




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
越南福和闸堰项目植树施工方案中国水利水电建设集团国际工程有限公司越南福和闸堰项目部二一一年九月十五日1、概述及主要工程量越南福和闸堰项目植树面积49.27公顷。分布于左岸进场道路旁边,业主管理房周围,和土坝下游区域。2、施工工艺流程及主要施工方法施工工艺流程:表(层)面处理测量定位挖种植穴树苗检查植树养护。2.1 表(层)面处理:需要植树的部位用推土机大致推平,铲除表面的杂草,灌木等影响树木生长的杂物。2.2定点放样测量人员进行定点的放样,严格按照一公顷面积植树440棵放样(即植树间距4.77米),测量后做明显标记。2.3挖种植穴:种植穴直径60cm,深度为60cm,要求坑壁光滑,上下面口径基本一致。2.4树苗检查树干挺直,没有明显弯曲,无蛀干害虫和未愈合的机械损伤;树冠丰满,枝条分布均匀、无严重病虫危害,树叶正常;根系发育良好、无严重病虫危害;土球大小为苗木胸径的10倍以上。2.5植树 2.5.1种植的质量标准:种植的苗木品种为景观树柚树,苗木的本身与地面垂直,没有倾斜;严格按照测量定点种植,横平竖直,树木应在一条直线上;树苗高度为1.5米左右,相邻两株高差不超过30cm;种植深浅与原土痕持平;保持树苗土球完好,包装物应取出。 2.5.2种植的程序和方法:树木入穴后,土球放稳,树干直立,拆除并取出包装物;种植后在树木四周筑成高510cm的灌水土堰,方便浇水;种植后需要支撑的树木,用树枝或者竹竿支撑牢固,使树木保持直立;新植树木24小时内浇第一遍水,三日内浇第二遍水,十日内浇上第三遍水,三遍水后转入后期养护;每次浇水后均整堰、堵漏、培土、扶直树干,第三遍水后封堰。2.6养护:新植树苗完成后进行养护,主要项目包括:浇水、防治病虫、补栽未成活树苗、直至交付验收。3、施工设备及人员配置3.1施工设备序号机械设备名称规格型号单位数量备 注1自卸汽车10t台12推土机SD23台13水泵2寸台54全站仪PENTAX台1R -322NX5水桶/只若干6锄头/把若干7铁锨/把若干3.2主要劳动力配置 主要劳动力配置表序号工种数量(人)备注1自卸汽车驾驶员12推土机驾驶员13测量工44普工25合计31Contract 1A Phuoc Hoa HeadworksConstruction Method for Tree PlantingSeptember 15th 20111、General including main construction quantitiesThe tree planting area for the Vietnam Phuoc Hoa headworks occupied 49.27ha mainly distributed at two sides of the left bank access road, the surrounding of the Employers management house and the downstream area of the earth dam. 2、Construction Process and Main MethodConstruction Process:Surface TreatmentSurvey for positioningPit Excavation Checking of the SaplingPlantingMaintenance2.1 Surface Treatment:Level the planting area by bulldozer, and remove the weeds and bushes at the surface which will impact the growing of the trees. 2.2 Setting OutSetting out by the survey staff, strictly keeping the spacing by 4.77m based on 440 trees per ha, and make marks after setting out.2.3 Excavation of the Planting Pits:The planting pits will be excavated with dia 60cm and 60cm of depth, with smooth walls, consistent dimensions for the opening and the bottom part. 2.4 Checking of the SaplingSapling should be straight body, no obvious bending, no harm by the insects or physical surface injury; rich crown with evenly distributed branches without any disease or harmful insects, with healthy leaves; grown root without any disease or harmful insects; soil ball should be 10 times larger than the diameter of the breast branch of the sapling. 2.5 Planting 2.5.1 Quality Standard:The category of the sapling to plant is teak as landscape trees. The sapling itself should be plated vertically toward the land without any slant. The trees should be planted strictly according to the setting out points, ordered in rows and lines with trees on a straight line; the height of the sapling should be about 1.5m and the height difference between saplings should be no larger than 30cm; the planting depth should be leveled with the surrounding earth; the soil ball of the sapling should be finely kept without any packing material. 2.5.2 Planting Process and Method:After saplings are buried in the pit, the soil ball should be steady with upright branch after removal of the packing; earth ridge around the saplings will be built at 5 to 10cm height to make watering easier; for the tree which needs to be supported after planted, using branches or bamboo sticks for enhancing to keep the sapling straight; first watering should be carried out within 24 hrs for the new planted sapling, second watering is within 3 days, third watering is within 10days, last maintenance period will be carried out after the third time watering. Earth ridge around the tree should be done trim, seal water lose, earth backing and upright support during every watering, and earth ridge will be sealed after the third time watering. 2.6 Maintenance:The maintenance works for the new planted saplings will be carried out after they are put into the planting pit. The maintenance works consist of continuing watering, disease and insect control, second time plant for the failure saplings, until delivery.3、Arrangement of the Machines and Labor Force3.1 Construction MachinesNo.Machine ItemSpecificationUnitQtyRemarks1Dump Truck10tSet12BulldozerSD23Set13Pump2寸Set54Total Stat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 天心顺说课稿-2025-2026学年初中音乐粤教版七年级下册-粤教版
- 1感受生活中的法律 第二课时 教学设计-道德与法治六年级上册(部编版)
- 高中化学 专题1 洁净安全的生存环境 第1单元 空气质量的改善说课稿 苏教版选修1001
- 甘肃省民勤县第五中学七年级体育《篮球(原地单手肩上投篮、变方向运球)》说课稿 新人教版
- 2025浙江嘉兴海宁市国土空间规划设计有限公司招聘1人笔试历年参考题库附带答案详解(3卷合一)
- 2024-2025学年高中历史 第一单元 第一次世界大战 第1课 第一次世界大战的爆发教学说课稿2 新人教版选修3
- 2025年影视导演考试题库(附答案)
- 2025年行政执行考试题库及答案
- Unit 1 My classroom Part A大单元(教学设计)-人教PEP版英语四年级上册
- 4 匀变速直线运动的速度与位移的关系说课稿-2025-2026学年高中物理人教版必修1-人教版2004
- 供热管网安全运行管理制度
- 信息技术与人工智能基础PPT完整全套教学课件
- 第四章 §4.1 4.1.1 n次方根与分数指数幂-高中数学人教A版必修一 课件(共41张PPT)
- 奶茶店消防应急预案
- 涂料用溶剂课件
- 外研版英语七上单词表
- DB15T 2916-2023 餐饮服务标识化管理指南
- GB/T 6342-1996泡沫塑料与橡胶线性尺寸的测定
- GB/T 1423-1996贵金属及其合金密度的测试方法
- GB 17790-2008家用和类似用途空调器安装规范
- 《测控技术与仪器专业导论》配套教学课件
评论
0/150
提交评论