修船价格蓝本_第1页
修船价格蓝本_第2页
修船价格蓝本_第3页
修船价格蓝本_第4页
修船价格蓝本_第5页
已阅读5页,还剩53页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、船舶修理价格表TARIFF FOR SHIP REPAIRS中国船舶工业总公司CHINA STATE SHIPBUILDING CORPORATIONGENERAL NOTES1. The rates quoted herein are in US dollar $.2. The rates are applicable to the work carried out during the normal workinghour, that is five working days a week, and sixteen hours a day. Any worksdone outside th

2、ese hours or on Saturdays and Sundays, National Holidays andyard's holidays shall be charged with extra for overtime, ship on voyagerepair will be priced extra.3. All prices quoted herein are for ship repairs carried out in the premises of the shipyard, extra price should be added for such repai

3、rs carried out at the port berths, buoys, anchorages according to the actual work to be done.4. Any vessel during the repair period of repair in the yard, unless agreed bythe yard, the Customer shall not be permitted to employ any labor other thanthe yard to perform repairs.5. The yard shall not be

4、responsible for the consequences of war, earthquake or causes beyond yard's control.6. All scrapped material except heavy parts of machinery, propeller and tailshafts shall be the yard's property.7. This tariff is applicable to the repair of freight carriers only, repairsof other types of sh

5、ip are beyond of this tariff scope.8. This tariff becomes effective from January 1st, 1991, subject to revised pricedepending on the change in material cost etc. without notice.CONTENTS1. General Servicespage1. Wharfage12. Mooring and unmooring13. Shore electric power supply14. Cooling water supply5

6、. Fresh water supply16. Water to ballast tank17. Fire precautions28. Garbage disposal29. Compressed air supply210. Steam supply211. Telephone service212. Ventilation fan213. Heating lamp for electric motor214. Gas free inspection215. Rental of crane216. Drain pipes317. Gangway for ship mooring318. S

7、hipyard pilotage32. Docking Works1. Docking charges42. Tugs charges43. Tailshaft54. Rudder65. Underwater works7(1) Sea chests7(2) Sea valves8(3) Zinc anodes8(4) Bottom plugs83. Hull Department1. Cleaning and painting9(2) Hull cleaning9(3) Painting9(4) Scraping and chipping10(5) Gritblasting10(6) Sta

8、ging102. Anchors and chain cables11(1) Anchor chain cable11(2) Chain blocker113. Steel work12(1) Renewal12(2) Handrail fence13(3) Hatch cover, watertight door, manhole cover134. Tank work(2) Chipping and mud removal14(3) Test145. Derrick union154. Machinery Works1. Diesel engine162. Turbo charger183

9、. Heating exchanger184. Aux. Boiler195. Pipe206. Valve215. Electric Works1. Motor22222. GeneratorGeneral Service1. WharfageLess than 5000 GRT125 per day5001 to 20,000 GRT0.025 per gross ton per dayOver 20,000 GRT 500 + (Gross ton - 20000) x 0.02 per day2. Mooring and unmooring (per time)Up to 5,000

10、GRT8001,5605,001 to 10,000 GRT1,12010,001 to 20,000 GRT20,001 to 30,000 GRT2,05030,001 to 40,000 GRT2,60040,001 to 50,000 GRT3,20050,001 to 60,000 GRT3,900Over 60,000 GRT4,700Note:(1) Above ratesat normal working hours on shipyard ' s premises for mooring and unmooring.(include Towage service)(2

11、) Above ratesincluding line handling.(3) In case ofovertime, extra 30% shall be charged.(4) If ownerschange the towing plan, unless there is timely notice to shipyard, extra 50% shall be charged for waiting.3. Shore electric powerConnection and disconnection of cable100 per time4.5.Current, per K.W.

12、H. (AC)Cooling water supply to food refrigeratorLine to connect and disconnect40 per time per line0.20Water supply40 per day per lineFresh water supply40 per time per lineLine to connect and disconnectFrom shore1.00 per ton(Prices are separately charged from barge)6.Water to ballast tank (sea and ri

13、ver water)0.40 per tonSupply of water7. Fire precautionsPut fire extinguishers10 per dayFire line to connect and disconnect40 per time per lineKeep pressure20 per day per lineFire watch, per man (24 hours)120 per day8. Galley garbage disposal30 per day9. Compressed air supplyLine connection and disc

14、onnection40 per time per lineTo supply40 per day (8 Hours)10.Steam supply200 per time per lineLine connection and disconnection11.serviceTelephoneTelephone wire connect and disconnect30 per time4 per set, per day(Toll calls to be extra)12.fanVentilation15 per set per day13.for electric motrorHeating

