编制说明一、目的根据公司管理程序要求,为确保本专业严格按照合同及有关规范、规程的要求,加强施工过程的质量管理,保证施工检验处于受控状态,特编制锅炉安装施工质量验收范围划分表。本工程锅炉专业共9个单位工程。二、编制依据1. Technical specification for construction of electric power construction: Boiler Unit ( The electric power industry standard of the PRC DL 5190.2-2012)1、电力建设施工技术规范:锅炉机组(中华人民共和国电力行业标准DL 5190.2-2012)2. Technical specification for construction of electric power construction: Pipe and System ( The electric power industry standard of the PRC DL 5190.5-2012)2、电力建设施工技术规范:管道及系统(中华人民共和国电力行业标准DL 5190.5-2012)3. Code for construction quality acceptance and evaluation of electric power construct: Boiler Unit ( The electric power industry standard of the PRC DL 5190.2-2012)3、电力建设施工质量验收及评价规程:锅炉机组(中华人民共和国电力行业标准DL 5210.2-2009)4. Code for construction quality acceptance and evaluation of electric power construct: Pipe and System ( The electric power industry standard of the PRC DL 5190.5-2012)4、电力建设施工质量验收及评价规程:管道及系统(中华人民共和国电力行业标准DL 5210.5-2009)5、设计院提供的资料文件6、各设备厂家提供的资料文件三、有关说明1、本“施工质量验收范围划分表”所列检验项目与工程实际检验项目不符的部分已全部进行增加或删减。2、工程施工质量应由“施工质量验收范围划分表”规定的验收单位进行验收。3、施工项目必须施工完毕方可进行质量验收。对施工质量进行检查、验收,施工单位应自检合格,且自检记录齐全后,方可报相应验收单位进行质量验收。如果出现“规程”与制造厂要求不一致的情况,以制造厂的要求为准。4、检验批项目验收合格方可对分项工程进行验收;分项工程验收合格方可对分部工程进行验收;分部工程验收合格方可对单位工程进行验收。5、隐蔽工程在隐蔽前24小时由施工单位通知承包商及有关单位进行见证验收,并应完成验收记录及签证。6、质量控制点包括R、W、H三个点,其中R点为记录点、W点为现场见证点、H点为停工待检点。见证单位如未按承建单位的通知时间到现场检验时,W点自动转为R点。W点为见证点,该点经过某一验收级别单位验收合格后,书面或以约定的方式通知设置该W点的上一级别验收单位进行见证,当该设置单位未按通知要求的时间到达现场,又没有其他说明时,可继续进行下道工序的施工。H点为停工待检点,该点某一验收级别单位验收合格后,提前24小时书面通知设置该H点的上一级别验收单位进行检查。当该设置单位未按通知要求的时间到达现场时,则施工单位必须等待而停止下道工序活动,直到该设置单位有相关的说明为止。工程编号Project No.工 程 名 称Project Name性 质Properties验收单位Acceptance Unit控制点Control Point单 位 工 程Unit Project分 部 工 程Partitioned Project分 项 工 程Item Project检 验 批Inspection Lot分 包 单 位SubcontractorSEPCOIIContractor业 主OwnerRWH01Boiler installation锅炉本体本体安装01Boiler steel structure installation钢架安装01Recheck the boiler foundation, boiler steel structure and base plate installation锅炉基础划线01Recheck the boiler foundation, boiler steel structure and base plate installation锅炉基础划线04Boiler steel structure installation钢架安装01The first floor steel structure column, beam, bracing checking第一层钢架立柱/梁/支撑检查02The first floor steel structure high strength bolt connection第一层钢架高强螺栓连接03The first floor steel structure column installation第一层钢架立柱安装04The first floor steel structure beam installation第一层钢架横梁安装05The second floor steel structure column, beam, bracing checking第二层钢架立柱/梁/支撑检查06The second floor steel structure high strength bolt connection第二层钢架高强螺栓连接07The second floor steel structure column installation第二层钢架立柱安装08The second floor steel structure beam installation第二层钢架横梁安装01010409The third floor steel structure column, beam, bracing checking第三层钢架立柱/梁/支撑检查10The third floor steel structure high strength bolt connection第三层钢架高强螺栓连接11The third floor steel structure column installation第三层钢架立柱安装12The third floor steel structure beam installation第三层钢架横梁安装13The fourth floor steel structure column, beam, bracing checking第四层钢架立柱/梁/支撑检查14The fourth floor steel structure high strength bolt connection第四层钢架高强螺栓连接15The fourth