已阅读5页,还剩100页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
les disposicions pertinents de lestat a la verticalitat seguretat supervisi i gesti departaments per avaluar operacions especials unitat nacional ha aconseguit qualificat personal format certificat abans de participar en el corresponent treball o gesti. 7, ls de la unitat dequipament especial ha de ser seguretat equip especial dequipament especial operador educaci i formaci, i operadors dequips especials disposen del material necessari especial per assegurar la seguretat operacional de coneixement. 14, pont de normes de seguretat operaci 1, capit, el monitor i els principals tipus de treballadors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat est estrictament prohibit beure. 4, est estrictament prohibit per a erecci mquina de biga moviment longitudinal i lexterior a la nit. 5, un pont en ambds costats de lrbita longitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista datletisme i un control estricte de lespai, tres pistes ha de ser parallel. 6, installaci de biga de formig de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontollen i tornada, limport es calcula segons els angles oblics i lamplada de les rodes desquerra i dreta, per tal que els cotxes poden crrer sobre una pista horitzontal. 7, pont de desplaament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, instal lar superior i inferior pendent vertical, desplaament longitudinal de mquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i posterior per a la protecci, espai especial columna 1, molt a prop de la biga, al control de latenci. 9, un pont penjant penjant de provar que la installaci de la mquina ha de ser corregut, tamb es pot utilitzar desprs de la crrega de la prova de la biga de formig i pont erigir mquina i llavors crrer per comenar la feina dinstallaci. 10, quan erigir installaci mquina, comprovacions de seguretat regular, una seguretat integral comprova cada installaci un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecnic i elctric amb malaltia no estan permeses. 