




已阅读5页,还剩18页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library solid di spread row engineering increased geological disaster hidden points governance efforts solid advance small basin torrent disaster governance efforts from essentially solution basin sex and regional flood control drainage capacity insufficient of problem Vigorously implement the piers algae and other water sources protection and promoting rural drinking water safety projects setting up water pricing reform and environmental protection mechanism guiding water depth Further soil pollution and repair strengthen agricultural non point source pollution prevention mountain water forests fields lakes various elements mutual long Four manage to tighten control to play three to split battle Xia Baolong Secretary of provincial party Committee stressed that while the three to split operation time is over three years but three to split must continue to catch on and resolve a split cannot be changed All localities and departments to the village and no unauthorised created 华夏幸福城润园一期工程 安全监理管理制度安全监理管理制度 编制 审批 编号 SY ZC XFC 01 ZD 2011 分发号 XFC 01 XFC 02 河北三元建设监理有限责任公司 2011 年 4 月 videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of石家庄裕华万达广场石家庄裕华万达广场 河北三元建设监理有限责任公司河北三元建设监理有限责任公司 地址 河北地址 河北 石家庄体育南大街石家庄体育南大街 221 号号 邮编 邮编 电话 传真 电话 传真 0311 treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library solid di spread row engineering increased geological disaster hidden points governance efforts solid advance small basin torrent disaster governance efforts from essentially solution basin sex and regional flood control drainage capacity insufficient of problem Vigorously implement the piers algae and other water sources protection and promoting rural drinking water safety projects setting up water pricing reform and environmental protection mechanism guiding water depth Further soil pollution and repair strengthen agricultural non point source pollution prevention mountain water forests fields lakes various elements mutual long Four manage to tighten control to play three to split battle Xia Baolong Secretary of provincial party Committee stressed that while the three to split operation time is over three years but three to split must continue to catch on and resolve a split cannot be changed All localities and departments to the village and no unauthorised created1 一 一 执行法律法规与标准监理制度执行法律法规与标准监理制度 二 二 教育培训制度教育培训制度 三 三 安全监理台帐制度安全监理台帐制度 四 四 审查核验制度审查核验制度 五 五 检查验收制度检查验收制度 六 六 督促整改制度督促整改制度 七 七 安全技术措施审查备案制度安全技术措施审查备案制度 八 八 专项施工方案审查备案制度专项施工方案审查备案制度 九 九 安全隐患处理制度安全隐患处理制度 十 十 重大安全生产隐患报告制度重大安全生产隐患报告制度 十一 十一 工作会议制度工作会议制度 十二 十二 监理安全资料管理监理安全资料管理 十三 十三 资料管理制度资料管理制度 十四 十四 工作奖励制度工作奖励制度 十五 十五 工作月报制度工作月报制度 十六 十六 生产安全事故上报制度生产安全事故上报制度 十七 十七 项目监理机构办公管理制度项目监理机构办公管理制度 十八 十八 安全目标监督制度安全目标监督制度 十九 十九 工程安全技术监理制度工程安全技术监理制度 二十 二十 监理组安全活动制度监理组安全活动制度 二十一 二十一 防火安全管理制度防火安全管理制度 videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library solid di spread row engineering increased geological disaster hidden points governance efforts solid advance small basin torrent disaster governance efforts from essentially solution basin sex and regional flood control drainage capacity insufficient of problem Vigorously implement the piers algae and other water sources protection and promoting rural drinking water safety projects setting up water pricing reform and environmental protection mechanism guiding water depth Further soil pollution and repair strengthen agricultural non point source pollution prevention mountain water forests fiel
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年北京市外来人口租赁合同管理与服务办法
- 2025年《合同法》讲座
- 2025财产委托管理合同书新范文
- 2025年动产质押借款合同
- 石化过程强化学习优化-洞察及研究
- 出入境人员安全培训课件
- 2025担保抵押合同范本
- 2025合同违约责任规定协议范本
- 2025咨询合同协议方案技术支持合同
- 冲压作业安全培训心得
- 2025年广西公需科目答案01
- 养老机构殡葬协议书
- 十三五重点项目-日间照料中心项目资金申请报告
- (高清版)DG∕TJ 08-2087-2019 混凝土模卡砌块应用技术标准
- 危化品企业三级安全教育体系
- 2025年4月版安全环境职业健康法律法规标准文件清单
- 运营服务合同协议
- 2025年乡村医生考试题库:基础医学知识及公共卫生试题卷
- 消防队伍管理授课
- 管理的四个要素
- 2025年银行反洗钱知识竞赛题库和答案(280题)
评论
0/150
提交评论