floor steel structure column installation第四层钢架立柱安装16The fourth floor steel structure beam installation第四层钢架横梁安装17The fifth floor steel structure column, beam, bracing checking第五层钢架立柱/梁/支撑检查18The fifth floor steel structure high strength bolt connection第五层钢架高强螺栓连接19The fifth floor steel structure column installation第五层钢架立柱安装20The fifth floor steel structure beam installation第五层钢架横梁安装010105Roof plate beam installation顶板梁安装主控01Roof plate beam checking板梁检查02Roof plate beam installation顶板梁安装主控03High strength bolt connection高强螺栓连接主控06Steel structure overall recheck钢架整体复查主控01Steel structure overall recheck钢架复查主控07Steel structure base plate secondary grouting柱脚二次灌浆主控01Steel structure base plate secondary grouting柱脚二次灌浆02Platform ladder assembling and installation平台、梯子组合安装01Platform ladder assembling and installation平台梯子组合安装01Lower platform ladder assembling and installation下部平台梯子组合安装02Middle platform ladder assembling and installation中部平台梯子组合安装03Upper platform ladder assembling and installation上部平台梯子组合安装Air preheater installation管箱式空预器安装01Air preheater assembling管箱式空预器组合01020101Air preheater tube box checking空预器管箱设备检查02Air preheater tube box assembling空预器管箱组合02Air preheater erection管箱式空预器安装01Air preheater steel support settingout空预器支撑钢架检查划线02Air preheater erection管箱式空预器安装03Air preheater unicom box erection空预器转折角(连通箱)安装01Air preheater unicom box checking空预器转折角(连通箱)设备检查02Air preheater expansion joints erection空预器转折角(连通箱)及伸缩节安装Metal cover sheet and sealing components erection锅炉护板、密封件及门孔安装01Cover sheet erection护板安装01Cover sheet erection护板安装02Water sealing plate erection水封装置安装主控01Water sealing plate erection水封装置安装主控03Furnace seal cover shell installation炉顶密封罩壳及局部密封件安装主控01Furnace seal cover shell installation炉顶密封罩壳及局部密封件安装主控04Boiler proper manhole installation炉本体门孔安装主控01Boiler proper manhole installation炉本体门孔安装主控06Slag hopper and ash hopper assembling渣井、灰斗组合安装01Slag hopper installation渣井安装01Slag hopper installation渣井安装02Ash hopper assembling灰斗组合01Ash hopper assembling灰斗组合03Ash hopper installation灰斗安装主控01Ash hopper installation灰斗安装主控07Coal burner installation燃烧设备安装02Coal burner installation直流式燃烧器安装01Coal burner checking直流式燃烧器设备检查02Coal burner installation直流式燃烧器安装主控04Few oil burner installation微油点火装置安装01Few oil burner checking微油点火装置设备检查02Few oil burner installation微油点火装置安装主控08Steam drum installation汽包安装主控01Steam drum settingout check汽包检查、划线主控01Steam drum settingout check汽包检查、划线主控02Steam drum installation汽包安装主控01Steam drum installation汽包安装主控03Steam drum interior equipment installation汽包内部装置安装主控01Steam drum interior equipment checking汽包内部装置检查主控02Steam drum interior equipment installation汽包内部装置安装主控10Heating surface installation水冷壁安装主控01Heating surface assembling水冷壁组合01Heating surface checking受热面设备检查02Header installation联箱安装主控03Water wall assembling水冷壁组合主控02Water wall installation水冷壁组件及单片安装01Heating surface checking受热面设备检查02Header installation联箱安装主控03Water wall installation水冷壁安装主控07Buckstay installation刚性梁安装01Buckstay checking设备检查02Buckstay installation刚性梁安装主控08Downcomer installation下降管安装01Downcomer checking设备检查02Header