




已阅读5页,还剩31页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
installation of electrical equipment in hazardous areas,denial of ignition sources to flammable gases,it cannot be stressed how important the philosophies followed to deny ignition sources to flammable gases are. the smallest ignition source can lead to the most dire consequences,both far away deepwater horizon, gulf of mexico, april 2010,and close to home - pingyu coal & electric co ltd, yuzhou, henan province, october 2010,this presentation is based on the international elecrotechnical commissions publication iec-60079,there are other publications such as the national electric code (nec) in the usa that have also produced standards for hazardous areas but the equipment in this project will be to iec standards,the iec has over a century of experience producing electrical standards the first hazardous area standards were created for the mining industry and then expanded to include the oil and gas sector iec standards are not frozen in time but evolve for many reasons such as new materials being produced, technical advances are made and findings from disaster enquires to name but a few these standards are written to provide the best possible protection in the event of a gas escape utilising experience of prior disasters and the leading experts in the hazardous area field,flammable gases require only one source of ignition all equipment must comply with the regulations disaster news stories usually say there was an explosion all regulations must be adhered to = there can be no exceptions,the zones for this vessel can be found on drawing m40188-1030015 - hazardous area plan,plus - all equipment in exterior locations which is capable of operation after a shutdown is to be suitable for installation in zone 2 locations,there are various philosophies that are defined by the iec to deny source of ignition,note; there is a philosophy hierarchy, zone 0 equipment can be used in zones 1&2, zone 1 equipment can be used in zone 2,list of hazardous areas on hai yang shi you 981,bell nipple zone 1 shale shakers - zone 1 heli fuel area - zone 1 battery locker - zone 1 paint locker - zone 1 below heli deck - zone 1 crown zone 1 mud pits - zone 2 drill floor - zone 2 riser storage - zone 2 vents from enclosed hazardous areas zone 2 loading stations port and starboard zone 2 all equipment in exterior locations which is capable of operation after a shutdown is to be suitable for installation in zone 2 locations.,tips on inspection of ex equipment; (a full checklist is provided in the handout) equipment is correct for zone all cables must be armoured glands for exd should be exd or exde glands for exe should be exe or exde armour to be clamped by the gland for ex equipment blanks to be ex rated for exe equipment the glands and blanks thread length should be minimum 6mm or ip washer and internal lockout,when earth ring is used, this must be located between gland shoulder and ip washer exd, exe equipment earth wire should be minimum 2.5mm2 up to 16mm2 power conductor exi equipment earth wire should be minimum 4mm2 all terminations should only have one conductor per terminal all terminations should be correct and tight,wire insulation should be maintain right up to the metal of the terminal crimping tools of the hand rachet type must be used all spare conductors must be terminated both ends insulation resistance test to be carried out,equipment is incorrect for zone,uncertified for zone,correct certification,correct glands and installed to manufacturers instructions,as above gland incorrectly installed,correct size of gland,use of tape,blank plug uncertified,uncertified blank,blank plug to be certified and correctly installed,exe locknut required,incorrect use of earth ring,correct use of earth ring,two cores one terminal,correct connection of two cores into one terminal,incorrect termination,terminal rail to be fixed and free from vibration,exposed conductors,spare conductors to be terminated,cable support,incorrect use of tools,equipment is labeled correctly label to include; the name of the manufacturer or his registered trademark the manufacturers type identification the symbol ex the symbol for each type of protection used the symbol of the gas group for that equipment for group ii electrical equipment, the symbol for the temperature class a serial number except for small equipment and accessories,all the above photos are indeed from our rig the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 猫咪黑下巴的处理
- 农业无人机租赁服务市场潜力分析与平台运营优化策略报告
- 房建工程移交方案(3篇)
- 农业无人机租赁平台在2025年农村市场的运营潜力分析报告
- 东莞东城装饰工程方案(3篇)
- 牵引车安全培训课件
- 安全教育心得培训总结课件
- 农业可持续发展背景下2025年智能灌溉系统技术应用分析
- 荔湾小学面试题库及答案
- 农业产业强镇项目资金申请报告:2025年政策导向与区域布局分析
- JG/T 433-2014建筑幕墙用平推窗滑撑
- 机房日常巡检管理制度
- 家庭养老床位管理制度
- 2025-2030年中国水利工程行业市场发展分析及前景趋势与投融资研究报告
- 风管高空作业施工方案
- T∕CWEA 29-2024 水利水电工程砌石坝施工规范
- 设施赔偿协议书范本
- 2025-2030中国镁合金行业市场深度调研及发展趋势与投资前景预测研究报告
- DB50∕T 632-2015 火灾高危单位消防安全评估规程
- 2025年上半年湖南湘西州龙山县事业单位招聘工作人员41人易考易错模拟试题(共500题)试卷后附参考答案
- 精神科进修汇报:专业护理实践与挑战
评论
0/150
提交评论