


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Sub-Meet Use OnlyProposal Tracking NumberMinnesota State University, MankatoStrategic Priority FundingStep 2: Invited Full Proposal * Please do not use this form until invited to do so by the Planning Sub-Meet. *Proposal Name: This proposal is being submitted for a project that supports (please indicate priority by checking the appropriate circle): Global Solutions Applied Doctoral Institution Extended LearningQuality and ExcellenceCampus of the FutureTotal Funds Requested for Expenditure in FY14 (2013-2014 academic year) $_Primary Contact Name Campus Mailing Address Primary Email Address Phone Number Please note: Upon notification of funding, the primary contact recipient will work with the Assessment and Evaluation Sub-Meet to prepare an assessment plan. Funds will only be released upon successful completion and approval of the assessment plan. A Mid-Year Report will be due January 13, 2014, and an Annual Report will be due June 30, 2014.Primary Contact Signature Date Co-Applicant Name(s) and Signature(s):Date Date Date Date I have reviewed the following proposal:Department Director/Chair Signature* Date Department Director/Chair Signature* Date Department Director/Chair Signature* Date Dean Signature* Date Dean Signature* Date Dean Signature* Date Division/Vice President Signature* Date Division/Vice President Signature* Date Date Submitted to Institutional Research, Planning, and Assessment: (Deadline is January 11, 2013)*Signatures needed for all affected units, departments and colleges. Attached additional cover/signature sheets as needed.Strategic Priority Funding ProposalFull Proposal: Step 2(Please limit the proposal narrative and attachments to 10 pages)Proposal Name: (Increase space between questions or add pages as needed)1. Provide a clear description of the project being proposed. (5 points) 2. Identify the university strategic priority advanced by this project and explain the direct connection between the strategic priority and project. (20 points)3. Describe how the project will have a significant impact on students and deliver a significant return on investment to the university. (15 points)4. Identify the specific measurable outcomes that will be used to measure the impact of the project. (10 points)5. Describe how the activities generated by this project will be sustained after strategic priority funding has ended, or if applicable, explain why the project does not need to be sustained. (5 points)6. Provide a budget justification that explains why the funding being requested is required to support the project and outline the funding requested within the budget table below. (5 points)Budget table:FY14FY14 Matching FundsPersonnel Unclassified Salary (in-load, overload)Classified SalaryFringea (Classified and Unclassified)Graduate Assistant SalaryGraduate Assistant Tuition Reduction/WaiverbNon-SalaryStudent HelpPurchased Services/Travel ExpensesSupplies and MaterialsBuilding Improvement/Construction CostsEquipmentOther (please specify)Total Budget/Funding Requesteda Note: All current employees must be paid fringe benefits. Fringe should be estimated based on salary and position classification: Unclassified 30%, Classified 37%, Adjunct 7.65%. b Estimated Tuition Reduction/Waiver for full-year enrollment: Masters $5,858, Doctoral $10,000.7. Identify any special considerations or needs required for this project (e.g. physical space, contractu
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 象棋胜负判断课件
- 诺病毒知识培训课件
- 2025年分布式光伏发电项目电力建筑工程安装劳务分包合同
- 2025年度教育机构场地租赁与课程合作合同
- 2025年新能源项目法律咨询与服务合同范本
- 2025版大型商业综合体水电安全运行管理合同
- 2025版建筑塔吊安装施工安全监督合同
- 2025年厨房空间利用优化与装修改造合同范本
- 2025年度商业地产项目投资风险评估与预警服务合同
- 2025年度房产租赁保证金退还合同书
- 路灯灯杆项目投资计划书
- 环保项目配电室电气安装方案
- 新概念第二册单词表(完整版)
- 初三考试化学试卷(含答案)
- 2024-2025学年小学信息技术(信息科技)五年级全一册义务教育版(2024)教学设计合集
- 【新课标】人音版五年级上册第一单元 朝夕 大单元整体教学设计
- 自然保护区管理中的生态系统恢复策略
- 试车跑道专项方案
- 2024年交管12123学法减分试题题库附答案
- 2024年湖南省长沙住房公积金管理中心招聘历年高频难、易点(公共基础测验共200题含答案解析)模拟试卷
- KA-T 20.1-2024 非煤矿山建设项目安全设施设计编写提纲 第1部分:金属非金属地下矿山建设项目安全设施设计编写提纲
评论
0/150
提交评论