15、 lamp14.Installation5 per setMaintenance5 per set, per dayGas freeinspection15Other vessel40 per timeRental ofcraneShore craneLess than 30 ton90 per hour(2) Floating craneLess than 30 ton90 per hour50 ton150 per hourover 50 tonextraNote:(1)Any fractionof one hour shall be charged as one full hour.(2

16、)Floatingcrane price excludes tuggage price.At shipyardoutside service, price shall be charged extra.16.Connectionof sewage water drain pipes and grooves20 per pc17.gangway ladder on and off (per time)Ship mooringLess than 5000 gross ton250Less than 10000 gross ton350Less than 20000 gross ton500Over

17、 20000 gross tonextra18. Shipyard pilotage chargedUp to 20000 GRT800Up to 40000 GRT1000Up to 60000 GRT1200I. Docking works1.Dock chargesG.R.T.First two daysSubsequent per day5,0007,50010,00015,00020,00025,00030,00035,00040,00050,00060,000Over 60,00018502148269334654673600478049920114101343015760Extr

18、a3764585537961010129016762264288235464221ExtraNote:Floatingdocks extra 10% to be added.(2) Above ratesexcluded towage service and line handlers for docking and undocking.(3) Minimumcharge will be calculated on the basis of 48 hours. Any fraction of one subsequent day shall be counted as one full day

19、.(4) Any vesselhaving gross tonnage less than of 60%her deadweight, shall be charged with dockage calculated as if her gross tons were of 60% the deadweight.(5) When thevessel with cargo onboard is allowed to drydock weight of the cargo onboard shall be added to gross tonnage of the vessel.(6) Speci

20、alvessel shall be charged extra.Extra(8)charges shall be paid when: remove and replace keel blocks for access to repair USD75 per each, side blocks for access to repair USD50 per each.Lossincurred, if any, may be claimed for, compensation against abrupt cancellation after shipyard made all necessary

21、 preparation for the docking2.Tuggage (pertug boat/shifting)Note:Up to 5,000 GRT5,001 7,500 GRT7,5001 10,000 GRT10,001 15,000 GRT15,001 20,000 GRT20,001 25,000 GRT25,001 30,000 GRT30,001 35,000 GRT35,001 40,000 GRT40,001 50,000 GRT50,001 60,000 GRT6009001,2001,5001,8002,1002,4002,8003,2003,8004,200A

22、bove ratesat normal working time, all overtime and national holidays, extra 30%shall be charged.Towageservices as required for other work shall be charged by 0.15/HP.hour.Above tug boat price are all net price.3.Tailshaft(1) Conventional servicedraw of tailshaft, for examination, measure,and recordi

23、ng, rope guard to remove, propeller to disconnect and tailshaft to draw, including removal of one intermediate shaft, bearing and cooling water pipe, in shaft alley, stern gland to repack with owner supplied packing, upon completion to reinstall.Tailshaft diameterconventional typeoil lubricated type

24、(mm)up to 4002,6403,170401 4503,0803,700451 5003,4104,090501 5503,7404,490551 6004,4005,280601 6504,8405,800Note:Above priceincludes necessary staging.Thefollowing items shall be charged extra:Shaft alignment adjustment.Filling with tallow in propeller bonnet and bossRenewal of water seal rubber rin

25、gMagnaflux test on tailshaft coneRemoval and replacement of miscellaneous fittings in engineroom and shaft alley, such as handrails and cables, etc.Any repair and / or renewal.Tailshaft and / or propeller to workshop.Above pricediameter of tailshaft means diameter of the brass sleeves.Controllable p

26、itch propeller shaft to be considered separately.(5) Due totailshaft, intermediate shaft, main thrust shaft removal, necessary removal hull plate extra charge.(6) 40% of priceof the above will be charged in case of disconnecting only propeller.(2) Removerope guard and measure stern tube bearing wear

27、-down and renewal with owner supplied packing.Tailshaft diameter (mm)priceup to 400401 450451 500501 550551 600601 650(4) Cleaning the propeller220240280310340380Tailshaft diameter (mm) grinding basis 4 bladesup to 400401 450451 500501 550551 600601 650190220240260290320Note:(1) In case 5blades, 20%

28、 up; 6 blades, 30% up.(2) Above pricestaging shall be extra.4.Rudder(1) Check and record rudder pintle clearance in place(including staging and removal of inspection plate)Vessel gross tonnagemeasure clearanceUp to 5,0005,001 7,5007,5001 10,00010,001 15,00015,001 -20,00020,001 25,00025,001 30,00030,