11, la sobrecrrega doperaci dinstallaci no s perms. Nivell, ha de ser enfortida sobre terreny prou slida, coixinets Outrigger cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent s superior a 13.8M / s (equivalent a 6 vent), grua no deures, quan la longitud de bra s superior a 50 m quan la velocitat del vent no podr ser superior a 9.8M / s (lequivalent de 5 vent). I prestar atenci als efectes en lestabilitat de la grua, vent no penjar-se, davant el vent t alguns perills, alant el contrari. (3) estrictament segons la capacitat nominal quan laixecament de la taula i aixecar loperaci corba desociety; after after 60 years of development, the socialist society more full of life And vigor. The remarkable sign is in China adhere to the basic principles of scientific socialism, not lost ancestors, always adhere to dialectical materialism and historical materialism as the theoretical foundation, adhere to the to the realization of communism as the supreme ideal, adhere to the Party of the working class as the core of leadership, insist to liberate and develop productivity is the fundamental task, adhere to represent the most numerous peoples fundamental interests, adhere to public ownership and according to work, distribution is the basis of the socialist economic system, adhere to the position of the people as masters of the country is the essential characteristic of the socialist democratic politics, adhere to reform and improve the socialist system and institutional mechanisms, and so on. At the same time, our country socialist And with distinct Chinese characteristics, the road of socialism with Chinese characteristics, the system of theories of socialism with Chinese characteristics and the socialist system with Chinese characteristics, are deeply rooted in the creative practice of hundreds of millions of peoples indomitable, timely response to practice innovation theory calls, rich heritage of both historical and cultural traditions of the Chinese nation, and let the Chinese people love to see and hear the Chinese style and Chinese style, comply with the requirements of the development of the times, reflect the common aspiration of the people, with distinct characteristics of the practice, theoretical characteristics, national characteristics, characteristics of the times. Therefore, it can always maintain the vigor and vitality, and