers shall implement error proofing strategies for the control of materials
16、, processes and labeling for all products provided to SGM. Supplier shall implement error proofing techniques to ensure that mistakes are detected and corrected before becoming a defect (i.e. make it impossible to produce defective items even if an error occurs). Implementation of error proofing is
17、to be measured by “% Error Proofed.” % Error Proofed is the percent of total steps in the manufacturing process which have been adequately error proofed. The supplier must error proof to a level where it is not possible to ship defective products to SGM.防错:供应商应该执行防错策略以确保所有提供给SGM产品的材料,过程和标签处于受控状态。 供应
18、商应该运用防错技术以确保产生缺陷之前及时发现缺陷并采取纠正措施(即使有错误发生也不应产生缺陷零件)。防错的执行情况通过“防错”来测算。防错是制造过程中的所有步骤采用防错的百分比。供应商的防错必须达到一定的水平,以防止缺陷零件发送到SGM。Traceability: A Traceability scheme shall be developed in accordance with regional and divisional requirements. Traceability scheme may include manufacturing date code and lot contr
19、ol. Items to be traced shall be determined in during the APQP process. 可追溯性:可追溯性计划应该根据不同地区的要求来开发.可追溯性计划可以包括制造日期编码和批号控制。可追溯性项目应该在APQP过程中确定。Verification of Customer Used Features: Customer-used part features (examples: fit, form, function, mating surfaces, etc. ) shall be incorporated in the PFMEA, pr
20、ocess control plan, layered audits, and error/mistake proofing. Additional items to be checked shall be defined during the APQP process. These features should be verified at a frequency of 100%.顾客使用特性的验证:顾客使用特性:(例如:配合, 形状,功能,匹配面等)应该包括在PFMEA,过程控制计划,分层审核和防错中。附加项目的检查应该在APQP过程中详细说明。 这些特性应该100%加以验证。Inspe
21、ction Fixtures and Gages Requirements: 检具要求:Supplier to assume the gage construction orientates the part in vehicle position unless Supplier Quality approves a deviation.除非SQE批准此项偏差,供应商应根据零件的装车位置来制造检具。All customer monitored APQP parts shall have gage designs approved by the Supplier Quality Engineer
22、 or the appropriate customer gage approval group prior to the start of fixture construction (for your regional requirements, contact your supplier quality engineer). Gage designs shall incorporate approved GD&T datum schemes and gages/fixtures must be capable to dimensionally evaluate parts.所有顾客监控的A
23、PQP 零件,应该由SQE或合适的顾客检具认可小组 在检具制造开始之前(与SQE联系所在地区要求)对检具设计进行认可。检具设计应该包括认可的GD&T基准方案以及检具必须具备评价零件尺寸的能力。Supplier shall have hand apply fixtures for sub-datum KPCs and openings where assembly plant or sequencer/subassembler will install something that impacts a final vehicle specification (e.g. trim plates,
24、extension panel, grilles, glove box door, etc.). 在零件的次基准KPC和接口处,主机厂/排序/分供方需要安装影响车辆终检的零件,供应商应配备检测次基准KPC项目和接口的手动检具(例如:内饰板,延伸板, 格栅,手套箱门等)。Supplier shall have the ability to check a completed assembly. Sub-contractors shall also have the ability to check component parts. Any cubing or build fixture shal
25、l have the ability to demonstrate fit to adjoining parts and attachments.供应商应该具备检测整个总成的能力。分供方应该具备检测分零件的能力。任何检具应该具备检测与其他零件是否相匹配的功能。Appropriate functional testing and final inspection to ensure product performs as designed under actual vehicle conditions.适当的功能检测和最终检测以确保产品符合车辆实际状态下的设计。Supplier shall en
26、sure that fixtures are procured in a timely manner to meet major program benchmarks (i.e. first shots, GP-11 events, Functional evaluations, and PPAP.) Supplier shall, at a minimum, have a CMM (coordinate measurement machine) holding fixture available for the inspection of first parts off prototype
