集装箱基础知识-集装箱生产流程.doc_第1页
集装箱基础知识-集装箱生产流程.doc_第2页
集装箱基础知识-集装箱生产流程.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

集装箱基础知识(二) 集装箱生产流程集装箱生产的流程是怎样的呢?下面这张表格,按照先后顺序,为我们列出了从采购到完工的各个关键环节。只要我们认真阅读,就能了解集装箱的生产流程啦。工序working process项目item一、原材料采购Raw and processed material purchasing卷钢coil steel 内角柱inner post方管 square tube型钢 type steel角件corner fitting扁铁(扁钢)flat iron/flat steel门铰链door hinge锁杆及配件locking device with parts绳钩 lashing ring木地板 floor board门封条 door gasket通风器 ventilator铭牌 consolidate plate密封胶 sealant油漆paint二、开卷De-coil开卷 de-coiling 见图1、图2三、预处理Material pretreatment喷砂前材料处理 material pretreatment/preparation 见图3打砂 blasting 喷富锌底漆 zinc primer application 见图4迭板、标识、堆放 placing and marking 见图5、图6四、剪切/冲压Cutting/shearing/forming整平 re-flatting 见图7压型 forming 见图8底侧梁罗拉 B.S.R forming 见图9波纹板罗拉 side panel forming剪切/冲切shearing/cutting 见图10、图11标识 marking 见图12五、装焊总体要求Total requirement for welding(装焊包括以下五个部分)来料检查material checking 装配 assembling坡口 beveling 见图13焊接 welding1)后框Rear frame(见图14)门板装焊 door panel welding后角柱/角件装焊 rear post/casting welding 见图15后角柱拉伸试验 rear post tensile testing门框装焊 rear frame welding门端清理、修磨 touching up/repairing工序working process项目item2)前框Front frame见图16前角柱/角件装焊 front post/casting weld前角柱拉伸试验 front post tensile test前框装焊 front frame weld前端清理、修磨 touch up/repair3)底架Base structure装配底架 base structure assembling底架翻身焊接 见图174)侧板Side panel侧板拼接 side panel jointing- tack welding 侧板拼板自动焊 auto-welding for side panel 见图18、图19侧板与顶侧梁装焊 welding of side panel/T.S.R5)顶板Roof 顶板拼板 roof panel jointingtack welding 见图20顶板拼板自动焊 auto-welding for roof panel 见图21六、总装 Main assembly/general assembly总装台装配 assembling at total assembly station 见图22箱内焊接 inside welding 见图23箱外焊接 outside welding 见图24箱底焊接 base welding 顶板装配 roof fixing顶板焊 roof to T.S.R welding清理、修磨 touching up/repairing七、整箱打砂 Whole box blasting箱外、箱内喷砂 inside/outside blasting 见图25箱体修理 touching up/repairing八、油漆Painting底漆、中间漆、面漆、内面漆喷涂 paint application (base primer or zinc primer/2nd coating or medium primer/top coating or top primer/interior top coating) 见图26、图27、图28分色anti-cross-pollution 见图29九、完工Finishing line底架涂胶applying sealant on base 见图30木地板装配applying floor board 见图31木地板钻孔 drilling holes 见图32、见图33紧地板钉 tightening floor tap screw 贴箱标 sticking decal/mark 见图34安装铭牌 consolidate plate 见图35装通风器 fixing ventilator 见图36装门封 applying door gasket 见图37安装门封压条 applying gasket retainer 装锁杆 applying door locking device 见图38清洁 cleaning检查漏光 checking

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论