国际贸易实务交易磋商模拟及合同制作.doc_第1页
国际贸易实务交易磋商模拟及合同制作.doc_第2页
国际贸易实务交易磋商模拟及合同制作.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

SALES CONTRACT CONTRACT NO: SH2008X509 DATE: 2008 -5-10SIGNED AT: SHAOXING CITY, ZHEJINAG PROVIENCE PAOJING INDUSTRIAL AREA-HIGHWAYTHE SELLER:SHAOXING SINTALON TEXTILE CO., LTD.ADDRESS:SHAOXING CITY, ZHEJINAG PROVIENCE PAOJING INDUSTRIAL AREA-HIGHWAYTEL:FAX:E-MAIL: THE BUYER:J.P.DOUMAK INCADDRESS: 1431 BROADWAY, 10TH FLOOR NEW YORK, N.Y. 10018 U.S.A.TEL: 212-764-4042FAX: 212-764-4043E-MAIL: THE SELLERS AGREE TO SELL AND THE BUYERS AGREE TO BUY THE UNDERMANTIONED GOODS ACCORDING TO THE TERMS AND CONDITIONS AS STIPULATED BELOW1. NAME OF COMMODITY & SPECIFICATION2.QUANYITY3.UNITE PRICE4.TOTAL VALUECIF NEW YORKFANCIES FABRICX60504Width:57/5865%R36%N2%TWeight sbout: 80g/m25000YARDSUSD3.00/YDUSD15000.006. WITH _5_% MORE OR LESS BOTH IN AMOUNT AND QUANTITY ALLOWED AT THE SELLERS OPTION7. SHIPPING MARKS: J.P.D.I. SH2008X509 NOS.1 -100 NEW YORK8. TRADE TERMS: CIF NEW YORK9. PACKING: 100 ROLLS OF 50 YARDS IN ONE ROLL10. TRANSSIPMENT: NOT ALLOWED PARTIAL SHIPMENT: NOT ALLOWED11. TIME OF SHIPMENT: BEFORE 15TH JUNE, 2008 12. PORT OF LOADING: NINGBO13. PORT OF SHIPMENT.: NEW YORK14. TERMS OF PAYMENT: The Buyers shall open with A bank to be accepted by both the Buyers and Sellers an irrevocable transferable letter of credit, addressed to Sellers payable at sight against first presentation of the shipping document to Opening Bank. The Buyers shall have the covering letter of credit reach the Sellers (or notify the Import. License Number)not later than 20th MAY,200815. INSURANCE: To be covered by the Buyers/Sellers for the full invoice valve plus 10% against all risks . If the Buyers desire to cover for any other extra risks besides aforementioned of amount exceeding the aforementioned limited, the Sellers approval must be obtained beforehand and all the additional premiums thus incurred shall be for the Buyers account.16. INSPECTION :The sellers shall have the qualities, specifications, quantities of the goods carefully inspected by the China Import and Export Commodity Inspection Authority, which shall issue Inspection Certificate before shipment.The buyers have right to have the goods inspected by the local commodity inspection authority after the arrival of the goods at the port of destination. If the goods are foundamaged/short/theirspecifications and quantities not in compliance with that specified in the contract, the buyers shall lodge claims against the sellers based on the Inspection Certificate issued by the Commodity .Inspection Authority within 5days after the goods arrival at the destination.17. DISCREPANCY AND CLAIM: The claims,if any regarding to the quality of the goods,shall be lodged within _30_days after arrival of the goods at the destination,if any regarding to the quantities of the goods,shall be lodged within_15_ days after arrival of the goods at the destination. being supported by Inspection Certificate issued by a reputable public surveyor agreed upon by both party. The Seller shall, then consider the claim in the light of actual circumstance. For the losses due to natural cause or causes falling within the responsibilities of the Ship-owners or the Underwriters, the Sellers shall not consider any claim for compensation. In case the Letter of Credit not reach the Sellers within the time stipulated in the Contract, or under FOB price terms Buyers do not send vessel to appointed ports or the Letter of Credit opened by the Buyers does not correspond to the Contract terms and the Buyers fail to amend therefore its terms by telegraph within the time limit after receipt of notification by the Sellers, the Sellers shall have right to cancel the contract or to delay the delivery of the goods and shall have also the right to lodge claims for compensation of losses.18. FORCEE MAJEURE: The sellers shall not hold any responsibility for partial or total nonerformance of this contract due to Force Majeure. But the sellers shall advise the buyers on time of such occurrence.19. ARBITRATION : All disputes arising out of the contract or in connection with the contract,shall be submitted to the China International Economic and Trade Arbitration Commission for arbitration in accordance with its Rules of Arbitration in China.The arbitral award is final and binding upon both parties.20. VERSION: This contract is made out in

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论