国外著名酒店工程部操作程序-3(英文)REPAIRSANDMAINTENANCE(37-56).doc_第1页
国外著名酒店工程部操作程序-3(英文)REPAIRSANDMAINTENANCE(37-56).doc_第2页
国外著名酒店工程部操作程序-3(英文)REPAIRSANDMAINTENANCE(37-56).doc_第3页
国外著名酒店工程部操作程序-3(英文)REPAIRSANDMAINTENANCE(37-56).doc_第4页
国外著名酒店工程部操作程序-3(英文)REPAIRSANDMAINTENANCE(37-56).doc_第5页
已阅读5页,还剩15页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: BATH REPAIRSSTANDARD: REPAIR BATH CHIPS AND SCRATCHES IN A PROFESSIONAL MANNER =PROCEDURE:When repairing baths, only “Bath Repair Kits” are to be used. Mix and apply as per the instructions on the back side of the packet.NOTE: PAINT IS NOT TO BE USED UNDER ANY CIRCUMSTANCES.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: SERVICING A ROOM AIR CONDITIONERSTANDARD: SERVICE AIR CONDITIONER AS PER THE PROCEDURE ON EACH KEN-FIX-IT VISIT=PROCEDURE:1. Switch air conditioner on and check all four locations on the switch. Operate the fan correctly (i. e. off, low, medium and high).2. Operate the thermostat and check the cooling valve opens and closes. Leave thermostat set at the mid range.3. Check outer thermostat cover is tight and free of marks.4. Remove air filter and replace with spare from Ken-Fix-It trolley.5. Remove front cover and check drain pan is clear and drain is operating free of restrictions.6. Check insulation is fixed to cabinet securely.7. Check for any water leaks from chilled water flexible lines, connections and valve.8. Remove any dust build up with a wire brush and coat area with rust proofing paint.9. Clean any dirt build up from the cooling coil and drain pan.10. Ensure support brackets are secure.11. Visual check of wiring to ensure plug connections are tight and wiring is in good order and out of water.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: FURNITURE REPAIRSTANDARD: FURNITURE WILL BE REPAIRED TO ORIGINAL CONDITION.=PROCEDURE:Furniture repairs are to be carried out in a professional manner at all times. It is important that repairs carried out are not noticeable and are secure, as they are an receive a lot of abuse.Questionable furniture will not be put back into use, it will be reported to the Chief Engineer so a disposal notice can be written.When repairs are carried out, ensure there are no splinters or burrs protruding and it is sanded back in preparation for painting.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: PAINT REPAIRSSTANDARD: PAINT WILL BE REPAIRED SO PATCHES ARE NOT EVIDENT AND ORIGINAL COLOURS MATCHED. =PROCEDURE:The Ken-Fix-It cart will carry a stock of all Guestroom paint colours as per the architectural of colours. When repairing paint damage the surface should be cut back so excess layers will not occur. If the paint cannot be perfectly matched so repair marks are not noticeable, the whole of the affected wall, furniture, bench tops, doors, etc. are to be cut back and repainted.Before repainting on a whole wall etc. ensure the patch has had sufficient time to dry as wet or damp paint will give an incorrect colour match.If an entire section is to be painted a Maintenance Request is to be written by the Ken-Fix-It and given to the Chief Engineer or Assistant Chief Engineer for signing and prioritising to the hotel painters.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: REPORTING OF KEN-FIX-IT WORK COMPLETESTANDARD: ALL REPORTS TO BE HANDED IN BY 1630 ON A DAILY BASIS. PROCEDURE:At the end of each days work the Ken-Fix-It is to return all completed room check lists to the assistant Engineers Office. Each completed sheet will have a date, Ken-Fix-Its signature and room number clearly written in the assigned spots.The Ken-Fix-It will mark the master room sheet, kept on the progress board with a cross inside the circle beside the rooms completed on that day with the day and month shown beside it (X) 1/9/352) (COMPLETE DATE ROOM NO)The rooms that have been blocked by the Ken-Fix-It for the following day will have a circle put beside the room number (i. e. o 353) (BLOCKED ROOM NO)The master room sheet will be a computer print of all room numbers by block available from the Assistant Chief Engineer. Master room sheets will be completed at least three (3) times a year.