




已阅读5页,还剩25页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
IEC 61968 互操作最新进展介绍张子仲2018年1月12日,大纲,整体架构PART 3 最新进展PART 6 最新进展相关的技术标准,NIST 概念模型,Source: NIST Interim Roadmap,2011 互操作计划,IEC TC57 WG14 MEETING #44IEC Technical Committee 57Working Group 14Meeting 44布拉格 5月4日5月6日 2011,2011 WG 14 会议介绍,IEC TC57 WG14 MEETING #45IEC Technical Committee 57Working Group 14Meeting 45亚特兰大 10月10日10月14日 2011,亚特兰大45次会议,亚特兰大45次会议,大纲,整体架构PART 3 最新进展PART 6 最新进展相关的技术标准,WG14技术路线策略,在 WG14 会议上讨论Agree on priority use cases/requirements based on external input and WG14 member interestIdentify priority messages and assign to Part teams for modeling and profiling based on team ability to interop (producer and consumer)多种文件描述Use Cases: description & sequence diagram (informative) - can appear in multiple part documents, or just oneInterface reference model: diagram (informative) one in each part, elements will overlap with other IRM diagramsMessage types: profile (normative) - appears in only one part document for system of record,Part 3 近期技术路线,Spring 2011 Develop additional profiles for 2011Summer Draft 61968-3 revised documentAdd DiscreteMeasurements and other new profilesRemove generic items that belong in Part 1 (message types -genericRemove any old message definitions that no longer needed (measurement list, outage record, switching schedule)Distribute to WG14 for commentFall Submit MCR,2011/03 UCA 互操作,Multiple Part 3 scenarios with DiscreteMeasurementsPart 9 participation in one scenario with EndDeviceEvents Service definitions based on latest Part 100 wsdl and xsd templates6 participating system vendors All scenarios successful,优先实现的用例,FLISR (Part 3)Requires switching schedules for isolation and supply restorationNetwork Initialization, Tap for New Subdivision (Parts 3, 4, 9, 13)Service BasedPlanned work, switching order for energizationMeter replacement (Part 6) Need vendor for CISConditional-based transformer maintenance (Parts 3, 6)Requires analog measurements and switching orders for isolationTrouble Ticket, Outage Record, Callback (Parts 3, 8)Already sequence diagrams in Part 8Need vendor for customer service,优先明确的 Profile,基于资产的量测信息Required for conditional-based maintenancePart 3 document, developed by Part 6 teamCould be AnalogMeasurement profilePart 6 team to investigate Asset-Measurement associationPart 3 team to investigate using existing MeasurementList in Part 3 doc.调度计划Required for conditional-based maintenance, FLISR, and Tap for New Subdivision (energization)Part 3 document, developed by Part 3 team操作票Required for conditional-based maintenance, FLISR, and Tap for New Subdivision (energization)Part 3 document, developed by Part 3 team,和调度计划相关的内容,状态检修Maintenance mgmt requests isolation for a certain time periodSchedule is executed in OMS/DMS context and also sent to work mgmt if manual steps requiredMaintenance mgmt requests return to normal stateSchedule is executed in OMS/DMS context and also sent to work mgmt if manual steps required已有的调度计划相关的用例See WG14 - Use Cases - Parts 3-5-7-9 doc,大纲,整体架构PART 3 最新进展PART 6 最新进展相关的技术标准,工作管理目的; 实现资产的全寿命管理建立良好的Asset 和PSR关系,Part 6 参考模型:基于设备维护,2011/03 UCA 互操作,Fine tuned Work Management message:WorkRequestOther WM messages developed but were not tested in the IOP ServiceRequestWorkOrder and ServiceOrder Interop Use cases and interaction patterns developed and tested in the Interop Part 6 INTEROP participation:,请求/应答的同步交互模式,Alstom Grid, EDF R&D Simulator, Sunflower Systems requesting workIBM Maximo in the role of Work Management system responding to the work Request,工作计划,Refine WorkOrder and ServiceOrder messages Start with WorkStatusReport and other messages to complete the work management base cycle. Work on Part 6 CD with the plan to submit it to IEC in July 2011Work with Tanja to include Part 6 requirements to CIMStart with conditional based maintenance use cases and messages,大纲,整体架构PART 3 最新进展PART 6 最新进展相关的技术标准,NIST 概念模型,Source: NIST Interim Roadmap,/,Achieving the Best from Complementary Organizations,IEC TCs,Contextual Framework,IEC Strategic Group on Smart Grid (SG3),IEC TC8,Business Requirements / Use Cases,IEC is the SDO for the Electric IndustrySG3is the Standard Management Board arm that defines what IEC is doing for the SmartGrid. This is translated into a framework. TC8 is developing standards at the Utility needs and requirements level and collaborates with the other TCs that are developing technical specifications standards.TC57 is responsible for power system management and associated information exchange.WG14 (of TC57) is responsible for utility enterprise information exchange standards using the Common Information Model (CIM),The ZigBee & HomePlug Smart Energy Alliance is currently sponsoring an activity to update its Smart Energy Profile to take advantage of the standard and technology neutral CIM. This work is planned to be proposed to become a new part in the IEC 61968 series of standards.,The UCA (Utility Communications Architecture) User Group is dedicated to promoting the integration and interoperability of electric/gas/water utility. It is the User Community for all TC57 standards and other related users concerns.The CIM User Group is a fast growing organization of CIM users that provide important feedback and suggestions to the SDO.,OpenSG Subcommittee is responsible for: (a) rationalization of standard-setting organizations to ensure that technical standards are developed with independence, transparency and broad industry representation and (b) ensuring Testing Standards and Certification Guidelines are defined and support functional and timing requirements of industry initiatives and evolution,AMI-Ent is a user-driven organization that starts with standards and extends them in an efficient and quick manner to meet current utility project requirements. Appropriate extensions are fed back through the CIM User Group and/or directly to the IEC. Artifacts of this organization are from the utility integration point-of-view, which is a superset of the application/product-oriented point-of-view of the generic IEC interfaces.,Smart Energy Profile 2.0,SEP 2.0 Profile Functionality,Application functionality includesDRLCMessa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年事业单位工勤技能-广西-广西水利机械运行维护工二级(技师)历年参考题库典型考点含答案解析
- 2025年事业单位工勤技能-广西-广西工程测量员一级(高级技师)历年参考题库典型考点含答案解析
- 2025年事业单位工勤技能-广东-广东计算机操作员二级(技师)历年参考题库含答案解析
- 2025年事业单位工勤技能-广东-广东水工闸门运行工三级(高级工)历年参考题库典型考点含答案解析
- 2025年事业单位工勤技能-广东-广东医技工二级(技师)历年参考题库典型考点含答案解析
- 2020-2025年设备监理师之设备工程监理基础及相关知识高分通关题型题库附解析答案
- 2020-2025年基金从业资格证之私募股权投资基金基础知识通关题库(附答案)
- 2025年中级卫生职称-主管技师-输血技术(中级)代码:390历年参考题库典型考点含答案解析
- 2025年银行金融类-金融考试-期货从业历年参考题库含答案解析(5套)
- 2023年设备监理师之设备监理合同通关提分题库及完整答案
- 园林工程竣工验收与养护期
- 儿童感觉统合能力发展评定量表
- 案卷评查培训课件模板
- 一二手联动培训课件
- 创业中的团队管理与组建
- 丙酸丙酯的分离工艺
- 二维层状材料的堆叠效应
- 骨科膝骨关节炎一病一品优质护理汇报课件
- 15D502 等电位联结安装
- 两单两卡安全培训
- 审计资料交接清单
评论
0/150
提交评论