下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,
3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8
4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe
5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207
6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo
7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc
8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F
9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ
10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis
11、ion of production safety and the Olympic Games and other2011销售部业务流程 P9/10销售工作流程图接待客户流程图签认购书流程图签买卖合同流程交楼发信流程图现楼发信流程图现场交楼流程图办理产权流程图延迟签约流程图换房流程图主要介绍的是永磁直流电动机;首先简述了永磁电机、永磁直流电动机从产生到到逐步改善的发展过程,以及以此为基础的未来发展的趋势;activities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism,
12、give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemi
13、stry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transfo
14、rmation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen
15、 the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased inves
16、tment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technolog
17、ies project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of compr
18、ehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named China power information technology benchmarking enterprises. -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the suc
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 脑胶质瘤EGFR变异与靶向治疗研究2026
- 河北保定市2026年国家级检验检测机构资质认定评审员考试试题及答案
- 2026年浙江省工业设计职业资格考试(工业设计综合知识)复习题及答案
- 2026年科普知识题库及完整答案(各地真题)
- 2026年湖北省襄阳市农业专业技术职务水平能力测试(农学)全真冲刺试题及答案
- 2026年湖北省十堰市专业技术职务水平能力测试(农学)试题解析及核心考点
- 2026年湖北省恩施州农业专业技术职务水平能力测试(农学)综合练习题及答案
- 【备考2026】河南省中考模拟数学试卷3(含解析)
- 医院感染自查报告(3篇)
- 镇安县县域医疗次中心建设项目水土保持报告表
- 自己是健康的第一责任人
- 《课程与教学论》期末考试题
- 沪教版七下英语Unit7Rolemodelsofourtime第1课时Reading教学课件
- 2024北京八年级(下)期末数学汇编:一次函数(解答题)
- T/CCT 013-2023兰炭生产业二氧化碳排放核算技术规范
- 探究拔节期和孕穗期双期低温对小麦籽粒品质的影响
- 造谣调解协议书范本
- 《钢铁是怎样炼成的》课件读书分享
- 茶颜悦色品牌设计
- 2025年山东青岛东鼎产业发展集团有限公司招聘笔试参考题库附带答案详解
- 认证机构风险管理制度
评论
0/150
提交评论