



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
英文文献翻译翻译原文题目:Trends Driving Quick Die Change文献出处:She C H, Chang C C, Kao Y C, et al. A study on the computer-aided measuring integration system for the sheet metal stamping dieJ. Journal of Materials Processing Technology, 2006, 177(1-3):138-141.翻译正文:推动快速换模的趋势Reading A Judge the Quick and the Die Change阅读A 机不可失时不再来Overseas competition, high material costs, just-in-time schedules, demanding quality requirements, stringent safety standards, and industry consolidation are the forces driving trends in the quick die change industry.海外竞争、材料成本高、准时制、质量要求高、安全标准严、行业整合是快速换模行业发展的动力。These forces have intensified the need for quick die change (QDC)equipment and processes, as well as for larger QDC equipment, machines that will not damage sensors, and more efficient die storage methods that can be integrated with quick die change equipment (Figure 10-1).这些力量增强了对快速换模(QDC)设备和工艺的需求,也强化了对大型QDC设备、不会损坏传感器的机器和与快速换模设备集成的更有效的模具存储方法的需求(图10-1)。Large Quick Die Change Equipment大型快速换模设备Process schematics for sample QDC applications.示例QDC应用程序的流程示意图。Single-stage Die Cart on Rails (Figure 102)轨道单级模具车(图102)1. The old die is pushed out of the press and onto the die cart. The car takes it to the depositing table on the right.1. 旧模具被推出压机,放到模具车上。大车把它送到右边的寄存台。2. The cart then moves to the table on the left, picks up the new tool, and takes it to the press, where the die loader pulls it into its operating position.2. 然后大车移动到左边的桌子上,拿起新的工具,把它带到压力机上,模具装载机把它拉到它的操作位置。Double-stage Die Cart on Rails (Figure 10-3)轨道上的双级模具车(图10-3)1. The old die is pushed out of the press and onto the die easts empty stage (in this example, the one on the right). The cart takes it to the depositing table on the right.1. 旧的模具被推出了压力机,并在模具东部的空白载物台(在这个例子中的右边一个)。推车把它送到右边的寄存台。2. The cart then moves to the right to position its other stage, holding the new die in front of the press. The loader pulls the die into its operating position. The cart now may take the old die to storage.2. 然后大车向右移动到它的另一个载物台,拿着新的模具在压力机面前。装载机将模具拉入其工作位置。这辆车现在可以把旧的模具送到仓库去了。Two Single-stage Die Carts on Rails (Figure 10-4)轨道上的两个单级模具车(图10-4)1. The cart on the left carries the new die. It moves on rails, approaching the press from the side. The other cart, equipped with a push-pull unit, gets the old die out of the press. It then moves backward on its rails, which run straight to the press.1. 左边的车载着新模具。它在轨道上移动,从侧面接近压力机。另一辆车配有推拉装置,可以把旧的模具从压力机中取出来。然后,它在轨道上向后移动,轨道直接向压力机运行。2. The cart with the new die now moves in front of the press, so that it stands exactly between the press and the cart holding the old die.2. 带有新模具的小车现在在压力机前面移动,所以它正好位于压力机和装着旧模具的小车之间。3. The push-pull unit on the second cart pushes the new tool into the press.3.第二辆小车上的推拉装置将新工具推入压力机。4. The cart that first brought the new die now takes the old die back to storage.4. 最初带来新模具的车现在用来把旧模具放回仓库。Domino (Figure 10-5)多米诺(图10-5)1. A domino system changes dies in several presses in a line simultaneously. First the die carts move in front of their respective presses, each one carrying the appropriate new die. In addition, one empty cart moves to the rear of the last press.1. 多米诺系统的模具在一行中同时按几次键时终止。首先,模具车在各自的冲床前移动,每个冲床上都装有相应的新模具。另外,一个空的推车移动到最后一个压力机的后面。2. Carts and press bolsters are aligned. New dies are then pushed into their presses and, in turn, push old dies onto the carts on the rear of these presses, in a domino effect.2. 小车与压杆对齐,然后把新模具推入他们的压力机,反过来,把旧模具推到这些压力机后面的手推车上,在多米诺效应中。How to Judge the Quick and the Die Change Equipment如何判断快速换模设备Choosing the right equipment that will be the most cost-effective depends on each application and what the goal is for changeover time. Because of the trend toward larger presses, demand has grown for very large, dual-position die carts. Quick die change starts with tool design and pressroom layout, and it is critical that the quick die change tooling coordinates with them.选择最具成本效益的设备取决于每个应用程序以及转换时间的目标。由于冲床越来越大,对大型双工位模车的需求也越来越大。快速换模从刀具设计和压力机房布局开始,关键是快速换模与工装配合。Quick Die Change Equipment快速换模设备 Because of the trend toward larger presses, we have begun building extremely large and dual-position die carts (Figure 10-6)由于更大的压力的趋势,我们已经开始建造非常大的双位模具推车(图10-6)Rolling Bolsters滚动摇枕 Rolling bolsters are suitable when the press table is at ground level. The bolster is moved out of the press to allow easy and safe access to the die. The dies are either exchanged directly on the bolster, which is then pulled back into the press, or there is an exchange with a second bolster that has been prestaged with a new die (see Figure10-7). Rolling bolsters using a rigid chain-pull system can reduce changeover time and allow an almost hands- off quick change operation.当压床在地面时,压床支架是合适的,压头被移出压机,以便容易和安全的接近模具。模具或者直接在支撑台上交换,支撑台上的模具被拉回压机中,或者与第二个支撑台交换,第二个支撑台已经预先使用一个新的模具(见图10-7)。采用刚性链拉系统的滚杆可以缩短换档时间,使换档操作简单易行。Rigid Chain Push-Pull Systems刚性链条推拉系统This push-pull system uses a special-link-design chain (see Figure 10-8). Typically, the die is transferred onto bolster extensions, a die ta
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 河北省唐山市玉田县2023-2024学年五年级下学期期末数学试题
- 西南财经大学-公司治理与战略管理
- 学校后勤工作经验交流分享会上校长讲话:全网疯传!最废的校长却带出了最强的后勤
- 幽默课件教学课件
- 巡视病房的观察要点
- 崖壁攀登概述课件
- 岩石书课件教学课件
- 尾矿工安全生产教育培训课件
- 河南省生态园区民宿租赁合同含环保设施租赁说明
- 环保技术研发工人计件合同
- 2024年河南省确山县卫生系统招聘考试(护理学专业知识)题含答案
- 病原微生物感染
- 【物理】2025届安徽省普通高中高三下学期高考全真模拟训练(三)试题(解析版)
- 自然保护区巡护监测员技能测试题库及答案
- 教育资源分配与教育公平的探索
- 消杀灭虫技术培训课件
- 中学实验室安全管理课件
- 中国风设计元素课件
- 北京市救助资金管理办法
- 陕西省西工大附中2022-2023学年七年级上学期第一次月考英语试卷(含答案)
- 新型医药销售外包(CSO)企业制定与实施新质生产力项目商业计划书
评论
0/150
提交评论