installation联箱安装主控03Downcomer installation下降管安装主控09Evaporation piping installation蒸发管安装01Equipment checking设备检查02Evaporation piping installation蒸发管安装10Hanging device installation吊挂装置安装01Equipment checking设备检查02Hanging device installation吊装装置安装主控11Sh installation过热器安装02Final superheater installation高温过热器安装01Equipment checking受热面设备检查02Header installation联箱安装主控03Final superheater installation高温过热器安装主控03Primary superheater installation低温过热器管排组合01Equipment checking受热面设备检查02Primary superheater assembling低温过热器管排组合主控04Primary superheater installation低温过热器安装01Equipment checking受热面设备检查02Header installation联箱安装主控03Primary superheater installation低温过热器安装主控05Platen superheater installation屏式过热器安装01Equipment checking受热面设备检查02Header installation联箱安装主控03Platen superheater installation屏式过热器安装主控06Wall superheater installation包墙过热器组合01Equipment checking受热面设备检查02Header installation联箱安装主控03Wall superheater assembling包墙过热器组合主控07Wall superheater installation包墙过热器组件及单片安装01Equipment checking受热面设备检查02Header installation联箱安装主控03Wall superheater installation包墙过热器组件及单片安装主控08Roof superheater installation顶棚过热器安装01Equipment checking受热设备检查02Header installation联箱安装主控03Roof superheater installation顶棚过热器安装主控09Buckstay installation刚性梁安装01Equipment installation设备检查02Buckstay installation刚性梁安装主控10Desuperheator installation减温器安装01Desuperheator installation减温器安装11Sh steam contact piping installation过热蒸汽联络管安装01Equipment checking设备检查02Sh steam contact piping installation过热蒸汽联络管安装14Hanging device installation吊挂装置安装01Equipment checking设备检查02Hanging device installation吊装装置安装主控13ECO installation省煤器组合安装01ECO assembling省煤器组合01Equipment checking受热面设备检查02ECO assembling省煤器组合主控02ECO installation省煤器组件及单片安装01Equipment checking受热面设备检查02Header installation联箱安装主控03ECO installation省煤器组件及单片安装主控03Hanging piping assembling吊挂管组合01Equipment checking受热面设备检查02Hanging piping assembling吊挂管组合04Hanging piping assembling吊挂管组件及单根管安装01Equipment checking受热面设备检查02Header installation联箱安装主控03Hanging installation吊挂管组件及单根管安装主控05Feed water contact piping installation给水联络管安装01Equipment checking设备检查02Feed water contact piping installation给水联络管安装06Boiler recirculation piping installation锅炉再循环管安装01Boiler recirculation piping installation锅炉再循环管安装07Hanging device installation吊挂装置安装01Equipment checking设备检查02Hanging device installation吊装装置安装主控14Boiler integrated hydraulic test锅炉整体水压试验主控01Boiler integrated hydraulic test锅炉整体水压试验主控01Boiler integrated hydraulic test锅炉整体水压试验主控15Water feed piping installation给水管道安装01Water feed piping installation给水管安装01Water feed piping installation给水管安装02Attemperating water piping installation减温水管道安装01Attemperating water piping installation减温水管道安装16Blowdown flash piping and euipment installation排污管道及设备安装01Termittent blowdown flash piping installation定期排污管道安装01Termittent blowdown flash piping installation定期排污管道安装02Continuous blowdown flash piping installation连续排污管道安装01Continuous blowdown flash piping installation连续排污管道安装03Intermittent blowdown flash tank installation定期排污扩容器安装01Intermittent blowdown flash tank installation定期排污扩容器安装04Continuous blowdown flash tank