Cranberry 运营案例分析_第1页
Cranberry 运营案例分析_第2页
Cranberry 运营案例分析_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

National Cranberry Cooperative analysis In 1971, National Cranberry Cooperative (NCC) is facing two main issues. One is that the overtime costs were out of control. Another one is that the trucks and drivers had to wait for a long time to unload the fruit to the receiving plant. There are two suggestions from the firm. Firstly, buy two new dryer. Secondly, convert the dry berry holding bins to Wet-and-dry berry holding bins. Another smaller issue is that the firm paid more to the grower because the mistake of color grading and it was suggested to buy a light meter system. Here, I am going to solve the problem by finding out the bottle neck and explain why we should not by the light meter system.Operation FlowchartThe following charts show the flow of the processes and capacities of each process.Solution for waiting and working overtimeAccording to the policy, the weight of this year will be 10% off. The maximum daily weight is 18,879bbls. As a result, we assume that the maximum of the weight will be 17,500 bbls. The following table shows the capacity required when operate for 8 hours.Total weight(bbls)Total Capa. Require(bbls/h)Wet70%(bbls)Wet Capa. Require(bbls/h)Dry 30%(bbls)Dry Capa. require(bbls/h)17,500 2,188 12,250 1,531 5,250 656 17,000 2,125 11,900 1,488 5,100 638 16,000 2,000 11,200 1,400 4,800 600 15,000 1,875 10,500 1,313 4,500 563 14,000 1,750 9,800 1,225 4,200 525 13,000 1,625 9,100 1,138 3,900 488 It is obviously, the bottle neck of the line is the process of “Dry” for the wet cranberry. Comparing to the required capacity of 1531 bbls/h, the maximum running capacity now is too low, with only 600 bbls/h. Whats more, most of the workers are arranged after dry process. As a result, these workers have to wait the products, which increased the labor cost. If the daily deliver weight is 17,500 bbls, the workers need to work at least 20 hours (12,250/600=20). The lobar wage, $3.75/hour for the dry process is much lower than buying a new dryer, $25,000 and there is only one worker in the dry process. We can arrange that the dry process worker start working at 7AM with the receiving workers. The total working time for the dry process will be 12 hours. Then the max capacity for one hour will be 1020 (12,250/12). The dryer we need would be 1020/(200+150)/2=5.8. We should buy 2 or 3 more dryers depending on the bag shipping rate. We also need to consider the buffer after the dryer. There is still a buffer of bins before the receiving process because the capacity of the dryer is only 1020 now. Eight hours later, the buffer weight will be increase to 4080 bbls wet cranberry. Right now, we only have 3200 bbls bins. We need four more bins. For the shipping station, we do not have enough information about the rate of bag shipping. If the rate is high, we need more workers working in that station. The solution introduce above is basing on the assumption that the truck deliver input is stable. According to the record in minutes, the input is not stable. Right now, we need to make sure that the dryer line will not stop. As a result, we should have enough wet cranberry in the buffer holding bins. We can build up rule that, from 7AM to 8AM, we only accept the wet cranberry. Whats more, a queuing system can help the growers arrange the arriving time and the firm can control the balance of delivery for each hour.Color grading problemWe should not buy the light meter system for the color grading, which not only need $10,000 cost but also need to hire full skilled operator. The reason is that we should consider the whole profit of the share holders. The money of color grading mistake was paid to the growers, who are the owner of the firm. The total sum of the profit is unchanged. If we buy the light meter system, the total sum of the profit will be decreased. The solution should be discussing with the growers and make agreement of the rate determination. ConclusionIn sum up, we should do the following works:l Buy 2 or 3 more dryers according to the bag shipping rate.l We need four more wet berry holding bins (convert from dry bins).l Set up the buffer after the dryer.l The worker of “Destone, Dechaff and Dry” needs to work from 7 AM to 7 PM in

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论