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY:REPAIRS AND MAINT. KEN-FIX-IT/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: CART STOCK LEVELS AS PER KEN-FIX-IT STOCK LISTSTANDARD: MAINTAIN CART STOCK LEVELS AS PER KEN-FIX-IT STOCK LIST. =PROCEDURE:1. Refer to attached Ken-Fix-It Stock List.2. Ken-Fix-It Stock List is minimum par levels to be carried at all times.3. This level is to be replenished at the end of each days work.4. If stores levels are running down, ensure they are re-ordered in the spare parts book.5. Periodic checks will be made by the Chief Engineer or Assistant.STANDARDS AND PROCEDURESDEPARTMENT: REPAIRS AND MAINT JOB CATEGORY: HANDYMAN HEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: BOILER CLEANINGSTANDARD: BOILER FIRE TUBES TO BE CLEANED AT TWELVE MONTHS INTERVALS AND LEFT FREE OF ALL SOOT AND CARBONS. =PROCEDURE:Under the direction of the Mechanical Department the boiler will be stripped down for cleaning. Before starting ensure the area is well ventilated.Overalls, breathing masks, safety glasses and rubber gloves are to be used while cleaning is in progress. Obtain all of the following items from the workshops and take to the boiler room:-1. I bag of rags2. All safety gear3. Boiler brush kit4. Industrial vacuum cleaner5. Heavy duty garbage bag 6. Lead lamp7. Hand cleaner gel8. Bannister brush and shovelClean tubes by pushing rods with a brush on the end up and down each fire tube. Leave vacuum in the bottom of the boiler to vacuum up all soot. When tubes have been brushed put vacuum head over the top of each to remove any suspended soot. Clean down end plates and turbulence rods. Access the flue and clean with a bannister brush and vacuum.When boiler has been cleaned, clean all tools, plantrooms and outside of the boiler. Empty vacuum into plastic bag and dispose of to loading dock.STANDARDS AND PROCEDURESDEPARTMENT: REPAIRS AND MAINT JOB CATEGORY: HANDYMAN HEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: MACHINERY CLEANINGSTANDARD: MAINTAIN MACHINERY IN A CLEAN CONDITION AT ALL TIMES.=PROCEDURE:Machinery will be kept clean by all Departments but specifically will come under the Handymans job to continuously go through plantrooms and clean machinery as per the attached schedule:1. When cleaning machinery with exposed moving parts, before isolating check with the Assistant Engineer until equipment and operation is totally familiar.2. Always isolate moving equipment before cleaning.3. Equipment shall be cleaned with a damp cloth, dry cloth and wire brush if necessary.4. All excess oil and grease dust or general dirt is to be cleaned off.5. If during cleaning work, paint or seals are removed touch up with colour paint and if necessary undercoat with rust prohibitor.STANDARDS AND PROCEDURESDEPARTMENT: JOB CATEGORY: REPAIRS AND MAINT MECHANIC/HANDYMANHEAD: CHIEF ENGINEER G.M. APPROVAL: DATE:TASK: TROLLEY LUBRICATION AND REPAIRSSTANDARD: MAINTAIN TROLLEYS IN A SAFE AND CLEAN OPERATING CONDITION.=PROCEDURE:Due to the continuous problems within other hotels caused by incorrect lubrication of trolleys the following procedure will be adopted:-1. Oil is not to be used to lubricate sleeve bearing on trolley wheels.2. Dry silicon spray is to be applied to the axle after the wheel has been removed and axle and sleeve cleaned of all dust and or dirt.3. Refit wheel and spin to evenly spread lubricant over entire axle contact surface and check for noise to ensure enough lubricant has been applied.4. Any repair work carried out on a trolley is to be clearly indicated on the maintenance request form together with trolley number, to avoid continuous repair to fatigued materials.5. When replacing wheels, ensure treads are clean and lubricant free. Refit split pins, if used, by bending around and ensuring ends are flush with axles.SHERATON WENTWORTH SYDNEYJOB DESCRIPTIONPOSITION TITLE KEN-FIX-ITDEPARTMENT ENGINEERINGDIVISION REPAIRS AND MAINTENANCEDATE 1 JUNE 1989=BASIC FUNCTIONRequired to perform in an all-around capacity with experience in all facets of trade and carrying out duties in a responsible and competent manner.ORGANISATIONAL RELATIONSHIPReports to: Assistant Chief Engineer.PRINCIPAL DUTIES AND RESPONSIBILITIESPrimarily responsible for maintaining the Guest rooms to the Quality standards as defined in the Sheraton Corporation Engineering Operations Manual and Sheraton Wentworth Hotel Ken-Fix-It maintenance check list.