已阅读5页,还剩55页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
长安大学结构设计原理课程设计1. Known:(1)Span of SSB: 28m;Computed span L=26.66m;(2)Design load:Vehicular Load -;Pedestrian Load=3.0kN/m2;Coefficient of Importance 0=1.0;(3)Environment:Bridge locates in a common field, environment ; Relative humidity (average of per year)= 75;(4)Materials:Tendon: low relaxation strands(17);Standard value of tension strength ;Design value of tension strength;Nominal area= 140mm2 ,nominal diameter15.2mm;Elastic modulus ;Strand tapered of group anchors.Nonprestressed reinforcement:HRB400,fsk=400MPa,fsd=330MPa.HRB335:(d=(Ms/W-0.7ftk)/(1/A+ep/W)=(3823106/239.927106-0.72.65)/(1/876000+1156/239927000) =2359158NThe control stress of pre-stressed rebar is .The pre-stress losses are estimated as 20% ,We can get the area of pre-stressed reinforcement is:Ap=Npe/(1-0.2)con=2359158/(0.81395)=2114(mm2)To use 3 bundle 6s15.24 strands, the area of pre-stressed reinforcement is :Ap=36140=2520(mm2). And use the strand tapered group anchors, metal corrugated pipe into the hole.2) Lay out pre-stressed reinforcement.(1)Arrangement of pre-stressed rebar in mid-span section:According to the requirement of The Road Bridge Gauge,arrangement of pre-stressed reinforcement in mid-span section shown Figure 3.(2)Lay out steel cable of anchor cross-section: Fig1. End of pre-stressed beam Fig.2 anchor position in the end Fig.3 cable position in mid-spanIn order to be convenient for construction,three steel cables anchor end of beam,which fits principle of homogeneous disperse and requirement of tension.It will offer much pre-shear force by bending more depth of N1 and N2 in end of beam. The all shown Fig1 and Fig2.(3):Location and angle of steel cable from other sections.Bending shape、angle and radius of bending.Obtain interpolate curve between straight lines.In order to make pre-applied force be perpendicular to anchor bearing plate,bending angle of N1, N2, N3 are . Radius of each steel cable is: .calculating location of steel stable control points. Fig.4Calculation step can be shown example of N3,arrangement figure of bending shown Fig.4Calculating horizontal distance between lead point and anchoring point,According to the formula Ld=ccot0,we can have Ld=400cot8=2846mmCalculating horizontal distance between lead point and bending point,According to the formula Lb2=Rtan(0/2),we can have Lb2=15000tan40=1049mmThe horizontal distance between bending point and anchoring point isLw=Ld+Lb2=2846+1049=3895mmThe horizontal distance between bending point and mid-span section isXk=26660/2+256-Lw=5796mmThe horizontal distance between bending end point lead point isLb1=Lb2cos0=2098cos8=2078mmThe horizontal distance between bending end point and mid-span section.X=Xk+Lb1+Lb2=5796+2078+2078=9972mmAccording to the same theory,we can get location of control point from N1 and N2,shown following table钢束号升高值c弯起角弯起半径R支点至锚固点的水平距离弯起点至中截面距离弯止点至跨中截面水平距离N11610.00 8.00 45000156.00 -408.845850.8N2900.00 8.00 30000256.00 5794.049967.13N3500.00 8.00 15000312.00 9746.0211832.6Calculating location and angle of steel cable from all kinds of sections.According to the Figure4,the distance point i to bottom of beam ai=a+ci, angle i. c=100mm.when0,0, 100mm;0when0, 8, Position and angle of steel table from all cross section计算截面钢束编号xkLa+Lbxi-xkcai=a+c跨中截面xi=0N1-408.846259.64 为负值,未弯起0.00 0.00 100.00 N25794.044173.09 N39746.022086.55 L/4截面xi=6665N1-408.846259.64 7073.848.00 551.86 651.86 N25794.044173.09 870.9581.66 12.65 112.65 N39746.022086.55 为负值0.00 0.00 100.00 变化点截面xi=9630N1-408.846259.64 10038.88.00 968.35 1068.35 N25794.044173.09 3835.967.35 246.25 346.25 N39746.022086.55 为负值未弯起0.00 0.00 100.00 支点截面xi=13330N1-408.846259.64 13738.88.00 1488.09 1588.09 N25794.044173.09 7535.968.00 764.04 864.04 N39746.022086.55 3583.988.00 356.17 456.17 (4)The position and angle in flat bend zone N1, N2, N3 are in the same plane at the middle span, but at anchor terminal they are all in the middle lane, to get this result, N2、N3 must be bend from both sides to the middle line in the main beam lab. N2、N3 are take the same to bend up, and the position in flat bend as Fig. Shows. There are two curve arc, each angle is . 3)Requirement for non-prestressed reinforcementTo be satisfied with the ultimate limit state, the number of non-prestressed reinforcement are:After deciding the reinforcement number, non- prestressed reinforcement is decided according to the normal cross-sections ultimate limit state.Assume the distance from prestressed and non-prestressed reinforcements resultant force point to the cross-section bottom is a=80mm,so Assume first kind of T shape beam, according to , we can get the depth of compressive zone x1.05934.5106=22.42200x(1720-x/2)x= 71.5mmlf截面不受反摩擦影响0N21358610361150.5637822N31364210377150.3373309L/4截面xi=8165N1832111854131.596903239.22431.64640158N2842110361150.563782228.192N3847710377150.337330927.522变化点截面xi=11630N1385611854131.596903288.79191.35958522N2395610361150.563782293.076N3401210377150.337330992.21
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 反诈防骗 青春无诈-反诈知识教育主题班会
- 5-Amino-1-1-3-1-terphenyl-3-3-5-5-tetracarboxylicacid-生命科学试剂-MCE
- 信阳高二数学试题及答案
- 2026年金融行业双重预防机制与安全生产标准化研究报告
- 2026年保险行业报告:行业供应链多元化与备选供应商策略研究
- 2026年家电行业节能减排报告
- 2026年互联网广告行业发展趋势与市场潜力报告
- 2026年铝压延加工材行业技术创新与发展前景分析报告001
- 2026年环保产业政策解读与市场机会研究报告
- 2026年餐饮行业餐饮连锁经营模式研究报告
- 2026年特种设备安全使用与管理考试题库(附答案)
- 2027贵州航天电器秋季招聘284人考试备考题库及答案解析
- 电网工程限额设计控制指标(2025年水平)
- 地理信息数据分类分级工作指南试行全文
- 《输电线路岩石地基基础施工方案》
- 再生水回用处理工程设计
- GA/T 2369-2026公安视频图像信息数据分类分级指南
- 油漆工劳务分包合同
- 小学五年级英语语法讲义
- 自信自强勇成长,小学主题班会课件
- GB/T 21125-2026食用菌品种选育技术规范
评论
0/150
提交评论