



免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Koniambo Nickel Project施工说明书METHOD STATEMENTRev.:0Page:2 of 4Date: 4. NOV. 2011Doc No:319000-3A106-IFC-CM8896-01LIFTING DIRECTION OFLINE1 DUCT OF CE1CB051号线CE1CB05风管Project No. : CM8896Project Name: KONIAMBO NICKEL PROJECTCustomer : EQUIP KONIAMBOSite : NEW CALEDONIA0011.JAN.2012For ApprovalSHAOYTREV.DATEDESCRIPTIONPREPDCHKDAPPDAPPDDATECLIENT5Koniambo Nickel Project施工说明书METHOD STATEMENTRev.:0Page:5 of 5Date: 4. NOV. 2011Doc No:319000-3A106-IFC-CM8896-011、 概述GeneralThis article offers guideline for the lifting of LINE 1 DUCT CE1CB05.此方案描述了1号线CE1CB05风管的吊装方法。2、参考文件REFERENCE DOCUMENTSEK公司给的图纸Drawings by EK。319000-00300-A2001-4100-0007-50263、施工内容 Items to be installedLifting the duct CE1CB05 to install height.把风管吊装到安装高度。4、吊装注意事项LIFTING PRECAUTIONST4.1 All the heavy lifting equipment, slings and pulleys must be subject to careful calculation and inspection prior to use.施工前,所有起重搬运机具、钢丝绳和滑轮等,必须经过检验和验算,证明确实可靠后方可使用。4.2 Operation for the heavy equipment must strictly follow the safety rules relevant to operation and construction.操作起重机械,必须严格遵守安全操作规程及有关施工安全规定。4.3 The equipment shall be lifted according to the sling point specified by the anufacturer. If such hoisting position is not clearly stated, center of gravity shall be determined.起吊设备时,必须按设备出厂标志的吊装位置起吊,无明显标志时,应事先找好重心,确定受力部位。4.4 When 2 or more slings are used for lifting, each sling shall take equal stress; the angle between perpendicular and stress direction shall be no bigger than 300用两根以上的钢丝绳起重时,每根钢丝绳受力应均匀,并与垂线所成的夹角不得大于300。4.5Slings for equipment lifting shall not contact directly with the corners and finish surface of the equipment. Pads shall be applied on these points, in order to prevent damage to the finish surface and wire.吊装绳索不能与设备的加工面或棱角处直接接触,必须垫以木板、胶皮等物,以防损坏加工面和切断吊装绳索。5、安装前准备PREPARE FRONT OF INSTALL 5.1Review the drawings; 图纸是否已经熟悉; 5.2Temporary placement & identification of the members; 设备构件的临时摆放位置,找到构件;5.3Check for the quantity, size & direction of the members; 核对构件的数量、尺寸、方向。6、吊装步骤LIFTING STEPS 6.1Firstly, we should conform the quality of the welding lug again. 首先,我们应该再次确认焊接吊耳质量合格; 6.2Prepare method statement as per drawing and get approved by signature from relevant dep. 根据图纸信息制定施工指导书,并得到相关部门的签字确认; 6.3Technical instruction and JSA shall be provided specifically to workers involved according to the lifting plan. 根据所指定的吊装方案,有针对性的对作业人员进行技术交底及JSA分析; 6.4Rquest for lifting gears 、spreader and 600t (CC2800) crawler crane100t crawler crane (SCC1000) from SARENS, and transport them on site. 向SARENS申请吊索具、扁担、600t和100t的起重机并倒运至现场; 6.5 Transport the part to be lifted to the workplace and install warning signage. Recheck the location of lifting points to make sure safety. 把所需吊装的构件倒运至现场作业区域,并用警示带维护。以及再次复查吊点的分布情况,确保吊点的安全性; 6.6Allocate workers involved appropriately, and ensure they are familiar with drawing and lifting plan. Shackles, slings and spreader bars etc. should be prepared accord- -ing to technical information on the lifting drawing, and rechecked by field rigging engineer and safety personnel. 合理分配吊装工作人员,确保其熟悉图纸及吊装方案。按照吊装方案上面的技术信吊 装卡环、吊带、扁担等吊索具,准备完毕后还要得到现场专业起重工程师及安全人 的再次审查,确保万无一失; 6.7Prior to lifting, familiarize crane driver with lifting plan and work details, and signal- -man from our part shall communicate with corresponding personnel from SARENS to make sure of same signature. Only signalman can send lifting signal to SARENS. 吊装前,确保吊车司机明白我方的吊装方案及所涉及到的工作内容,我方的信号人 提前与SARENS的信号人员沟通好,保证统一的信号手势。并且我方只有信号人 才能给SARENS提供吊装信号;6.8 According to the lifting direction, the 600t crawler crane and the 100t truck crawler crane are to be used together, the two cranes should be lifting the equipment together, till the equipment leave ground a certain height, now unload the 100t crawler crane slowly till the equipment are completely held by the 600t crawler crane. 根据吊装指导,600t的履带吊和100t履带吊配合,同时吊起吊装的设备直到设备离开地面一定的高度,让后100t履带吊缓慢卸载,直到600t履带吊完全受力吊起设备。6.9 A chain block should be used as planed to adjust duct until equipment reached a suitable angle for installation. 用倒链调整吊起的设备到适合现场安装的角度。6.10 There shall be two or three people to hold the wind rope ensuring that equipment penetrates smoothly and exactly through structure holes after equipment is lifted up to t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年西南科技大学人才招聘笔试模拟试题参考答案详解
- 2024-2025学年度合肥职业技术学院《形势与政策》期末考试过关检测试卷及答案详解(夺冠系列)
- 康复医学治疗技术副高级职称重难点附答案详解【研优卷】
- 2025年广西河池罗城特聘农机技术指导员的(1人)考前自测高频考点模拟试题及参考答案详解1套
- 执业药师资格证之《西药学专业一》自我提分评估附答案详解(典型题)
- 强化训练公务员考试《常识》综合练习试卷(附答案详解)
- 2024-2025学年度泸州医疗器械职业学院妇产护理期末综合提升测试卷附答案详解
- 2025年宜宾市翠屏区事业单位上半年第二批考核招聘39人笔试高频难、易错点备考题库及答案详解1套
- 2024年海船船员考试常考点试卷附完整答案详解【有一套】
- 综合解析公务员考试《常识》重点解析试卷
- 第08讲+建议信(复习课件)(全国适用)2026年高考英语一轮复习讲练测
- 政务大模型安全治理框架
- 2024广东省产业园区发展白皮书-部分1
- 2025年国家网络安全宣传周网络安全知识考核试题
- 2025四川蜀道建筑科技有限公司招聘16人备考练习题库及答案解析
- 生态视角下陕南乡村人居环境适老化设计初步研究
- “研一教”双驱:名师工作室促进区域青年教师专业发展的实践探索
- 2025-2030中国教育领域的虚拟现实技术行业发展战略与应用趋势预测报告
- 2025广西现代物流集团第三次招聘109人笔试备考试题及答案解析
- 手卫生及消毒隔离基本知识
- 江苏省徐州市2025年中考英语真题(含答案)
评论
0/150
提交评论