29、001 35,00035,001 40,00040,001 50,00050,001 60,000over 60,000140150170180200210230250270350400extra(2) Renewal rudder gland packing supplied by owner (ordinary type)Vessel gross tonnagepacking renewalUp to 5,0005,001 7,5007,5001 10,00010,001 15,00015,001 20,00020,001 25,00025,001 30,00030,001 35,0003

30、5,001 40,00040,001 50,00050,001 60,000over 60,000180200210230240260290330360440500extra(3) Rudder lift up, to disconnect steering gear, lift up rudder for checking clearance and then close.Vessel gross tonnagepacking renewalUp to 5,0005,001 7,5007,5001 10,00010,001 15,00015,001 20,00020,001 25,00025

31、,001 30,00030,001 35,00035,001 40,00040,001 50,00050,001 60,000over 60,0001,1251,3501,5001,7251,8001,9502,1002,2002,3002,5002,900 extraNote:(1)Simplex rudder, hanging rudder and AEGtype to be charged with extra 20%(2)Ruder rod and rudder blade removal to be extra.(3)All spares to workshop repair cha

32、rged with extra.5.Underwaterwork(1) Sea chest:Removal strainer, clean, one coat paint and close on completion.areaper eachUp to 0.5 sqm70Over 0.5 sqm120Note:(1)Above price(2)excluding any repair, renewal and staging.Paint supplyby owners.(2) Sea valveOpen up sea valves for survey, grind in, clean an

33、d paint,(owner supply) renew packing, repack and close in place.Valve diameter (mm)Globe valveGate valve25334450395575506610061831257811415096144200120180250144216300168252350192288400216336450252384500276432600312492700360564Note:(1)Renewal ofvalve (with owner ' s valve), 80% of above tariff.Va

34、lve toworkshop for repair, 150% of above tariff.(3)Any renewaland repair will be charged separately.(3) Zinc and hull anodes(1) Renewal with owner s materialless than 10 kg13 per pc10 25 kg16 per pcover 25 kg20 per pc(2) Renewal with yards material per pc58 per pcsize 300 x 150 x 30mmstaging price t

35、o be charged extraNote:(1) Double tankand ballast tank zinc anode renewal (owner supply) add 30% above tariff.Stagingprice to be extra.(4) Bottom plugsRemoval and refitting (including cement-washing) per pc18(any repair and renewal and staging will be charged separately)111. Hull Department1 Cleanin

36、g and painting(1) Marks RepaintingGross tonnageDraft marksShip' s name and port of registryPlimsoll ' s marksUp to 5,00012084605,001 7,50013098707,5001 10,0001401198510,001 16014010015,00017015411015,001 20,00018016812020,001 25,00019018213025,001 20020414030,00022022416030,001 35,0002602901

37、9035,001 32035024040,00040,001-50,00050,001 60 000extraextraextraNote:Stagingshall be extra.Paints to besupplied by owner.Above pricewill be only applicable to work carried out in dock.(2) Hull cleaning ( Per sq.m.)High pressure water washing (pressure over 200kg/sq.cm)0.800.30Washing down with fres

38、h water4.00Removal of oily spotsNote:Under 300sq.m, price shall be charged extra.(2)Stagingshall be extra.(3) Painting (Per sq.m.)DescriptionTouch up one coatFull one coatBottom andwaterline0.400.35Top side0.400.35Deck0.350.30Cargo hold0.450.40Note:Stagingshall be extra.Paintssupplied by owner.(3) I

39、f coatingsof bitumen paint are required, extra shall be charged with addition of 20%, if coating SPC thickness 75 micron add 50% charge, over 75 micron shall be extra.(4) Scraping and Chipping (per sq.m.)DescriptionscrapingChippingBottom andwaterline1.505.25Top side1.253.50Deck1.153.00Cargo hold2.10

40、6.00Note:(1) Prices for surface area in dirty condition shall be charged extra.(2) Staging shall be extra.(3) Other tankwork shall be charged extra.(5) Gritblasting (per sq.m.)DescriptionSA2.5SA2Gritsweepingbottom and1084waterline1194top side12105Deck1412Cargo hold6.5Note:(1) Spotblasting (hull up t

41、o 300sq.m., hold up to 500sq.m. per hold) shall be charged with extra 50% of above price.(2) Excludingnecessary staging and any other accessary work.For doubletank above price extra charged.(4)Surface areain dirty condition to be charged extra.(5)scaling before Gritblasting, price shall extra.(6) Staging (actual length / per meter)Out

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论