always guide contemporary China along the right direction stride forward. So we must always hold high the great banner of socialism with Chinese characteristics unswervingly. On the other hand, Chinas socialist society is still in primary stage, which is Chinas construction of socialist modernization insurmountable historical stage, the need for hundreds of years time. Chinas socialist system was born in semi colonial and semi feudal society, productivity level is far behind in the developed capitalist countries, which determines the our country must experience a long primary stage, to realize in other countries under the conditions of capitalism to achieve industrialization and production in the market, socialization and modernization. Today, our country socialism has made remarkable tremendous To accelerate the pace of achievements, but our country fundamental realities of the country is still has a large population, weak thin, development is not balanced. Chinas economy has leapt to the world, but the per capita gross domestic product is still ranked in the world the 90%; economic sustained and rapid development, but the development is not balanced, coordinated, can not be continued problems are still prominent, the transformation of economic developmentManipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standards. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like welding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand合肥市铁四局中学及三十二中学附属工程施工 合肥锦志工程施工有限责任公司 合肥市铁四局中学及三十二中学附属工程施工方案合肥锦志工程施工有限责任公司2011年11月27日目 录第一章 工程概况第二章 主要施工方案第三章 确保工程质量的管理体系与措施第四章 确保安全生产的技术组织措施第五章 确保文明施工的技术组织措施第六章 工程施工的重点和难点及保证措施第一章 工程概况合肥市铁四局中学、三十二中学均位于合肥市包河区。合肥市铁四局中学及三十二中学附属工程施工景观绿化、给排水、铺装、停车棚、32中报告厅装饰等工作内容,工程总投资约400万元。建设单位是合肥市包河区城市建设开发投资有限公司。本工程合同工期30天,质量等级为合格。我单位一旦中标,将派遣我公司的注册建造师王文艺为项目经理,工程师潘祖元为技术负责人,并根据本工程分布在两所学校的特点,在每个学校分别配备现场项目负责人、施工员、质检员、安全员、材料员等专业人员,组成一个强有力的项目领导班子。两个项目现场管理班子统一受项目经理、技术负责人的协调与指挥。另分别配备道路班组、管道班组、安装班组、装饰班组及土方班组等。施工工人每个班组不少于20人,确保在合同工期内完成工程施工,并达到合格及以上标准。针对本工程工期紧、任务重,安全文明施工要求很高,质量要求严格的特点,我单位将集中力量做好施工组织管理工作。第二章 主要施工方案一、道路工程(一) 路基施工1.测量准备:开工之前,先按设计所交控制桩进行全线贯通测量,现场恢复和固定路线。其内容包括导线、中线的复测,水准点的复测与增设,测量完成后,整理这些资料并由测量员及其主管技术人员共同签字,送交监理工程师核查;在监理工程师核准测量成果后,按图纸要求现场设置路基用地界桩和路基坡脚 、取土坑、弃土堆等的具体位置,标明其轮廓,报请监理工程师检查批准;施工测量的精度符合相关技术规程的要求。