installation连续排污扩容器安装01Continuous blowdown flash tank installation连续排污扩容器安装17Water feeding, discharge, air discharge piping installation上水、放水、放空气管道安装01Emergency water drainage installation事故放水管道安装01Emergency water drainage installation事故放水管道安装02HP draining piping installation高压疏水管道安装01HP draining piping installation高压疏水管道安装03LP draining piping installation低压疏水管道安装01LP draining piping installation低压疏水管道安装04Air discharge piping installation放空气管道安装01Air discharge piping installation放空气管道安装18Steam discharge piping installation排汽管道安装01Safety valve steam discharge piping installation安全阀排汽管道安装(含消声器)01Safety valve steam discharge piping installation安全阀排汽管道安装(含消声器)02Start steam discharge piping installation点火排汽管道安装(含消声器)01Start steam discharge piping installation点火排汽管道安装(含消声器)03Ash blowing steam discharge piping installation吹灰蒸汽排汽管道安装01Ash blowing steam discharge piping installation吹灰蒸汽排汽管道安装04Flash vessal steam charge installation扩容器排汽管道安装01Flash vessal steam charge installation扩容器排汽管道安装19Soot blowing equipment installation吹灰装置安装01Soot blower installation吹灰器安装01Soot blower installation吹灰器安装02Sootblowing steam piping installation吹灰蒸汽管道安装01Sootblowing steam piping installation吹灰蒸汽管道安装20Sampling piping and equipment installation取样管道及设备安装01Sampling piping installation取样管道安装01Sampling piping installation取样管道安装21Chemical dosing piping and equipment installation加药管道及设备安装01Chemical dosing piping installation加药管道安装01Chemical dosing piping installation加药管道安装22Others piping installation锅炉杂项管道安装02Heating piping near boiler installation邻炉加热管道安装01Heating piping near boiler installation邻炉加热管道安装03Fuel oil steam piping installation燃油蒸汽管道安装01Fuel oil steam piping installation燃油蒸汽管道安装04Coal mill steam smothering piping installation磨煤机消防蒸汽管道安装01Coal mill steam smothering piping installation磨煤机消防蒸汽管道安装05Industrial water piping installation锅炉工业水管道安装01Industrial water piping installation锅炉工业水管道安装07Preservation piping installation停炉保护系统管道安装01Preservation piping installation停炉保护系统管道安装10Flame detection cooling piping installation火检冷却风管道安装01Flame detection cooling piping installation火检冷却风管道安装23Ash and slag handing piping installation除灰、渣系统管道及设备安装01Ash and slag handing piping installation除灰系统设备安装01Ash and slag handing piping installation除灰系统设备安装02Slag room and others equipment installation锅炉渣仓及附属设备安装01Slag room and others equipment installation锅炉渣仓及附属设备安装04Ash handing piping installation除灰管道安装01Ash handing piping installation除灰管道安装05Ash handin
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年乐山职业技术学院单招职业技能考试必刷测试卷新版
- 2026年安徽广播影视职业技术学院单招职业倾向性测试必刷测试卷必考题
- 2026年湖北水利水电职业技术学院单招职业适应性测试必刷测试卷附答案
- 2026年保定幼儿师范高等专科学校单招职业技能考试题库附答案
- 2026年泉州工程职业技术学院单招职业倾向性测试题库必考题
- 2026年桐城师范高等专科学校单招职业技能测试题库新版
- 2026年成都外国语学院单招职业适应性测试必刷测试卷新版
- 2026年九州职业技术学院单招职业技能测试必刷测试卷附答案
- 2026年上海健康医学院单招综合素质考试题库新版
- 2026年昭通卫生职业学院单招职业技能考试题库及答案1套
- 2025年山西省公务员录用考试《行测》真题及答案
- 第六单元第二节化石燃料的利用说课稿-2024-2025学年九年级化学鲁教版上册
- 2025年事业单位招聘考试综合类专业知识试卷:人工智能产业政策知识篇
- 烟草局安全员培训课件
- 有特殊本领的鸟类课件
- 慈溪拆除施工方案
- 房产资产管理培训课件
- 国家基本药物制度解读
- 公交安全隐患培训课件
- 轨电车试验线工程项目可行性研究报告
- 2025年“筑梦航天”青少年航天知识大赛题库(附答案)
评论
0/150
提交评论