已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1 电气施工图设计说明电气施工图设计说明 一 建筑概况 本建筑为框架结构 功能分为 生产区 管理区和仓库区 生产区为二层 管理区为 三层 仓库区为一层 仓库区内的装卸区为三层 层高 生产区 一层 5 5M 二层 6 25M 管理区 4 0M 4 25M 有吊顶及架空地板 仓库区 11 75M 总建筑面积 9129M2 Design Specifications for Electric Constructional Drawings I Building profile This building is of frame structure the functions of which can be divided into producing area managerial area and warehouse area The producing area is two story three stories for the managerial area and one story for the warehouse area There is a three story loading and unloading area inside the warehouse area Story height producing area one story 5 5 meters second story 6 25 meters managerial area 4 0 meters and 4 25 meters with suspended ceiling and aerial floor board warehouse 11 75 meters total constructional area 9129 square meters 二 设计依据 供配电系统设计规范 GB50052 95 工业与民用电力装置的接地设计规范 GBJ65 83 建筑设计防火规范 GBJ16 87 2001 低压配电设计规范 GB50054 95 建筑物防雷设计规范 GB50057 94 II Basis for Design Design Specifications for Power Supply and Distribution System GB50052 95 Design Specifications for Earthing for Industrial and Civil Power Installations GBJ65 83 Specifications for Fire Control in Architectural Design GBJ16 87 2001 Design Specifications for Low Voltage Distribution GB50054 95 Lightning Protection Design Specifications for Buildings GB50057 94 三 设计范围 本工程设计范围包括 厂区总图界区内建筑物的低压供配电 照明 防雷及接地设计 III Scope of Design Design for this project includes low voltage power supply low voltage power distribution lighting lightning protection and earthing design for buildings inside the overall factory area 四 负荷等级 本工程为五金加工厂 一班工作制 用电设备主要为机加工 空调 照明 及办公用电 根据 属于三级负荷 2 IV Load Grade This project is a hardware processing plant Its working system is one shift Equipments using power mainly are machine work air conditioners lighting and office power utility It belongs to a Grade III power load according to and 五 电源状况 本工程的变电所设置在界区内的西北侧 其中包括 10KV 分界室及变配电 室 低压配电室以放射供电方式向建筑物内各配电柜 配电箱供电 V Power Supply Situation transformer station of this project is set at the northwest side of the factory area of which there is a 10KV separation room and a power distribution and transformer room The low voltage distribution room will supply power to all distribution cabinets and distribution boxes inside the building in the form of radiation 六 供电方式 从变电所引出的电缆沿室外电缆沟内电缆支架直接引入建筑物内各配电箱 配电柜 从建筑物内各配电箱引出的线路分别采用电缆或导线沿电缆桥架或钢管敷设 道路照明电 缆为铠装电缆直埋敷设 VI Modes for Power Supply Cables introduced from the transformer station will be stretched directly to all distribution cabinets and distribution boxes inside the building along the cable bracket in the cable trench outdoors Lines resulted from all distribution boxes inside the building shall respectively adopt cables or conducting wires that are arranged along the cable viaducts or steel pipes Cables for road lighting are armored cables directly buried 七 防雷与与接地 按 GB50057 94 本工程的主建筑物为第三类防雷建筑物 为防直击雷 在建筑物屋 面装设避雷网 屋面避雷网格不大于 20MX20M 避雷网通过引下线接至防雷接地装置 金属屋面直接接地 引下线利用柱内主筋 并在地面附近装设检测卡 VII Lightning Protection and Earthing According to provisions of GB50057 94 main building of this project is a Grade III lightning proof building In order to avoid direct lightning a lightning proof network is set on the roofing of the building The mesh of the lightning proof network shall be no larger than 20mX20m and this network shall be connected to lightning proof earthing device via down lead Metal roofing shall be earthed and the down lead shall utilize main reinforcement inside post Inspection card shall also be installed around on the surface 为防雷电感应 在建筑物内设备 管道 构件等金属物应就近接至防雷接地装置 建 筑物内的电子设备按规范要求设至雷电磁脉冲保护装置 安装高度低于 2 4 米的灯具 其 中包括泵房灯具 线路加 PE 线 In order to avoid lightning induction lightning proof or earthing devices shall be installed 3 near to such metals as equipments pipelines and structural members inside the building All electronic equipments inside the building shall be in accordance with regulations to arrange lightning magnetism pulse protection devices PE Line shall be added for lines of lighting fittings include lighting fittings inside pump room whose height for installation is less than 2 4 meters 本工程低压系统为变压器中性点直接接地 采用 TN S 系统 变压器中性点接地 电气 设备外壳接地 防静电接地及防雷接地共用一个接地系统 并做等电位连接 其总接地电 阻值要求不大于 1 欧姆 利用建筑物地梁内主筋做接地体 