



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
计算实例:(作业)M.V. Brodie Arrived 0600 Hrs Wednesday 9th JuneN.O.R. Tendered 1100 Hrs Wednesday 9th JuneLoading Commenced 0700 Hrs Thursday 10th JuneLoading Completed 1200 Hrs Tuesday 15th June Vessel sailed 2100 Hrs Tuesday 15th June Cargo loaded 20,000 metric Tonnes Grain in Bulk Lay time to commence at 1300 Hrs if notice given before noon. At 0700 Hrs next working day if given after noon, notice to be given in ordinary working hours (0900-1700 Hrs Monday to Friday). Cargo to be loaded at the rate of 5,000 metric Tonnes per weather working day of 24 consecutive hours. Time from 1700 Hrs Friday or the day preceding a holiday to 0800 Hrs Monday, or next working day not to count unless used, but only actual time used to count, unless vessel already on demurrage. Demurrage rate $5,000 per day pro rata/despatch rate at half demurrage rate on lay time saved. Other salient notes: Normal port working hours 0700-1700 Monday to Friday. Working outside aforementioned normal hours is available on overtime basis. On Monday 14th June rain stopped work in the port from 0900-1000 Hrs. The vessels owners agreed an overtime shift from 0700-1600 Hrs on Saturday 12th June. The vessels sailing was delayed due to an engine problem on 15th June.答案:单位名称编号_Messr_日期Date_船名 M.V._Brodie_装/卸货种及吨数 Loading/Discharging_20,000_metric tons of_Grain in Bulk _时间 Time日期 Date星期 Day递交装卸准备就绪通知书时间 Notice of Readiness Tendered: 1100 Hrs Wednesday 9th June接受装卸准备就绪通知书时间 Notice of Readiness Accepted:装卸时间起算时间 Laytime Commenced to Count: 1300 Hrs Wednesday 9th June开始装卸时间 Loading/Discharging Commenced: 0700 Hrs Thursday 10th June装/卸货完毕时间 Loading/Discharging Completed: 1200 Hrs Tuesday 15th June 货物装/卸率 Rate of Loading/Discharging: 5,000 MT per W.W.D. of 24 consecutive hours日期 星期时间Hours说明可用时间实用时间节省/滞期时间DateDay of the WeekFromtoDescriptionLaytime allowed D H MLaytime used D H M Time saved/lost D H M9th JuneWednesdayO600Arrived0009th JuneWednesday1100N.O.R. Tendered 0009th JuneWednesday1300Laytime commence 0009th JuneWednesday13002400Laytime count 1111010th JuneThursdayO0002400Laytime count 2424011th JuneFridayO0001700LOADING 1717011th JuneFriday17002400not to count 00012th JuneSaturdayO000O700not to count 00012th JuneSaturdayO7001600overtime work99012th JuneSaturday16002400not to count 00013th JuneSundayO0002400not to count 00014th JuneMondayO000O700not to count 00014th JuneMondayO700O900Actual LOADING 22014th JuneMondayO9001000rain00014th JuneMonday10002400LOADING 1414015th JuneTuesdayO0001200LOADING Complete1212015th JuneTuesday12001900Allowed time used up707速遣/滞期费率 合计96 Hours89 hours7Rate o
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 陕西省2025-2026学年高三(上)开学摸底历史试卷(含答案)
- 项目型组织中的团队动态管理研究-洞察及研究
- 部门月度安全培训主题课件
- 【小升初真题】2025年贵州省黔南州小升初数学试卷(含答案)
- 核子结构演化-洞察及研究
- 基于区块链技术的刀板架全生命周期溯源系统在HACCP体系中的应用
- 基于BIM的空心顶全生命周期运维成本动态模拟模型构建
- 垃圾分类体系缺失导致的一次性杯回收率断崖现象
- 国际标准框架下化学品安全数据共享机制构建难点
- 国产高端锯片在航空航天领域应用的技术壁垒与突破点
- 栈桥修复方案(全文)
- 某五星级酒店单项工程经济指标
- 交通标志牌工程施工组织设计(标准版)
- 全区建设工程质量检测人员岗位考试考核实施细则
- 【课件】《红烛》课件24张统编版高中语文必修上册
- 交通事故认定书复核申请书模板
- 电气一次设备吊装搬运施工方案
- “一机一档”范本(共12页)
- 长输管道施工工序
- 公司法实施条例
- 印刷包装专业英语汇总
评论
0/150
提交评论