全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
jv agreement template1.0 purpose.the purpose of the venture shall be to bid upon rfp (rfp number) and, if successful, to enter into and consummate that certain (specify type of services) services for (department/agency name) for the base period of the contract, and options, totaling not more than (number) months from contract award date. 2.0project manager. (name) has been selected as the project manager for this contract and is an employee of (8(a) participant firms name). (he/she) shall be responsible for contract performance, overseeing the job-site, reporting to and implementing the instructions of the managing director, preparing a daily written log detailing all developments and aspects of the job, and submitting such log to the managing director at his request.3.0not less than 51% of the net profits earned by the joint venture will be distributed to the 8(a) participant(s). 4.0bank accounts.the operating account (“operating account”) shall be at (bank name) bank. the operating capital account shall be established in the name of the joint venture, (joint ventures name). all receipts of the venture shall be deposited into its operating account. all checks drawn on the operating account will require two (2) signatures, one from each joint venturer. each joint venturer may designate the person or persons who may sign on its behalf. all expenses incurred under the contract will be paid from the account.5.0 equipment. equipment, facilities and other resources will be provided as listed in exhibit _ .6.0 contract oversight. either venturer will have the right to visit the contract site to evaluate the contract performance.source of labor. the joint venture must perform at least the following percentage of work:(1) services (non-construction). 50% of the cost of the contract incurred for personnel with its own employees;(2) supplies or products. 50% of the cost of manufacturing the supplies or products (not including the cost of materials);(3) general construction. 15% of the cost of the contract with its own employees (not including the cost of materials); and(4) special trade construction. 25% of the cost of the contract with its own employees (no including the cost of materials). see 13 cfr 124.510, 13 cfr 125.6.participant must perform a significant portion of the work.negotiating 8(a) contract(name) will be responsible for negotiating the original 8(a) contract, should negotiations be required by the (department/agency) name, and any subsequent negotiations required by the (department/agency) name.7.0 ensured performance. (8(a) participant firms name) and (partnering firms name) are obligated to ensure performance of the 8(a) contract and to complete performance despite the withdrawal of any party to the joint venture.8.0 books.accounting and other administrative records including the ventures books, and any other records relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name. each venturer shall during regular business hours have access to and may inspect and copy any and all such books and records. sba shall have authority to inspect the records of the venture at any time. 9.0 books. accounting and other administrative records including the ventures books, and any other original records relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name) after completion of the contract.10.0 quarterly financial statements showing cumulative contract receipts and expenditures (including salaries of the joint venture principals) shall be submitted to sba not later than forty-five (45) days after each operating quarter.11.0 project-end profit and loss statements, including a statement of final profit distribution must be submitted to sba no later than 90 days after completion of the contract.sba must approve this joint venture prior to award of the subject 8(a) contract on behalf of the joint venture.subject to sba, u.s. department of (agency) will execute an 8(a) contract in the name of (8(a) participant firms name) and (partnering firms name), inc. trading as (joint venture name) joint venture.int
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年菏泽市第三人民医院公开招聘合同制工作人员(30人)笔试考试备考试题及答案解析
- 2025-2026贵州贵阳市观山湖区逸都国际学校招聘临聘教师4人考试笔试备考试题及答案解析
- 2025福建厦门市集美区顶许小学顶岗教师招聘4人笔试考试参考题库及答案解析
- 信号设备制造钳工改进知识考核试卷含答案
- 蓄电池充电工班组建设知识考核试卷含答案
- 配料熔制工班组协作考核试卷含答案
- 手工平毯工安全技能模拟考核试卷含答案
- 2025呼和浩特春华水务开发集团招聘84名工作人员考试笔试参考题库附答案解析
- 2026广东深圳市事业单位集中招聘高校毕业生658人笔试考试备考题库及答案解析
- 2025山东晨鸣集团生产岗位专项招聘笔试考试参考题库及答案解析
- 拉森钢板桩施工变形监测方案
- 娃娃家来客人了角色课件
- 2025至2030珠宝首饰行业项目调研及市场前景预测评估报告
- 雨课堂学堂云在线《纪录片专题研究(浙江工商大学 )》单元测试考核答案
- 城市综合交通规划报告范文
- (2025年)《巩固拓展脱贫攻坚成果同乡村振兴有效衔接应知应会》测试题及答案
- 高性能芳纶纤维生产线项目可行性研究报告
- 2025年生产厂长年度工作计划
- 游泳协会水质管理员考试题库及答案
- 印刷任务应急预案(3篇)
- 环境适应性总结
评论
0/150
提交评论