2.土工试验准备:施工前对图纸提供的挖方、借土场、料场的路堤填料取有代表性的土样进行试验,试验方法按JTJ051-93公路土工试验规程标准方法进行颗粒分析以及液限和塑限、有机质含量的测试和击实试验,击实试验采用重型击实法,确定土的最大干密度和最佳含水量,并将上述测试结果报监理工程师审批。3.路基施工前,应先选择试验段,通过试验确定含水量控制范围、松铺厚度和碾压机械配套、组合及碾压遍数,为大面积施工提供控制参数。4.路基开工前首先对图纸所示各类现有建筑物、障碍物、设施的位置及地面附着物进行现场核对和补充调查,如发现与图纸不符,应及时报告监理工程师核查。5.施工前,砍伐或移植清理路基用地范围内的树木、灌木丛等,砍伐的树木堆放在路基用地之外,并妥善处理。6.按图纸要求或监理工程师指示拆除路基用地范围内必须拆除的建筑物、障碍物和设施,正在用于通行的旧路面以及排水结构物,在对其正常交通和排水做出合理安排之后,再进行拆除。7.清除取土场和路基用地范围内的树根、垃圾、废料、有机物残渣及监理工程师指定的厚度内的草皮和表土。将其堆放在弃土场内。8.对于拆除的构件可堆放在路基用地范围以外不妨碍施工的选定的非耕地上,以便再利用或废弃,堆放的杂物要按照弃土堆的有关要求进行办理,以堆放稳定、不干扰交通和污染环境、整齐美观等为原则。树根、草皮、灌木等在保证安全的情况下可进行焚烧。9.清理和拆除完毕,将遗留下的坑穴、池塘用设计材料或监理工程师同意的材料回填,并对场地进行必要的修整、铺平和压实,达到规定的要求后,邀请工程师进行检查,补测地面标高,并绘制新的填挖断面图报监理工程师审核合格后进行下一工序施工。路基压实度按重型压实标准,其压实度要求为见下表:路基压实度路床土最小强度要求填挖类型深度范围(厘米)填料最小强度(CBR)压实度()车行道路基人行道路基填方03069594308049594801503949315029290挖方030695943080495/表中填料最小强度是指车行道路基的要求。10、路基施工一般要求路基必须密实、均匀、稳定,回弹模量应大于30Mpa。路基填筑前,先将设计图纸要求的表土、软土等不适用土以及路床换填部分的土清除后并碾压路基基底压实度至95%,方可进行路基的填筑工作。道路施工时,若遇有暗沟(塘)时,应清除塘底(沟底)及两侧淤泥后,再进行下道工序施工。为加快施工工期及保证填筑效果,道路路基及管线沟槽按照排水工程设计要求进行回填,一般路基段填方路基应分层铺筑,均匀压实。路基填土不得使用淤泥、有机土,含草皮土、含生活垃圾土。如一层压实达不到规定的压实度要求,必须分层压实。当路基或管线施工开挖较深时,需采取放坡、覆盖等措施防止土体剥落,引起滑塌的现象,以免影响施工安全。回填时如一层压实达不到规定的压实度要求,必须分层压实。施工时应严格按施工规范进行回填碾压。管、涵顶面回填厚度,必须大于40cm方能上压路机。当排水管采用UPVC塑料管时,其顶面回填厚度必须大于或等于50cm方能上压路机。桥涵、管道沟槽、检查井、雨水口周围的回填应在对称的两侧或四周同时均匀分层回填压(夯)实。分层最大的厚度必须与压实机具功能相适应,其压实度必须符合路基压实标准表的要求。路槽底面土基回弹模量值宜大于或等于30MPa,土路槽(路床)不得翻浆、软弹、起皮、波浪和积水等。(二)、碎石基层宜选用天然级配砂砾石。天然级配砂砾石应符合下表的级配要求,液限应小于28,塑性指数在9以下。砂砾石级配范围表筛孔尺寸(mm)5337.59.54.750.60.075通过质量百分率()10080-10040-10025-858-450-15塑性指数偏大的砂砾,可以用无塑性的砂或石屑进行掺配,使其塑性指数降低到符合要求。砂砾层摊铺后适当洒水,分层压实,应用12t以上三轮压路机碾压,每层的压实厚度不应超过1518cm。用重型振动压路机和轮胎压路机碾压时,每层的压实厚度不应超过20cm。砂砾层两作业段的衔接处,应搭接拌和。横缝第一段拌和后,留5m不进行碾压,第二段施工时,前段留下未压部分与第二段一起拌和整平后进行碾压。纵缝前一幅全宽碾压密实,在后一幅拌和时,将相邻的前幅边缘30cm搭接拌和,整平后一起碾压密实。(三)水泥混凝土面层施工1、水泥砼面层施工工艺框图验 收试件搅拌运输混凝土工 程 监 理养 生控制水泥凝结时间路面基层验收合格配合比试验材 料 检 验拌和站备料切 缝压 纹收 光震 捣摊 铺立 模放 样施工准备2、施工方法A、技术要求: 道路路面砼应采用普通硅酸盐水泥,水泥强度等级不小于42.5级。 严禁未经建设单位、总监理工程师同意在道路路面砼中掺加粉煤灰。 道路砼路面中的各类窨井部位砼一律采用二次浇注法施工,按城市道路设计规范要求设置胀缝。 路面砼模板应位置准确,支立牢固。对纵缝位置跑模砼应用切缝机切割到底,保证纵向侧面平整。严禁切割不到底人工修凿。 路面砼一次浇注长度不宜小于100米,横向施工缝设置传力杆,传力杆采用直径为20mm的钢筋,间距25cmB、施工方法:在基层施工完毕后,洒水养护数日即可进行砼面层的施工。配比计量均采用电子称量系统,以确保砼质量。首先根据施工图确定浇筑面层的轴线以及两侧模板高程进行施工放样。