




免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
structural analysis of shanghai himalaya art center abstract: zenda himalayan art center is composed with some unique bionic(tree-imitating) buildings that are rarely built in china. some analysis methods and seismic measurement based on the specialties of the structural design are introduced in the article. they introduce construction technology of tube reinforced concrete structures with bionic space variation abnormal surface from location , formwork and support system selection and concrete construction. the structural design of the project could provide certain reference function to similar projects in the future.key words: bionic architecture; special shaped tube; fluid structures; seismic designdevelopment of building shows a complex contradictory forms of exercise. the basic purpose of the building - the use of space which has a function determines the materiality of the building, must be tangible. the building material, structure became necessary means to achieve this purpose. the relationship between means and ends, the form and content of this as the origin, staggered linked together. while part of the building also need to take spiritual metaphysical aesthetic needs, the three-level building technology aesthetics began.shanghai himalaya art center facadesshanghai himalaya art center renderingsshanghai zenda himalaya art center project is located in the plum intersection, fang dian road, pudong new area, shanghai, with a total construction area of about 160,000 square meters, 3 basements. building above ground is composed of three parts, the office, contemporary art center and a five-star hotel , with building length of 210m, a width of 60m. among them, the office is eight-storey, roof structure elevation 61.5m; the five-star hotel is 17 floors, with roof structure elevation 95.7m; contemporary art center roof structure elevates 31.5m, part elevation of 37.1m.shanghai himalaya art center takes a reinforced concrete structure. the most notable is the unique design of the central special shaped tube, including museum of contemporary art, childrens museum of art, the museum of art and experimental theater, an area more than twenty thousand square meters.this part of the unique organic shapes uses the optimization techniques structural evolution (eso method) to design. this computer-aided method uses a computer to control all forms of irregular space volume, automated form shape according to the conditions and mechanical design conditions and make adjustments. costing a minimum of material to form a reasonable structure can be achieved by it.seo methods ensure the implementation and use of the final design of the form completed on the construction drawings. eso method, as a design method, achieves the dual purpose of arts centers function features and spiritual aesthetic, is the bridge of the unity of the form and content.the final three-dimensional model by computer-aided design the final middle part , which is achieved combined with computer-aided design, has been a bionic building which is similar to roots and its vertical components consists of special cylinder-shaped .layout of planeelevations and sectionsits plane is made by a 29 fluid, of which 23 belong to art center and hotels and office buildings both have three of them. horizontal section of each seat fluid is irregular closed curve, for example as 3 floors underground, horizontal section 3.10 24.0m long, 1.70 9.30m wide, total height of 47.60 53.20m, which the 0.000 -16.100m part of is the underground part, 0.000 37.100m for the ground segment. in elevation 5.4,10.8m setting two mezzanine, which is a partial floor, is an art exhibition hall. elevation of 16.200m for the whole floor slab is 2,000-seats multi-function hall (and theater). the whole group was root-like fluid. covering the fluid group is curved arched roof, which is reinforced concrete shell structure. renderings details of art center art center interior renderingsconsidering the specific seismic load in the building design, bionic construction use 27 special shaped tube and the slab between them to form the inter-shaped shear wall system (bionic structure), with the shaped tube suffering the whole load and lateral pressure. and in the case of a constant earthquake , put relative deformation between layers under control by 1/1000 . for smaller barrel-shaped tube, they were reviewed by the seismic requirements for columns at the same time.to reduce twisting of structure, the thickness of special shaped tube varies depending on the distribution of the stiffness of the plane, taking 220 to 600. contact slab with barrel-shaped beam to form integral structural rigidity between special shaped tubes. set wide flat beams around the floor, within the floor mainly is flat slab structure, thickness of 250 to 400, the most of 600.roof is curved arched roof consisting of plate with a certain slope, span of 40 meters. it is designed to strengthen the reinforcement of slab surrounding arch, put amount of prestress to form the constraint of arch sheet. to alleviate the roof load, roof greening uses lightweight nutritive soil.setting up slab in special shaped tubes is by layer(used as equipment rooms), the interior of which can not set slab in is added internal haunched plates, which can provide a supporting and stabilizing effect for tubes.concrete construction diagram of fluid buildings conclusionthe bionic building gradually been widely adopted in modern urban construction. the shanghai zenda himalayas art center which has been finished, following the birds nest, water cube, is another architecture example of bionic art in our country. it has unique architectural style and the singular form, using group of reinforced concrete tube structure which surfaces is varied and shaped in space, fully expressing bionic image of clusters of roots. this bionic structures has not been reported in similar projects at home and abroad, and its successful completion shows that our level of construction and designing in the area has
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 医疗器械行业国产化替代中的品牌形象塑造与传播策略报告
- 2025年新能源行业企业绿色技术创新政策影响分析报告
- 招商银行武汉市洪山区2025秋招群面案例总结模板
- 浦发银行宝鸡市金台区2025秋招结构化面试经典题及参考答案
- 民生银行福州市晋安区2025秋招笔试英文行测高频题含答案
- 2023年度计算机三级预测复习【名师系列】附答案详解
- 民生银行温州市苍南县2025秋招小语种岗笔试题及答案
- 民生银行苏州市相城区2025秋招群面案例总结模板
- 光大银行上饶市信州区2025秋招结构化面试经典题及参考答案
- 兴业银行绍兴市越城区2025秋招半结构化面试15问及话术
- 2025四川达州宣汉县国有资产管理服务中心县属国有企业招聘劳动合同职工26人笔试历年参考题库附带答案详解
- 新教科版小学1-6年级科学需做实验目录
- GB/T 8492-2024一般用途耐热钢及合金铸件
- EPC模式承包人建议书与承包人实施方案
- 主动防护网施工方案
- 三年级下册书法练习指导全册教案(湖南美术出版社)
- GB/T 17880.5-1999平头六角铆螺母
- 2023年陕西省直和西安市接收军转干部划分条件
- 客诉客退产品处理流程
- 自来水厂操作规程手册范本
- 中职实用美术设计基础 2基础教学课件
评论
0/150
提交评论