版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1,CHAPTER 6,2,Bond Stick On Ball(BSOB)/Bond Ball On Stitch(BBOS)/ Tail Break,3,1.0) BOND STICK ON BALL(BSOB),1.1) Description This bonding process is specially developed by ASM to handle multi-die(MCM) bonding application. In the conventional approach, if one is trying to connect the gold wire from
2、one die to the another, a capillary mark of second bond will be evident on top of the die which may damage the die. The BSOB process will solve this problem by bonding a ball onto the dies surface first, followed by bonding another wire where the second bonds wedge will be landing on top of this bon
3、ded ball(figure 1).,4,Die 1,Die 2,Bond Ball,2nd Bond(wedge),Figure 1 : Bond Stick On Ball(BSOB),5,2.0) BOND BALL ON STITCH(BBOS)/ SECURITY BOND,2.1) Description This process is also known as security bond. It bonds a ball on top of the wedge of the normal connection wire.This process is mainly used
4、to secure the second bond sticking capability.(Figure 2),Die 1,Lead,Bond Ball,2nd Bond(wedge),Figure 2 : Bond Ball On Stitch (BBOS),6,3.1) Free Air Ball (FAB 2)is aligned to the center of the bond pad on device 2.,FAB 2,3.0 STANDOFF BALL CONTROL BONDING SEQUENCE,7,3.2) Capillary descends and bonds b
5、all to bond pad.,Device 1,Device 2,W/clamp open,Capillary,Application of 1st bond stand off ball parameter to form Ball Thickness and Ball Size,During Stand Off Bonding , SOB parameters are applied .,8,3.3) Capillary rises to loop base to clear ball.,Device 1,Device 2,W/clamp open,Capillary rises to
6、 set Loop Base,Loop Base,Contact Pt.,Loop base is the distance between the capillary tip and contact point.,Recommended setting = 2,9,3.4) Capillary move to programme ball offset. Ball offset can be programmed towards or away from the first bond. + ve towards 2nd bond - ve away 2nd bond,Device 1,Dev
7、ice 2,Actual Ball Offset = Setting x 10umIf Ball Offset Setting = 22Then Actual Loop Base =220um,Recommended Setting = - ve 35,10,3.5) Capillary descends and forms stitch bond on top of the ball.,Device 1,Device 2,*Ball Thickness,SOB Parameter (Stand Off Ball Parameter),Capillary descends to set Bal
8、l Thickness (Amt. Z movement above the ball height),Contact Pt.,* Ball Thickness is the distance between the capillary tip and contact point Recommended setting = 2,11,3.6) Capillary moves horizontally for a scrub distance to weaken the wire at ball neck.,Device 1,Device 2,Scrub one direction away f
9、rom ball,Actual Scrub Distance = Setting x 0.8 umIf Scrub Distance Setting = 10Then Actual Scrub Distance = 8 um,Capillary move to set Scrub Distance One direction ONLY - Away from the ball,Recommended setting = 8,12,3.7) Capillary rises to tail height,Device 1,Device 2,W/clamp close,Capillary moves
10、 to set Tail Length (Amount Z movement above the bump before the wire clamp closes),Recommended setting = 35,13,3.8) Capillary rises and tears the wire, as BH ascend to Fire Level.,Device 1,Device 2,W/c close,14,15,3.10) After placing all standoff balls. The machine continue to bond wires.,2nd Bond(
11、wedge),Device1,Device2,Device1,16,Bump ball formation for BSOB/BBOS,MOTION,BO,LB,BT,SC,Normal LB BO BT Scrub,Flat LB BO BT Scrub=0,CONE LB BO BT=LB Scrub=0,LB,BO,BT,LB,BO,The bump ball formation process is almost like bonding a normal wire, including 1st bond, looping and 2nd bond parameters.,17,4.0
12、) PARAMETER DEFINITION IN STAND OFF BALL CONTROL MENU,4.1) Loop Base This parameter determines the loop level of the bondhead which should be sufficient to avoid the ball. Range: Loop Base 0 5 Setting : 2 4.2) Ball Offset This setting controls the distance of the table move in order to offset the ca
13、pillary from the standoff ball. Negative value can be moved towards to the first bond. Positive value can be moved away from the first bond. Range: Ball Offset - 40 20 Setting : - ve 35,18,4.4) Scrub Distance This setting controls the capillary moves horizontally with a Scrub amplitude to weaken the
14、 wire at neck. It is always away from the first bond. Range: Scrub Dist 4 12 Setting : 8 4.5) Tail Length This setting controls the length of the tail where the bondhead rises to the preset height before the wire clamp is closed. Range : Tail Length 30 40Setting : 35,4.3) Ball Thickness This paramet
15、er refer to the ball thickness which controls the level of the bondhead as it descends to the top of the ball Range: Ball Thickness 0 5Setting : 2,19,4.6) Time Base 1/2 This setting controls the bond time applied to the standoff ball control only. Time 1 for the 1st bond and Time 2 for the 2nd bond.
