免费预览已结束,剩余2页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
合同范本/建设工程合同 plant construction contract article 1-definitionsthe owner shall mean .the contractor shall mean .the plant shall mean all or any part of the machinery, equipment andmaterials forming the permanent installation as specified inappendix.the site shall mean all the land where the plant is to be constructed in accordance with this contract.the works shall mean the works to be done by the contractor under this contract.the contract price shall mean the total sum payable to the contractor by the owner for the works.article 2-contractors responsibilities1. the contractor shall design, engineer, and construct the plant at the site.2. the contractor shall provide all equipment, materials, tools, facilities,labour and services necessary for the successful constructionof the plant except those items and facilities to be supplied by the owner under article.3. the contractor shall perform the works in accordance with the schedulein appendix.4. the contractor shall provide the owners personnel with training of peration and maintenance of the plant in accordance with appendix.5. the contractor shall supply the owner with the spare parts specified in appendix.6. the contractor shall supply the owner with the maintenance equipment specified in appendix.article 3-owners responsibilities1. the owner shall make available the site and grant the contractor freeand uninterrupted access thereto throughout the duration of this contract.2. the owner shall provide those items and facilities specified in appendixat the time therein established.3. the owner will obtain from the relevant authorities those licenses and permits necessary to construct and operate the plant on the site including work permit for the contractors employees.4. the owner shall pay the contractor for the works performed the contract price set out in article.article 4-contract price1. within days after the effective date of this contract, the owner shall pay the contractor as full and complete compensation for accomplishing the works and assuming all obligations under this contract the contract price in the amount of .2. the contract price is not subject to escalation, and the cost of executing he works shall be the risk of the contractor who shall be deemed to have btained all information and taken into account all circumstances which may affect the cost in agreeing the contract price.article 5-drawings1. the contractor shall submit to the owner for approval and review within he time specified in appendix _ such drawings as may be required for construction of the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年CIA考试全科目题型详解及真题答案解析
- 2026年航空物流保税仓储管理员技能认定试卷解析
- 校园图书及教辅资料管理专项检查问题成因及整改措施
- 模板高支撑专项论证方案
- 2026年化工精馏操作工职业技能等级认定题库
- 义乌市机关事业单位招聘考试真题及答案
- 城市物流配送与管理手册
- 木作防潮防腐处理工作手册
- 建筑消防系统整体施工设计方案
- 2025-2026年医学专业耳鼻喉科知识点巩固习题
- 2025年中国泵行业市场白皮书
- 小学语文命题能力培训
- 《小小科学家》教学设计 -2023-2024学年一年级上册科学苏教版
- 2024-2025学年统编版道德与法治一年级上册教学设计(附目录)
- 输变电工程施工质量验收统一表式附件1:线路工程填写示例
- 快速入门穿越机-让你迅速懂穿越机
- 《幼儿教育心理学(第2版)》课后答案 胡玉平石远鹏
- 国能埇桥永镇大营风电场项目环境影响报告
- 中国古典文献学(全套)
- 细胞生物学实验-细胞骨架观察
- GB/T 6104.1-2018工业车辆术语和分类第1部分:工业车辆类型
评论
0/150
提交评论