已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1 Preparations a Ensure the work surface is clean and dust free with good lighting b Assemble all necessary tools and equipment Heater 353ND epoxy 411 epoxy lint free cleaning paper alcohol c Ensure your hands are clean 2 Complete parts Parts for FOCI ST connector From left to right Rubber hood Crimping sleeve Main body including ferrule Connector assembly tools from left to right Fiber stripper Shears PVC stripper Crimper 3 Process flow chart 6 Assembling crimping sleeve and boot 5 Heat curing 3 Inserting fiber into connector body 2 Preparing fiber cable 1 Inserting components onto fiber cable 4 Processing kevlars 4 Assembly Procedure 1 Inserting components onto fiber cable 2 Preparing fiber cable Step 2 Using the PVC stripping tool strip approximately 35mm of the PVC layer See Figure 1 below Step 3 Trim the kevlars with shears to the length as shown in Figure 1 Step 1 Insert in order rubber hood and crimping sleeve onto fiber cable Kevlar 900um Fiber 81116 Figure 1 Step 6 Pull the crimping sleeve forward past the ends of the kevlar Then push the crimping sleeve back ensuring that it gathers all the kevlar strands and holds them neatly out of the way Step 5 Soak a piece of cleaning paper in alcohol and carefully wipe off silicon adhering to the fiber with the paper Step 4 Strip off 900um PVC coating according to the required length as in Figure 1 Step 8 Carefully insert the bare fiber using a pushing and slow twisting motion through the main body and ferrule The fiber should extend out of the other side of the ferrule 3 Inserting fiber into connector body 4 Processing kevlars Step 9 Gently pull the crimping sleeve backwards releasing the kevlar Step 7 Drop a small quantity of 353ND epoxy into ST main body until it is about 60 full A small amount of epoxy may also be applied to the bare fiber Clean off any excess epoxy on the main body with cleaning paper and alcohol Step 13 Cure epoxy on heater at a temperature of 120 C for 15 20 minutes 4 Heat curing Step 12 Place a small drop of 353ND epoxy on the tip of the ferrule using a toothpick Step 11 Use the crimping tool 0 151 diameter slot to fix the crimping sleeve kevlar and main body Step 10 Push the crimping sleeve back up to the main body The kevlar strands should be held neatly and securely under the crimping sleeve Step 16 Using a rotating motion to spread the epoxy evenly around the rubber boot push the rubber hood up to combine with the main body 6 Assembling crimping sleeve and boot Step 15 Put a small amount of 411 epoxy on the crimping sleeve as well as on the PVC tube 1 2cm below the metal part Step 17 Completed assembly Step 14 Break the fiber that extends out of the ferrule with a carbide scribe after cooling the ferrule Just a light touch is all that is required to snap the fiber Should you have any difficulty assembling this product after carefully following the instructions please contact our Marketing Department for technical assistance FOC
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 统战部邪教日常工作制度
- 肿瘤科门诊医生工作制度
- 舆情监测对政府工作制度
- 融媒体意识形态工作制度
- 街道武装部战备工作制度
- 网络谣言传播与辟谣机制研究课题申报书
- 车驾管业务监管工作制度
- 过渡性安置帮教工作制度
- 2026年近几2026年冠县小学考试试题及答案
- 2026年中学生化学实验操作考试真题
- 房车改装采购合同范本
- 电烙铁焊接基础培训课件
- 工程质量潜在缺陷保险项目风险评估报告
- 八年级数学上册线段的垂直平分线沪科版教案(2025-2026学年)
- 2025外交部所属事业单位招聘95人(公共基础知识)综合能力测试题附答案
- 安全环境职业健康法律法规文件清单(2025年12月版)
- 2025年山西药科职业学院单招综合素质考试题库附答案解析
- 校园图书馆安全检查记录表
- 机械制造技术基础 课件 5.2 影响机械加工精度的因素
- 产品经销协议书
- DB32∕T 5188-2025 经成人中心静脉通路装置采血技术规范
评论
0/150
提交评论