=REVIEWED BY:APPROVED BY:COMPILED BY: APPROVED BY:REVISED:KEN-FIX-ITINDUCTION CHECK LIST1. HOTEL ORIENTATION.2. SGSS FOUR STANDARDS.MUST be completed within one month of Orientation.3. Complete a recognised First Aid Course within two months of Orientation.4. Have Training in knowledge of all standards for dress and personal appearance, grooming and Guest relations.5. Possess all round trade skills.6. Have an operating knowledge of the Work Request System and Assignment Board.7. a) Know what the Ken-Fix-It program consists of.b) Know how the Ken-Fix-It program operates.c) Know what is needed to operate the program.d) Know how to control and measure the program.e) Now the end of month reporting procedure for Ken-Fix-It .8. Possess a knowledge of the location of all Hotel facilities including: Bars, Restaurants, Function Rooms, etc.9. Departments objectives, activities and responsibility to other departments.10. Familiarisation with Hotel fire procedures and use of portable fire extinguishers and hose reels.DEPARTMENT ORIENTATIONCHECKLISTIndicate if actioned1. Introduction to:General Manager Manager2. Introduction to:Members of relevantDepartmentAnd closely related Departments3. Department FamiliarisationEquipment Lockers Toilets Emergency exits Fire extinguishers, Fire hoses, fire blankets Photocopiers Staff dining room Pay office Uniform room Service lifts First aid kits Introduce to Departments first aider Caf bar4. Departments Functions and Structure(i.e. objective, activitiesand how relates to otherDepartments and overall Company)5. Position Duties(i.e. position descriptionand how position relatesto other activities of the Department)6. Departments Policies Proceduresbreaks, lunch hour timecards, pay daydepartment union delegateappearance, uniform, hygieneand hair styleemergency procedure Code 88grievance proceduretransportation after midnightexhibit forms e.g. annualleave, absentee,workers compensationtermination clearance slipmeeting Q.I.P., Safety,Weekly Department HeadsPackage passUnion slipNews sheet SheratonWorld Sheraton pacificSigned by: Department Head New Employee DateFile: Relevant Department PersonnelS H E R A T O N W E N T W O R T H H O T E L= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = QUALITY STANDARDS MANUAL ENGINEER DEPARTMENT = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =TABLE OF CONTENTSIntroductionEngineering Department OverviewYour personal Appearance ConductroomingClothing/UniformsHours of work and AttendanceGeneral ConductSafety StandardsWork in Guest RoomsTools of your TradeWork QualitySheraton Wentworth hotelEngineering Department Quality Standards Manual=Introduction=The Sheraton Wentworth is an International Hotel of very high standing and is known for its professionalism and quality of service worldwide. Much of the success of any Hotel is due to its Staff and the Sheraton Wentworth is no exception. In order to maintain our reputation as a first class Hotel, it is necessary to ensure our quality standards are of the highest.This manual is designed to set out the guidelines by which the engineering department works and the personnel standards that are required. Reading this manual will allow you the opportunity to become familiar, or refresh yourself. With the standards that we expect of you and hopefully answer many questions you may have.The engineer department is an important department within any hotel and we, in this department, should readily and constantly recognize the necessity for work to be performed of the highest standard. Work that is carried out below standard will directly or indirectly affect guest service or the product that we have to sell. Bad workmanship in guest rooms or public areas is readily identified by guests and adversely flavours guests opinions of our establishment. Poor workmanship can also lead to an unsafe condition of equipment, fixtures and fittings. The Sheraton Corporation is both legally and also morally responsible of the promises and Employee safety when within the confines of the premises and this is something that should never be forgotten.DEPARTMENT STRUCTURECHIEF ENGINEER ASSISTANT CHIEF ENGINEERMAINTENANCE ENGINEERPLANT ENGINEERELECTRICIAN/CARPENTER/FITTER/PAINTER/PLUMBER/HANDYMANKEN-FIX-ITTHE ENGINEERING DEPARTMENT, IN SHORT, IS RESPONSIBLE FOR THE MAINTENANCE AND PHYSICAL UPKEEP OF THE HOTEL

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论