为保证砼浇筑质量,满足有关规定,面层模板均采用定型钢模支立,做到模板平顺、垂直、不倾不斜,支立牢固,每隔1.5m左右用三角支撑进行固定。模板支立后还需对高程和轴线进行校核复测,并加固,保证浇筑过程中模板不变形,高程和模板轴线位置准确,浇筑砼前对模板涂刷隔离剂。经监理同意后进行砼面层浇筑。并根据规定对进仓砼进行随机留取抗压、抗拆试模,作为质量评定依据。砼进仓后用人平,并防止骨料堆积;先用振动棒进行振捣,然后平板进行振动,最后用附着式振动梁和滚筒提浆;用长刮尺将浮浆刮平,用木抹、铁抹收光三遍;这些构成市政道路施工的关键程序,有专人负责且明确责任,保证面层砼浇筑的高标准。成型一段时间后,当路面砼达到设计强度的2530时,用切缝机切缝,切缝过早易造成砼面层破损、刻痕;切缝过迟使切缝难度加大且易造成温差变化而引起砼板块拉断。切缝用水冷却时,防止切缝水渗入基层和土基。砼板养护期满后,表面平整度误差在5mm之内,相邻板高差在3mm之内,纵横缝直顺度在10mm;砼抗压、抗折强度不低于设计及有关规定要求;刻纹间距20mm,深度2-3mm,纹宽4mm,路面缩缝缝宽68mm,深度为板厚的1/41/5,灌缝料一律采用嵌缝胶。砼面层浇筑后加盖麻袋等覆盖物,并进行人工洒水养护,以保持面层湿润,养护时间不小于7天。在砼面层浇筑过程中需注意:a 砼最大水灰比不大于0.5b 入仓砼不离析,防止骨堆积;c 确保砼振捣密实;d 在面层收光过程中,视具体情况调整仓面作业人员;e 具有防雨和有效的养护措施等。气候条件工地气温低于5,不应进行施工,并应在重冰冻之前一个月结束。雨季施工,应特别注意天气变化,勿使水泥砼熟料受雨淋,降雨时应停止施工,并用雨布覆盖。C、纵、缩缝与胀缝的施工混凝土板的纵缝采用加拉杆的平缝,横向缩缝采用假缝。机动车道上的横向缩缝不设传力杆,但在邻近账缝的三条缩缝内设传力杆;当混凝土板块划分出现错缝时,与接缝相对应的板边加防裂钢筋;在雨水口周围及雨(污)水检查井周围混凝土板中应进行加固处理。水泥混凝土板接缝要求具体如下:纵缝:设拉杆的贯通缝,拉杆钢筋II级钢筋16,长80厘米,间距70厘米;施工缝:位于缩缝处,设传力杆的贯通缝,应设顶头木模固定传力杆,传力钢筋为I级28,长45厘米,间距30厘米;缩逢:为切缝,应在砼强度达到设计强度的30%时,采用切缝机切割。缝宽6毫米,缝深为5厘米,间距为5米(调整范围为4米),灌缝料为道路嵌缝料。胀缝:具体做法参照城市道路(皖)及,与老路相接处采用设边缘钢筋型及角隅加固钢筋,新做道路处采用设传力杆型。胀、缩缝灌缝料采用道路嵌缝料,胀缝板可采用软木板。在水泥混凝土路面中的鱼、污水井及各种市政公用设施(如自来水、电力、电讯等)检查井,应设置胀缝与砼板完全隔开,并在其周围加设防裂钢筋,详见城市道路(皖)38。胀缝应与路面中心线垂直,缝壁必须垂直,缝宽必须一致,缝中不得起浆。胀缝位置见平面图。邻近胀缝或路面端部的三条缩缝应设传力杆。具体做法参照城市道路(皖)。 (四)沥青混凝土路面施工1、技术要求:上面层应具有一定的抗滑性能,要求横向力系数(SFC)不小于50、构造深度(TC)不小于0.50 mm。(1)材料要求A、沥青根据气候分区及交通等级使用要求,沥青应采用A级70号道路石油沥青,各项技术指标见下表。SBS聚和物作改性剂的改性沥青,应采用适宜的生产条件和方法进行,通过试验确定合理的改性剂量和加工温度,改性剂应分散均匀并达到一定的细度,各项技术指标见下表。A级70号道路石油沥青质量技术要求 一 检验项目技术要求针入度(25,100g ,5s) (0.1mm)6080针入度指数PI-1.5+1.0软化点(R&B)() 不小于4660动力粘度 (Pas) 不小于180延度10,5cm/min (cm) 不小于20延度15,5cm/min (cm) 不小于100含蜡量(蒸馏法) (%) 不大于2.2闪点() 不小于260溶解度 (%) 不小于99.5TFOT后质量变化(%) 不大于0.8残留针入度比 (%) 不小于61残留延度(10) (cm) 不小于6密度(15,g/cm3) 不小于实测记录SBS改性石油沥青质量技术要求 检验项目技术要求针入度(25,100g ,5s) (0.1mm)4060针入度指数PI 不小于0软化点(R&B)() 不小于60135动力粘度 (Pas) 不大于3延度5,5cm/min (cm) 不小于20闪点() 不小于230溶解度 (%) 不小于99弹性恢复25,(%) 不小于75贮存稳定性离析,48h软化点差,() 不大于2.5密度(15,g/cm3)实测记录TFOT后质量变化, (%) 不大于1.0残留针入度比(%) 不小于65残留延度(5) (cm) 不小于15B、粗集料用于沥青面层的粗集料应洁净、干燥、无风化、无杂质,具有足够的强度、耐磨耗性。厂家应有专门的除尘设备,严格控制针片状颗粒含量、粉尘的含量,采用反击式破碎机进行破碎,将集料加工成最后的产品,反对鄂式机反复破碎,以防集料产生内伤,影响路面质量。粗集料应具有良好较正方的颗粒形状。粗集料质量要求应符合下表的规定。