做重复接地 接地电阻 1 欧姆 并做总等电位联接 总等电位联接详见 02D501 2 11 15 页 The low voltage system of this project is direct earthing at the neutral point of transformer and adopts the TN S system The neutral point of transformer electronic equipment outer covering static electricity and lightning protection shall use one earthing system jointly and be connected isopotentially The overall earthing resistance shall be no more than 1 ohm Main reinforcement inside ground beam of the building is used to earthing Iterative earthing resistance is no more than 1 ohm Furthermore it shall conduct overall equipotential connection and the specific equipotential connection refers to 02D501 2 in page 11 15 八 电力设计 8 1 配电系统 本工程全部为低压用电负荷 变电所低压配电室以放射供电方式向建筑物内配电柜 配电箱供电 再从各配电柜 配电箱引至各用电设备 照明负荷中的应急照明由灯具中蓄 电池供电 VIII Electric Design 8 1 Power Distribution System This project is low voltage load completely The low voltage distribution room will supply power to all distribution cabinets and distribution boxes inside the building in the form of radiation and then it is introduced to all power consumed equipments from each distribution cabinets and distribution boxes Emergency lighting for lighting load shall be supplied by storage batteries inside lighting fittings 8 2 环境特征和设备选择及安装 本工程建筑物内主要分为办公区 机械加工区 仓库区 餐厅及展示区 均为正常 环境 各区域内电气设备的选择及安装方式满足使用场所的环境要求 8 2 Environmental Characteristics and Equipments Selection and Installation The building of this project can be mainly divided into office area machinery processing area warehouse area dining hall and exhibition area all of which are in normal environment The selection and installation modes for electronic equipments of each area shall be in accordance with the environmental requirements of location occupied 4 8 3 导线 电缆选择及敷设方式 本工程导线采用 BV 500V 穿钢管敷设 电缆采用 YJV 1000V 照明和动力干线沿电揽桥 架引至各配电柜 配电箱 照明 插座支线如无特殊标注一律选 BV 2 5 mm2导线 照明 支线 管理区穿钢管暗敷于吊顶内 仓库区和生产区穿钢管沿楼板沿墙明敷 插座线路 管理区穿钢管暗敷于架空地板内 仓库区和生产区穿钢管沿楼板沿墙明敷 8 3 Selection and Arrangement Modes for Conductive lines and Cables Conductive lines for this project all adopt BV 500V Line through steel pipes to pave Cables adopt YJV 1000V Main lines for lighting and dynamic force shall be stretch to each distribution cabinet and distribution box via the cable bracket Except for special mark any lighting and socket extensions shall adopt the conductive line of BV 2 5 mm2 Lighting extensions through the steel pipes inside the managerial area shall be concealed inside the suspended ceiling Lighting extensions through the steel pipes inside the warehouse area and the producing area will be paved obviously along walls and floor slabs Socket extensions through the steel pipes inside the managerial area shall be implicitly paved in aerial floors Socket extensions through the steel pipes inside the warehouse area and the producing area will be paved obviously along walls and floor slabs 8 4本工程应用二次加热设备装于吊顶内 导线暗敷于吊顶内 8 5至屋顶设备配电柜内末级加隔离开关 8 6所有用电设备 15KW 的 采用降压起动方式 8 4 This project shall adopt secondary heating devices to be hanged on the suspended ceiling and their conductive lines shall be concealed inside the suspended ceiling 8 5 Switches are added for separation at the extreme end inside the distribution cabinet on the riffing 8 6 All equipments that utilize power shall be larger than 15KW and shall adopt the reduced voltage starting mode 九 照明系统及灯具 正常照明由普通电源供电 应急照明由灯具内蓄电池供电 应急照明主要设置在各通 道口 疏散楼梯及重要的操作岗位 应急照明的照度为正常照度的 5 应急照明时间 90min 正常照明灯具主要采用荧光灯 在仓库采用金属卤化物灯 所有照明灯具均采用 手动控制 荧光灯及金属卤化物灯 COS 0 85 IX Illuminating system and light fixtures Normal illumination is powered by the ordinary current resource and the batteries inside the light fixtures power the emergent one The emergent illuminations are mainly set on places such as each passage entrance dispersal stairway and some important executive posts The emergent illumination intensity should be the 5 of the normal one and the time of it should be 90min The light fixtures of the normal illumination are radically fluorescent lamps and there are metal halide lamps instead when in the stores All the illumination light fixtures should be hand controlled The COS of the fluorescent 5 lamps and the metal halide lamps should be equal to 0 85 十 电信 10 1 主要设计标准 工业企业通信设计规范 GBJ42 81 建筑与建筑群综合布线系统工程设计规范 GB