16、 4.7) Power Base 1/2 This setting controls the ultrasonic power applied to the standoff ball control only. Power 1 for the 1st bond and Time 2 for the 2nd bond. 4.8) Force Base 1/2 This setting controls the bonding force applied to the standoff ball control only. Force 1 for the 1st bond and Force 2
17、 for the 2nd bond.,20,4.9) Standby Power 1/2 This setting controls the power activated when the bonding head reach the search level, to the moment the bond head contacts the bond surface. With the vibration, before contact take place. Bond head will clean up the pad surface and remove water vapor on
18、 the pad. This parameter used for the standoff ball control only. 4.10) Contact Time 1/2 Refer to the Contact time 1/2 definition in Bond Parameter menu. But this parameter will be affected on the Standoff ball control only.,21,4.11) Contact Power 1/2 Refer to the Contact Power 1/2 definition in Bon
19、d Parameter menu. But this parameter will be affected on the Standoff ball control only. 4.12) Contact Force 1/2 Refer to the Contact Force 1/2 definition in Bond Parameter menu. But this parameter will be affected on the Standoff ball control only.,22,Figure 4 : Standoff Ball Control Parameter Disp
20、lay(page 2),5.0 BSOB WIRE PARAMETERS,23,5.1) Wire Offset In -Menu This is the offset parameter that is required to ensure maximum contact area between the stitch bond and ball. It is always away from the first bond. Range: Wire Offset 10 30 Recommended setting = 25,5.2) Second Bond Search Speed This
21、 Parameter controls the impact for stitch on ball. Range: Search Speed 2 32 256 Recommended setting = 32,2nd Bond Wedge,Stand Off Ball,Capillary position during stitch bond,24,5.3) Time Base 1/2 This setting controls the bond time applied to the device. Time 1 for the 1st bond and Time 2 for the 2nd bond. 5.4) Power Base 1/2 This setting controls the ultrasonic power applied to the device. Power 1 for the 1st bond and Time 2 for the 2nd bond. 5.5) Force Base 1/2 This setting controls the bonding force applied to the device. Force 1 for
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 内蒙古呼和浩特回民中学2024届高考压轴卷化学试卷含解析
- 【可行性报告】2023年非接触式温度计项目可行性研究分析报告
- 国际疾病分类
- 儿童坏死性脑病
- 有关高考的倡议书借鉴
- 医院绩效考核专家讲座
- 心力衰竭专业讲座
- 电芯分容试验机操作指导书
- 销售业务部职责
- 临床医学检验临床免疫技术:医学免疫考点
- 海南省建筑工程竣工验收报告-表八(共7页)
- 山庄经营合作协议(1)
- 立井井筒的结构与设计(共26页)
- 肿瘤科规培出科试题
- 第4章超声波局部放电检测技术
- 浅谈全氢罩式退火炉设备安装及调试技术
- 消防设施移交和清单-(精编版)
- 施工现场车辆交通安全PPT学习教案
- 世界500强企业简要情况及在华机构联系方式
- 道路指示牌施工合同
- 糖尿病视网膜病变.ppt
评论
0/150
提交评论