全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
计算实例:(作业)M.V. Brodie Arrived 0600 Hrs Wednesday 9th JuneN.O.R. Tendered 1100 Hrs Wednesday 9th JuneLoading Commenced 0700 Hrs Thursday 10th JuneLoading Completed 1200 Hrs Tuesday 15th June Vessel sailed 2100 Hrs Tuesday 15th June Cargo loaded 20,000 metric Tonnes Grain in Bulk Lay time to commence at 1300 Hrs if notice given before noon. At 0700 Hrs next working day if given after noon, notice to be given in ordinary working hours (0900-1700 Hrs Monday to Friday). Cargo to be loaded at the rate of 5,000 metric Tonnes per weather working day of 24 consecutive hours. Time from 1700 Hrs Friday or the day preceding a holiday to 0800 Hrs Monday, or next working day not to count unless used, but only actual time used to count, unless vessel already on demurrage. Demurrage rate $5,000 per day pro rata/despatch rate at half demurrage rate on lay time saved. Other salient notes: Normal port working hours 0700-1700 Monday to Friday. Working outside aforementioned normal hours is available on overtime basis. On Monday 14th June rain stopped work in the port from 0900-1000 Hrs. The vessels owners agreed an overtime shift from 0700-1600 Hrs on Saturday 12th June. The vessels sailing was delayed due to an engine problem on 15th June.答案:单位名称编号_Messr_日期Date_船名 M.V._Brodie_装/卸货种及吨数 Loading/Discharging_20,000_metric tons of_Grain in Bulk _时间 Time日期 Date星期 Day递交装卸准备就绪通知书时间 Notice of Readiness Tendered: 1100 Hrs Wednesday 9th June接受装卸准备就绪通知书时间 Notice of Readiness Accepted:装卸时间起算时间 Laytime Commenced to Count: 1300 Hrs Wednesday 9th June开始装卸时间 Loading/Discharging Commenced: 0700 Hrs Thursday 10th June装/卸货完毕时间 Loading/Discharging Completed: 1200 Hrs Tuesday 15th June 货物装/卸率 Rate of Loading/Discharging: 5,000 MT per W.W.D. of 24 consecutive hours日期 星期时间Hours说明可用时间实用时间节省/滞期时间DateDay of the WeekFromtoDescriptionLaytime allowed D H MLaytime used D H M Time saved/lost D H M9th JuneWednesdayO600Arrived0009th JuneWednesday1100N.O.R. Tendered 0009th JuneWednesday1300Laytime commence 0009th JuneWednesday13002400Laytime count 1111010th JuneThursdayO0002400Laytime count 2424011th JuneFridayO0001700LOADING 1717011th JuneFriday17002400not to count 00012th JuneSaturdayO000O700not to count 00012th JuneSaturdayO7001600overtime work99012th JuneSaturday16002400not to count 00013th JuneSundayO0002400not to count 00014th JuneMondayO000O700not to count 00014th JuneMondayO700O900Actual LOADING 22014th JuneMondayO9001000rain00014th JuneMonday10002400LOADING 1414015th JuneTuesdayO0001200LOADING Complete1212015th JuneTuesday12001900Allowed time used up707速遣/滞期费率 合计96 Hours89 hours7Rate o
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 11.2犯罪与刑罚教学设计:统编版七年级下册道德与法治学历案
- 2026年事业单位《幼儿教育》专业知识专项训练试卷(附答案)
- 2026年事业单位招聘供应链计划管理员岗位模拟试题集
- 高中语文必修下册《青蒿素:人类征服疾病的一小步》教学设计:基于科学精神与任务群的深度阅读实践
- 初中八年级英语Unit 3 Reading Plus教学设计
- 初中七年级生物教学设计:运动系统的结构与功能解析
- 小学五年级班队活动教学设计:复之有道 习之有效-期末复习策略指导主题班会
- 高一生物学必修1蛋白质是生命活动的主要承担者教学设计
- 小学教资面试语文全真模拟试卷试讲类题库及参考答案
- 2026初中教资面试物理全真模拟试卷试讲真题解析
- 精装修施工培训
- 爱鸟护鸟生态教育课件
- 桥牌介绍教学课件
- 戒毒所生产安全知识培训课件
- 项目商务管理课件教学
- DBJ-T15-81-2022 建筑混凝土结构耐火设计技术规程
- 养老机构管理课件
- 机关保密室管理制度
- 《车站信号自动控制》复习题库
- 铁路电子客票应急处置
- 2025年中国中信集团招聘笔试参考题库含答案解析
评论
0/150
提交评论