T50311 2000 火灾自动报警系统设计规范 GB50116 98 X Telecommunication 10 1 Primary design standards Telecommunication Design Standards for Industry Enterprises GBJ42 81 Engineering Design Standards for Integrated Routing System of Architectures and Architectural Complexes GB T50311 2000 Design Standards for Conflagration Automatic Alarm System GB50116 98 10 2 设计范围 本工程设计范围包括厂区总图界区内的电话系统 数据通讯系统 对讲系统 及 火灾报警及联动系统 10 3 电话系统 本项目需要 49 门电话 考虑今后电话机容量的扩充 一台 60 门的交换机 180 对的配线架将安装在通讯设备室 中继线为双向传输方式 中继线引自界区东北角的 市局电话电缆 交换机由交流 220V 供电 同时随机附带可维持 4 小时的蓄电池 交 换机的接地端子与建筑物的接地系统连接 接地电阻小于 1 欧姆 10 2 Design Range The design range of this engineering includes the telephone system digital telecommunication system interphone system and conflagration automatic alarm and linked system inside the bound of the form in the general chart 10 3 Telephone System This program needs 49 telephones and a 60 line exchanger when considering the future expand of the capacity of the telephone sets A 180 pairs of distributing frames should be fixed in the telecommunication equipment room The connecting line should be bi directional transmitting and is led in from the cable of the telecommunication station on the north east of the form The exchanger is powered with a 220V alternating current and is fixed with a battery to supply 4 hours emergent power The earth end of the exchanger is connected with the earth system of the architectures and the electrical resistance should be less than 1 Ohm 10 4 综合布线系统 综合布线系统由设在一层办公区电气室的主配线架 设在西区一层的分配线架 光缆及五类屏蔽电缆组成 主配线架与分配线架之间通过光缆连接 配线系统由 5 类 线及电话 数据 电源组合插座组成 在办公室安装地面组合插座 所有配线 干线 沿电缆线槽 支线穿金属软管暗敷于架空地板内 装卸区办公室数据 电话插座 电 6 源插座均暗装于墙体内 导线穿钢管暗敷于地面内及墙体内 10 5 紧急呼叫系统 本系统由按钮 信号灯组成 在残疾人卫生间内安装一个报警按钮 按钮按下时 门外的报警灯点亮 10 4 Integrated routing system The integrated routing system consists the major distributing frame in the electric room on the first floor office area and the sub distributing frames in the first floor of the western area cables and five sorts of the screening cables The major distributing frame connects the sub ones with cables The distributing system is made up of 5 sorts of cables and the assemble sockets of telephone digits and power Install floor assemble sockets in the office rooms and the distributing cables All the major distributing lines should go along the wire casings and the sub ones should be hidden under the floor boards after passing through some metal soft pipes All the digital and telephone and power sockets in the loading area should be hidden in the walls and the wires are hidden in the walls after passing through some metal soft pipes 10 5 Emergent alarm system This system is consisted by buttons and signal lamps Fix and alarming button on the resting rooms for disables The alarming lamp will light up when he or she presses it 10 6 火灾报警系统 火灾报警系统由火灾报警盘 火灾联动控制盘 火灾手动控制盘 探测器及手动 报警按钮及消防电话系统组成 在以下区域安装自动报警装置 所有办公区 仓库 生产区 通道 通讯设备室 等需要保护的区域 当有火灾信号时 消防联动系统能启动建筑物内的警笛 同时能够自动关闭防火 卷帘门 同时能够启动消防泵和喷淋泵 切断非消防电源 消防泵 喷淋泵亦可通过手动盘控制 所有配线穿钢管敷设 报警盘及控制盘供 电采用 AC220V 并配有 4 小时的备用电池 火警盘的接地系统与建筑物的接地系统共用 接地电阻小于 1 欧姆 门卫安装一部直拨电话 当有火灾时 直接与附近消防局联系 10 6 Conflagration Alarm System The conflagration alarm system consists conflagration alarm disk conflagration linked control panel conflagration hand control panel detectors and hand control alarm buttons and fire controlling telephone system Fix auto alarm sets on these places the needing protection places in all the office rooms stores producing areas passages telecommunication equipments rooms and so on At the time of the conflagration signal showing the conflagra
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- (2026年)劳动保障协理员三级鉴定试题附答案
- 水库大坝土方填筑碾压施工方案及技术措施
- 2026机修钳工证考试题库及模拟考试答案(高级)
- SBS改性沥青防水卷材防水工程施工方案
- 中压蒸汽管道吹扫施工方案
- 市政桥梁防撞护栏安装质量措施
- 复合地板铺设施工方案及技术措施
- ICU病房血液透析管路凝血分级安全生产应急预案演练脚本
- 2026年中职社会福利事业管理(福利基础)下学期期末测试卷(含答案)
- 2026四川科瑞软件有限责任公司招聘商务专员等岗位3人备考题库及参考答案详解【基础题】
- 云南大理西电新源开发有限责任公司招聘笔试题库2026
- GB/T 12957-2026用于水泥混合材的工业废渣活性试验方法
- 2026年人教鄂教版(新教材)小学科学三年级下册期末学情测试卷及答案(2套)
- 2026人教版小学四年级下册语文全单元课文易错考点梳理讲义
- 2026春小学信息技术三年级下册期末练习卷(清华版贵州)附参考答案
- 2026年人教版(新教材)初中信息科技七年级全一册第二学期期末综合测试卷及答案
- 2026内蒙古医药行业市场现状供需分析及投资评估规划分析研究报告
- 中投顾问:2026年中国未来产业深度分析报告
- 《煤矿重大事故隐患判定标准》(2026版)解读
- 2026年高中历史学业水平合格性考试知识点总结(复习必背)
- 2026年7月浙江高中学业水平合格考生物试卷试题(含答案详解)
评论
0/150
提交评论