沥青混合料粗集料质量技术要求 混合料类型石料压碎值 (%)洛杉矶磨耗损失表观相对密度吸水率(%)坚固性 (%)针片状颗粒含量水洗法0.075mm软石含量磨光值(PSV)与沥青粘附性表面层 26 28% 2.6 2.0 12 15% 1% 3% 404级中下面层 28 30% 2.5 3.0 12 18% 1% 5%4级C、细集料沥青上下两层沥青混合料的细集料应洁净、干燥、无风化、无杂质,采用适当级配的机制砂,不得采用石屑和天然砂,严禁采用山场下脚料。其质量应满足规范的要求,其规格应满足下表的规定。沥青混合料用细集料质量技术要求 表观相对密度坚固性(0.3mm)部分含泥量(小于0.075mm的含量)砂当量亚甲蓝值棱角性 2.5 12% 3% 60% 25g / kg 30s沥青混合料用机制砂规格规格公称粒径水洗法通过各孔筛的质量百分率(%)9.54.752.361.180.60.30.150.075S1603-1008010050802560845025015D、矿粉用于沥青混合料的矿粉应采用石灰岩经磨细得到的矿粉,原石料中的泥土杂质应除净。矿粉应洁净、干燥,能自由地从矿粉仓流出,禁止使用回收矿粉。其质量技术要求见下表。沥青混合料用矿粉质量要求表观相对密度 2.5含水量(%) 1 0.6mm(%)粒度范围 0.15mm(%)0.075mm(%)1009010075100外观无团粒结块亲水系数1塑性指数4加热安定性实测记录(2)沥青混合料的技术要求面层沥青混合料矿料级配原则上依据下表,采用骨架密实型级配,具体应按后续技术指导书试验确定工程级配范围。面层沥青混合料矿料级配及沥青用量 级配类型通过下列筛孔(方孔筛,mm)的质量百分比(%)31.526.519.016.013.29.54.75AC-131009010068853868AC-20100901007892628050722656AC-251009010075906583577645652452通过下列筛孔(方孔筛,mm)的质量百分比(%)沥青用量(%)级配类型2.361.180.60.30.150.075AC-13245015381028720515484.06.0AC-2016441233824517413374.06.0AC-2516421233824517413374.06.0各层沥青混合料应满足所在层位的功能性要求,便于施工,不容易离析,各层应连续施工并连结成为一个整体。沥青混合料采用马歇尔试验配合比设计方法,沥青混合料马歇尔试验技术标准详见公路沥青路面施工技术规范(JTG F40-2004),并有良好的施工性能。沥青面层各层压实度不小于95%对于沥青混合料必须在配合比的基础上,在规定的试验条件下进行车辙试验、浸水马歇尔试验和冻融劈裂试验,并符合下表的技术要求,对不符合要求的沥青混合料,必须更换材料或重新进行配合比试验,调整最佳沥青用量的方法提高沥青混合料的水稳性。沥青混合料车辙试验动稳定度技术要求混合料类型动稳定度(次/mm)普通沥青混合料,不小于1000加0.45%沥青增强纤维,不小于6000沥青混合料水稳定性检验技术要求 混合料类型冻融劈裂试验残留强度比(%)不小于浸水马歇尔试验残留稳定度(%)不小于普通沥青混合料7580改性沥青混合料8085宜对密级配沥青混合料在-10、加载速率50mm/min的条件下进行弯曲试验,综合评价沥青混合料的低温抗裂性,其技术指标见下表的要求。沥青混合料低温弯曲试验破坏应变 混合料类型低温弯曲试验破坏应变()普通沥青混合料,不小于2000改性沥青混合料,不小于2500宜利用轮碾机成型的车辙试验试件,脱模架起进行渗水试验,并符合下表的要求沥青混合料试件渗水系数(ml/min)技术要求 级配类型渗水系数要求(ml/min)试验方法密级配沥青混凝土 不大于120SMA混合料 不大于80 T 0730OGFC混合料 不小于实测经设计确定的标准配合比在施工过程中不得随意变更。生产过程中应加强跟踪检测,严格控制进场材料的质量,如遇材料发生变化并经检测沥青混合料的矿料级配、马歇尔技术指标不符要求时,应及时调整配合比,使沥青混合料的质量符合要求并保持相对稳定,必要时重新进行配合比设计。为提高沥青的面层的抗折能力,增强面层的高温抗车辙能力,机动
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 工业仪器设备4Q验证流程及案例
- 电子商务企业会计核算制度细则
- 高校在线课程作业布置与批改技巧
- 城市环境景观水电安装施工方案
- 大学生学期平时成绩考核细则解析
- 职业健康安全法律法规合规性指南
- 高考生物实验题目汇编及解题技巧
- 初中物理光的反射教学设计方案
- 项目管理实战技巧与案例解析
- 初中语文议论文教学方法与答题技巧
- 24年10月自考13003数据结构与算法试题及答案
- 2024年建筑艺术之美:桥梁建筑的魅力
- 医院培训课件:《成人住院患者静脉血栓栓塞症的预防护理》
- 冷库建设 投标方案(技术方案)
- 无人机技术探索
- 2024-2025学年六年级上册数学人教版期中考试试题(1-4单元)(含答案)
- 拍七令游戏课件
- 国家开放大学《Web开发基础》形考任务实验1-5参考答案
- GB/T 44329-2024混合气体的制备称量法
- 《进一步规范管理燃煤自备电厂工作方案》发改体改〔2021〕1624号
- 4039话机简单使用说明
评论
0/150
提交评论