




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Lingnan MBA CenterLingnan (University) College, Sun Yat-sen UniversityCase OverviewThe Hewlett-Packard Managers from each department had a meeting to discuss about whether using a universal power supply for the next generation of network laser printer called “Rainbow” is beneficial or not. They have the authority to make the decision while strong justification should be provided to defend their proposal.HP is developing its new generation network printer while it has been struggling from 3 main issues l The power specification for the printer is different in North American (110 volt) and European (220 volt). This differences brings a big challenge in HPs market forecasting and the subsequent stockout and transshipment between regrions; l HP needs to provide the specifications to its major partner in Japan at least 14 weeks ahead due to the abovementioned different power standard issue;l The specification readiness time can be postponed for 2 months if a universal power supply is used, however an extra cost of $30 for each printer will be needed.Case Questions1. In what way is a universal power supply a postponement strategy?HP has two specifications for its printers, 110-volts for North American region and 220-volts for European region. One of the crucial part of the printer is engine. It is built by one of HPs manufacturing partner in Japan who needs the specification 14 weeks in order prepare for production. However production period only takes four weeks. The dilemma is that should HP were to develop universal power supply, it can have the flexibility of postponing the specification requirement to its partner by 2 months. On the other hand, should the universal power supply strategy is implemented, HP can respond the demand in the individual market by optimizing is inventory and reducing its indirect cost that hits is SG&A.2. What are the costs and benefits of a universal power supply (feel free to make assumptions)?Costsl If HP incorporate the universal power supply and sell 450,000 units of Rainbow, it will cost the company approximately $13.5 million in additional material costs (an extra cost of $30 for each printer).l If the $30 extra cost is eventually passed through to customer, the increase in price by may also reduce revenue (sale).l Since all the printers assembly will heavily depend on one single power supply accessory which is supplied by only one supplier, any design defect (or even global recall) may need to a sales and reputation disaster.Benefitsl Avoid cost of stock out due to the switching to another brand of customers. Switching to another brand means that HP might lose its customers for over three or four generation of printer as well as the revenue from selling ink cartridges.Assume that without universal power supply -Product life cycle: 18 months; Monthly sales: 25,000 units. Total sales = 450,000If there are 20% of goods needed to be transshipped and then reconfigured between DCs due to incorrect market forecast. The extra cost will be:450,000 * 20% * ($75 shipping cost + $250 reconfiguration cost) = $29,250,000With universal power supply The forecasting improved so that only 10% of goods needed to be transshipped and then reconfigured between DCs, the extra cost will be$450,000 * $30 + $450,000 * 10% * $75 = $16,875,000The extra cost of with universal power supply is SMALLER than without it.l With universal power supply, ideally HP no longer needs to develop demand forecast for each market. It only needs to generate estimated worldwide product demand four months ahead.l Allow HP to better forecast demand as a whole, which is more accurate. Consequently, it reduces inventory buildup issue.l Flexible to respond to customer order so that HP can increase service level.3. How would such costs and benefits be different over the product life cycle?Over the product life cycle, both cost and benefit are different. l At the beginning life cycle (ramp-up) of product, the cost of stock out would be high because for every order lost would not only result in lost in revenue but also future revenue. The theory is the customers tend to buy similar product and/or brand to keep consistency. In addition, it takes over four life cycle of product before that customer returns to HP. l At the maturity stage, the extra cost, although very small, can be a real disadvantage because during this period, the market becomes very competitive and many players enter the same field causing price to drop. Customers also become more price-sensitive. However, the benefit of better forecasting demands significantly helps lower the level of inventory.l At the ending life cycle, cost of stockouts is lower than compared to at beginning because there is less fear of losing future sale.4. Besides deciding on a universal power supply, what other operational improvements can you suggest to HP Boise?One of the suggestions HP should consider is improving forecasting ability to ensure appropriate demand is met in all sector while optimizing inventory level. In addition, HP should also look in to creating similar standardization of power supply in other product offering such as workstations and servers. It is also possible that HP can consolidate all power supply (for servers, workstations and printers) to its manufacturing partner in low cost country. The idea is to consolidate and standardize which in theory creates efficiency, and optimize all level of cost including inventory.5. What would be your recommendations about the adoption of a
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 法式建筑夜间调色方案设计
- 电焊安全培训班课件
- 波粒二象性课件
- 波峰炉安全培训课件
- 数字农业浪潮中2025年农产品质量安全追溯体系建设实施方案前瞻报告
- 建筑方案设计会审纪要
- 安全生产月“安全生产党员先行”主题党日活动方案
- 初中学校教师学历提升计划方案
- 2025年大队委评选方案:小岗位托举大梦想 红领巾伴我共成长
- 南方建筑防潮措施方案设计
- 2025至2030中国高压水射流行业项目调研及市场前景预测评估报告
- 2025合作劳务外包协议范本
- 急性胰腺炎早期液体复苏的思考 2
- 急性闭角型青光眼合并高眼压护理查房
- 2025年工会财务知识竞赛考试题库及参考答案
- 税收的原则课件
- 医疗机构应急管理与急救技能手册
- 2025留置辅警笔试题库及答案
- 胸椎后纵韧带骨化症
- 2025年秋季小学三年级上册语文教学计划
- 2025未签合同劳动争议仲裁申请书
评论
0/150
提交评论