27、and production tooling.供应商应该确保及时完成检具来满足主要项目的节点要求(例如:投入使用,GP-11,功能评估和PPAP)。 供应商应该至少使用CMM(三坐标测量机)和零件专用夹具,用其检测样件工装和生产工装制造的首件。Quality Control Requirements: 质量控制要求:Layered Audits: A documented layered audit plan shall exist with a minimum frequency of once per shift. Non-conformities shall be addressed i
28、mmediately and corrective action shall be documented. Audit plan shall include multiple levels of management. Site leadership shall verify compliance to the documented plan.分层审核:分层审核计划的频次应该至少每班 一次。应该立即记录不符合项并且将纠正措施文件化。审核计划应该覆盖管理的各个层次。领导层应该验证计划的完成情况。Containment: All non-conforming and suspect materia
29、l must be controlled. Method must be clearly defined. Visual controls should be implemented. All non-conforming material must be segregated and identified. GP12 and shall be implemented during launch. Upon request of SGM additional levels of proactive containment may be required. Should a problem oc
30、cur, suppliers are required to implement effective and immediate spill containment and comply fully with GP-5 requirements and the controlled shipping that may result.遏制:所有不合格和可疑材料必须被控制。必须清楚地定义其方法。应该执行目视控制。所有不合格材料必须被隔离和标识。在生产期间GP12应该被执行。以上SGM 附加的遏制措施可能被要求执行。如果问题发生,应要求供应商立即采取有效的问题措施,并在发生GP5和控制发运时按要求执
31、行。Quality Performance Metrics: Each Suppliers Senior Management shall commit to maintain and continuously improve quality. Suppliers shall monitor their quality performance according to PPM, PRRs, Controlled Shipping Level I and II, Major Assembly Plant Disruptions, and QS-9000, ISO/TS16949 and ISO1
32、4001 Certifications. 质量表现:每一家供应商的高级管理层应该承诺保持质量的持续改进。供应商应根据PPM, PR/Rs,一级和二级控制发运,主机厂停线记录,QS9000, ISO/TS16949 和 ISO14001的认证等数据监控其质量表现。Production Quality: 生产质量:All suppliers are required to have effective manufacturing practices and procedures to ensure a continuous flow of defect free parts into SGM pr
33、oduction facilities. 应要求所有的供应商具备有效的制造流程以确保高质量的零件连续地运送到SGM生产线上。Current Product Improvement Process (CPIP): Suppliers shall actively participate in the timely resolution of problems identified by GMs CPIP. Suppliers shall provide appropriate corrective action documentation and project status updates a
34、s requested.产品改进过程(CPIP):供应商应该积极解决GM的CPIP识别的问题。供应商应该按要求提供适当的纠正措施并更新项目状态。Advance Problem Solving Requirements: 先期问题解决要求:Suppliers are required to demonstrate their capability to solve complex problems using advanced problem solving techniques such as the “Red X” system at GM.供应商应证明其具备运用先期问题解决技术(例如GM“
35、Red X”系统)来解决复杂问题的能力。Production Support Requirements: 生产支持要求:On-Site support during pre-production and launch: Upon request of SQ or SGM Plant, Supplier will provide on-site support during all pre-production build phases and production launch activities. 在试生产和生产阶段的现场支持:根据SQ或SGM工厂的要求,在整个试生产和生产阶段,供应商应该
36、提供现场支持。Supplier contacts for all shifts: Supplier shall designate a specific supplier representative that will support each of the SGM Plants shifts. At a minimum the supplier designate should have the responsibility to:供应商与SGM生产各班保持联系:供应商应该指派明确的代表来支持SGM工厂的每一班生产。供应商指派的代表应至少负责以下方面:Implement immediate
37、 countermeasure to contain discrepant parts and to confirm that defective parts are not shipped to SGM Plant.对缺陷零件立即采取措施以确保缺陷零件不会发送到SGM工厂。Approve SGM Plants/SQEs requests for rework and sort. 按照SGM 工厂/SQE 的要求返工和筛选。Coordinate and provide resources to rework and sort parts.协调提供返工和筛选零件所需的必要资源。Provide s
