



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Issued by Department/Section:Quality AssuranceEffective Date:6/18/0405/23/9710/19/98CP Number:4105-R3R74Title:Issuance & Control of PrintsIssued by:H. RossoD. KraftPage: 2 of 3Standard Operating ProcedureSupersedes:6/20/0005/31/9605/23/97QS1.0PURPOSE:To establish methods for the issuance, distribution, and control of prints both within the Char-Broil organization and to vendors of purchased parts and tools.2.0 APPLICABILITY:The provisions of this procedure apply to the distribution and control of all engineering prints issued by Char-Broil.3.0REFERENCES:cp CP 4103, Document Controlcp CP 7100, Engineering Change Order (ECO) Procedure4.0 RESPONSIBILITIES:4.1 Product Engineering (PE) is responsible for the overall print program administration. This includes print preparation, revision, distribution and the ECO system. PE maintains the Product Data Management System, referred to as Windchill.4.2 Purchasing is responsible for the following:4.2.1 Send prints and any revisions to Char-Broil vendors.4.2.2 Maintain records of print change transmittals and acknowledgements. 5.0PRINT CONTROL: 5.1Product Engineering issues initial and revised prints using the ECO process.5.2 The official file for controlled two-dimensional (2D) hard copy prints is located in the Char-Broil Document Vault in Windchill. 5.3 5.3The official file for controlled telectronic print filehree-dimensional (3D) Pro-E electronic files is managed by IntraLink. ApprovalsMfg. Tech. SupportProd/EngProductionPurchasingQ. A.MarketingCreative Svcs.15.4All departments have access to view prints through Windchill. 5.4.1 To access and view prints, double click the Windchill icon.5.4.2 When prompted with the log-in box, type in windchillview under user name and password. 5.4.3 The Windchill home page will be displayed, click on local search.5.4.4 At the pull down menu, arrow down to Char-Broil Document Vault and click on it. 5.4.5 Drawings are stored by drawing number. Double click on drawing number of choice.5.4.6 If searching for drawings by part number, click on Char-Broil Part while scrolling through the pull down menu. When in, double click on part number of choice to view print. 5.5 Controlled prints are only those viewed from the Windchill Vault. When printed from the system, prints are watermarked “Uncontrolled Copy” in all corners of the drawing (see section 6.0). 5.6 For situations when drawings must be printed for a hard copy, the date and time the drawing was printed will appear in the upper left corner of the print. The hard copy is considered a “Controlled Copy” for 24 hours following printing. After that time, the print becomes uncontrolled.5.7 For First Piece Approvals, the hard copy print included in the package is the revision the part was approved to. 6.0UNCONTROLLED COPIES:6.1Make uncontrolled copies of prints only when necessary. Uncontrolled copies are for short term, temporary use only (See section 7.0 for exception).6.2 When printed from the Char-Broil Document Vault, the watermark “Uncontrolled Copy” will appear in all corners of each drawing. 6.26.3Char-Broil will not verify product using an uncontrolled copy of a print.7.0PRINTS USED FOR PURCHASED PARTS7.1 If an ECO affects a purchased part and changes a print revision, Product Engineering will revise the print in Windchill.7.2If the print is transmitted via electronic means, the sent email will be utilized as acknowledgement of the change communication. The Purchasing Agent transmitting the file will be responsible for retaining proof of electronic files being sent.7.3The vendor must return a confirmation of the transmittal to acknowledge receipt of the updated print. The Purchasing Agent retains the record of transmittal and keeps it until the print is revised again. 7.44All purchase orders (POs) sent to vendors include the part drawing number and revision level of the print. All future parts produced by the vendor for Char-Broil should be at the latest revision level issued to the vendor. Parts being revised by a coordinated running change may continue to be shipped under the prior revision until inventory is depleted. The Purchasing Agent must approve a deviation for shipping a different revision than noted on the PO via a transmittal record to be retained for tracking deviations.Issued By:Darryl KraftHoward RossoIssue Date:5/23/9710/19/986/18/04Replaces:6/20/005/31/965/23/97Reason for Revision:Updated the Purchasing transmittal of changes to current electronic methods.- Reduce Authorized Print Libraries and delete Appendix A by including information in section 5.3.1.- Simplify requirements of print controlChange cp to CPDistribution:
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 第三单元 综合性学习 人无信不立 公开课一等奖创新教学设计-【课堂无忧】新课标同步核心素养课堂
- 部编版语文三年级上册第四单元 快乐读书吧在那奇妙的王国里 (+公开课一等奖创新教案)
- 13*一块奶酪(+公开课一等奖创新教案+备课素材)
- 化妆品厂安全生产培训课件
- 内河基本安全培训费用课件
- 肝病中医护理护士进修
- 元素课题3课件
- 内分泌疾病课件教学
- 内保安全培训制度建设课件
- 元的统一与拓展课件
- 2025年海南省科技创新发展服务中心招聘事业编制人员2人考试模拟试题及答案解析
- 安置帮教普法培训
- 培养基验收课件
- 行政执法应诉培训课件
- GB/T 45958-2025网络安全技术人工智能计算平台安全框架
- 阿尔茨海默病营养管理
- 养老护理员职业道德课件
- 护理专业全面解析
- 除颤护理课件
- 【化学 云南卷】2025年云南省高考招生统一考试真题化学试卷(含答案)
- 创伤性硬膜下出血查房
评论
0/150
提交评论