

免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
优秀毕业论文翻译范文bolt supporting of large-span soft rockway in shaqu collieryabstract the instability of trapezoidal i-steel support is analysed for the compound roof of main coal seam in shaqu colliery, and the mechanism of bolt supporting is studied. a scheme of bolt supporting has been given and put into practice,remarkable technical and economic benefits have been got.key words :large-span,compound roof, bolt supporting, roductionin shaqu colliery a large coal mine mining rare coking coal in china, most roadways are laid out in main coal seam .the soft compound roof of coal seam is composed of mudstone and coal seam ,which contains aboundant beddings and joints. the strength of the roof is so low that its uniaxial-saturated compressive strength is only 10.7 mpa.rqd value of coal seam and is zero ,and that of mudstone is lower than 10%. there is clay minerals in mudstone, main compositions are interbedded strata of illite and montmorillonite which will swell when soaked by water, the span of preperation roadways and gateways is wider than 4m, and that of some main roadways is over 5m. in shaqu colliery , preperation roadways and gateways were supported by trapezoidal i-steel support, the beams of which were bent and damaged, and the roadways were destroyed seriously within a short period just after excavated. roof controlling of large-span soft rockways in the coal seam became the key to the production and construction of shaqu colliery.2.supporting status and instability analysis of trapezoidal i-steel supportstrapezoidal i-steel supports were used in drawing roadways,which roof span is 4.0m, floor span is 4.9m, and hight 2.95m and spacing 0.5m. initial resistance of the supports was almost zero because it was difficult to the support beams contact the roof, even if with high quality of installation. the trapezoidal i-steel supports would not carry load until the displacement of surrounding rock excceded 80-100 mm because the supports increased very slowly. therefore, right after excavation, the roof would bend and subside severly. eight hours after excavation, the roof strata would break completely, and then form rock cavity. the weight of caving rock would act on the beams of supports, which forms loose rock pressure.by calculating, the ultimate load-bearing capacity is smaller than roof pressure whether it is uniformal or concentrated, based on the in-situ observation, inflection value of most roof reached 200-300mm. when paired supports were used, paired beams were still bent and damaged; then midprops were added, they were also destroyed. many roof beams were stabilized only if 2-3 props had been added. the supports were damaged completely, and most of them could not be reused. the part section of roadways had become inverted trapezoid, and the available section was far smaller than the designed section. part of roadways was out of use because it was in the danger of serious caving.3.mechanism of bolt supportingits mechanism is to make full use of the self-load-bearing capacity of surrounding rock by bolting, and then make the surrounding rock stabilize by itself. the stability of surrounding rock depends on the equilibrium status of ground pressure, self-load-bearing capacity of surrounding rock and anchoring force of bolts. ground pressure is to make surrounding rock deform and break; self-load-bearing capacity is the main factor to stablize surrounding rock. anchoring force of bolts can not change the equilibrium status of the three because it is very small, compared with ground pressure and self-load-bearing capacity. and its function is to change the decreasing regularity of self-load-bearing capacity versus the deformation of surrounding rock, and balance self-load-bearing capacity against ground pressure early.roof pressure is the pressure acting on the roof beams when i-steel supports are used to control the roof. when roof is supported by bolts, the roof pressure change to be the pressure acting on the r
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025陕西西安建工第五建筑集团有限公司3月招聘笔试历年参考题库附带答案详解
- 2025陕西榆林市吴堡县县属国有企业招聘笔试历年参考题库附带答案详解
- 2025贵州安立航空材料有限公司招聘工作人员及笔试历年参考题库附带答案详解
- 2025湖南省低空经济发展集团有限公司招聘12人(第二次)模拟试卷带答案详解
- 2025浙江温州交运集团选聘温州低空经济发展有限公司副总经理1人笔试历年参考题库附带答案详解
- 2025年六安金寨县红旅客运有限公司公开招聘劳务外包制旅游客车储备驾驶员2名笔试历年参考题库附带答案详解
- 2025内蒙古赛雅人力资源服务有限公司面向社会公开招聘196名劳务派遣列车服务人员笔试历年参考题库附带答案详解
- 2025科学技术部国际科技合作中心SKAO国际组织职员招聘考前自测高频考点模拟试题及答案详解(夺冠系列)
- 2025广西来宾市政协办公室招聘所属事业单位后勤服务控制数人员1人考前自测高频考点模拟试题及1套完整答案详解
- 2025昆明市晋宁区文化和旅游局招聘编外工作人员(1人)模拟试卷附答案详解(黄金题型)
- 三年级上册语文《总也倒不了的老屋》
- 2024春期国开电大本科《中国现代文学专题》在线形考(阶段作业1至4+专题讨论1至2)试题及答案
- 楼梯-栏杆-栏板(一)等24项国家建筑标准设计
- 大型连锁医药零售企业发展模式
- 光伏发电项目设计任务书
- 站务员:站务员考点巩固(题库版)
- 大学美育(第二版) 课件 第七单元:设计艺术
- 成人高流量湿化氧疗临床应用规范专家共识2019
- 电大公共政策概论形考任务1-4答案
- 中职生安全教育PPT完整全套教学课件
- 网站信息发布审核制度
评论
0/150
提交评论