38、ub-assemblies / components for required repair, related to quality issues.提供分总成/零件相关质量问题所要求的返修。Provide clear information regarding any defective parts in-route to SGM Plant (how to identify defect, disposition guidelines).提供正在运往SGM工厂途中,有关缺陷零件的明确信息(如何识别缺陷,处置方针)。Coordinate special delivery of certifie
39、d OK parts.协调合格零件的特殊运输。Quality data: Supplier must provide quality-related data (e.g. historic inspection, first time quality, reject data) to GM upon request. This data may be required to determine trends and to root cause quality problems at the GM Manufacturing or Assembly Plant.质量数据:供应商必须提供相关的质量
40、数据(例如历史检验数据,一次合格率,废品率) 给GM所要求的部门。这些数据用于GM制造厂或总装厂以确定质量问题的趋势和根本原因。Tier 1 Responsibilities (including suppliers of complex systems/sub-assemblies): 一级供应商职责(包括复杂系统/分总成的供应商):The tier one supplier is responsible for implementing and adhering to AIAG and GM requirements (see section 3) for all components o
41、f the assembly including directed buy parts unless otherwise specified by the procuring division. GM may, at their discretion, assign an SQE to work with the tier ones SQE for the purposes of learning, inputting, and concurring on component related issues.除非采购部另有规定,供应商负责对所有的装配零件包括直接采购的零件坚持执行AIAG and
42、 GM-9000的要求(参见第三章节)。GM可以自行决定指派一名SQE与供应商的SQE共同研究,输入和商讨零件的相关问题。Powertrain Suppliers: 动力总成供应商: Powertrain suppliers must adhere to the Supplier Quality Statement of Requirements Powertrain Addendum 动力总成供应商必须执行“动力总成供应商质量声明附录”的要求Systems and Procedures Access: 获取体系和程序文件:Suppliers shall have internet acces
43、s to effectively communicate with General Motors. GM Supplier Quality procedures and systems can be accessed through the GM SupplyPower web page (). 供应商应该通过网络与GM进行有效的联系。可通过GM的SupplyPower 网址来获取GM 的供应商质量程序和体系文件( HYPERLINK ) )。All GM specific procedures and documents listed can also be obtained by cont
44、acting Boise Cascade Office Products at 1-888-216-0371, Fax 1-888-216-0603. 所有GM特殊的程序和文件可通过联系Boise Cascade办公室来获取,电话:1-888-216-0371,传真:1-888-216-0603。Automotive Industry Action Group (AIAG) documents can be obtained by contacting AIAG at 01-248-358-3003. Documents can also be ordered at . To obtain t
45、hese documents in Europe, contact Carwin Ltd. at 44-1708-861333. In Brazil, contact IQA at 5511-5533-4545 or .br. AIAG的文件可通过AIAG 的电话 01-248-358-3003来订购,也可以通过网络 HYPERLINK 来订购。如要获取欧洲地区的文件,请与Carwin 公司联系,电话:44-1708-861333. 如要获取巴西地区的文件,请与 IQA公司联系,电话: 5511-5533-4545 或网址 HYPERLINK .br .br。Supplier Quality Statement of RequirementsPowertrain Addendum供应商质量声明动力总成附录Performance Requirements: 能力要求:For Key Product Characteristics (KPCs)GM1805QN and Product Quality Characteristics (PQCs):关键产品特性(KPCs)-GM1805QM和产品质量特性(PQCs):Minimum SHORT TERM
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 智能化水利灌溉系统建设实施方案
- 超导技术应用场景拓展实施方案
- 自来水厂生产调度与优化管理方案
- 2026蓝色简约风学习成果汇报模板
- 城市垃圾分类与处理技术方案
- 施工团队激励与管理方案
- 市政给水管网工程设计与施工方案
- 2022长江职业学院药品生物技术专业大纲+样卷+参考答案
- 塑料包装箱及盖板生产项目投标书
- 功能性DTY纤维设备更新技术改造项目规划设计方案
- 冷库制冷系统安装施工方案
- GB/T 31771-2024家政服务母婴护理服务质量规范
- 个人生涯发展报告课件
- 贵州毕节人文介绍
- 移动式升降平台安全指导手册
- 记叙文阅读之记叙顺序(练习)-中考语文复习之现代文阅读(含答案)
- 《干部履历表》(1999版电子版)
- 大疆80分钟在线测评题
- 人教版2024-2025学年八年级数学上册举一反三专题13.8等腰三角形常用作辅助线方法【七大题型】(学生版+解析)
- 解读国有企业管理人员处分条例(2024)课件(全文)
- 幼儿园中班艺术活动课件:给朋友打电话
评论
0/150
提交评论