




已阅读5页,还剩13页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
choose the correct meaning; (4) to correct the typos; (5) so the child write words (ABAB, and AABB); (6) in accordance with written words; (7) the complete word, and explain the meaning of the word; (8) collocation; (9) make sentences with the word; (10) the written language as required. (C) the main sentence types (1) complete sentences; (2) write down the meaning of a sentence or expression of thoughts and feelings; (3) write sentences as required; (4) finish malalignment of the sentence; (5) modified sentences. 2, knowledge classification (1) the common conjunctions coordinate: . . 一面 . 1, to examine the topic, identify problems associated with two 2, analysis, alternative question two is in direct proportion to the amount of the associated relationship is inversely proportional relationship. 3, and set unknown, column proportion type 4, and solutions proportion type 5, and test, wrote answer language plenary, and subject: application problem (1)-simple application problem and composite application problem review content simple application problem composite application problem answers application problem of general steps 1, and figure out meaning-through examines the, find known conditions and by seeking problem 2, and analysis number relationship-analysis known conditions Zhijian, and conditions and problem Zhijian of relationship, determine problem-solving method and problem-solving steps. 3, and column type calculation-lists formula, is out subdivisions 4, and test, and wrote answer-check, and checking, and wrote answers typical application problem 13, and subject: application problem (3)-column equation solutions application problem review content overview problem-solving steps 1, and figure out meaning, find by seeking of unknown and x said 2, and according to meaning find equivalent relationship, lists Equation 3, and solutions equation 4, and test, and wrote answers according to meaning find equivalent relationship of common method 1 , And according to common of number relationship type, established equivalent relationship 2, and according to has learn had of calculation formula, 3, and according to problem in the of focus described sentence from overall Shang determine basic of equivalent relationship 4, and using segment figure, and list method, method analysis number美每家国际家居博览中心项目临时水电施工专项方案审核: 编制: 日期: 2011/8/1 中博建设集团有限公司重庆分公司 美每家 国际家居博览中心工程项目部随着经济发展进入新常态,改革进入了攻坚期、深水区,出现了经济发展三期叠加的现象,我党毅然决然地放缓了经济发展的脚步,注重质量,精益求精,推行供给侧结构性改革,以更加稳健的步伐,引导中国经济走向世界巅峰。 美每家研发中心及标准厂房F号楼工程项目临时用水用电施工方案目 录1、编制依据及说明22、工程概况23、现场用水、用电设计23.1、临时用水设计33.2、临时用电设计54、施工现场布置94.1、临时用水布置94.2、临时用电布置104.3、施工现场防雷措施115、施工现场用水用电安全技术措施116、消防措施131、编制依据及说明编制依据:根据美美每家研发中心及标准厂房F号楼工程施工现场用水、用电的需要,以及为了满足工期的要求,考虑到多个作业面的交叉作业的现场要求,根据建筑电气工程施工质量验收规范(GB503032002)、施工现场临时用电安全技术规程(JGJ46-2005)等规定,按照甲方提供的供电电源位置和供电功率,合理配置机械设备及电力设施。编制说明:本临时用水用电方案用于指导施工现场临建布置,便于现场加强对现场用水用电进行安全技术管理提供理论依据。2、工程概况美每家研发中心及标准厂房F号楼工程,工程占地面积16475平方米,规划总建筑面积为67007.37M2。设计单位为机械工业第六设计研究院。3、现场用水、用电设计 针对本工程的特点,为了确保现场施工的需要,合理组织生产提供良好的前提条件,根据现场实际情况和现行的施工用水用电管理规范,进行现场施工用水用电的设计。3.1、临时用水设计临时用水包括施工用水q1、施工机械用水q2、施工现场生活用水q3、生活区用水q4、消防用水q5。各用水量计算如下:1)施工现场用水量按下式计算:q1=k1q1施工用水量k1用水系数取1.15Q1工程量N1施工用水定额t1有效作业日T每天工作班数K2用水均衡系数取1.5四个瓦工班8小时内的砌筑量(每班以砌砖20m3计)混凝土养护8小时内用水(自然养护以20m3计)N1以每立方米砂浆搅拌耗水量取600L/m3计,每立方米混凝土养护耗水量以300 L/m3计。q1=1.15(33.2600+420200+300300)1.5/(83600)=6.69L/ S2 )施工机械用水量:q2=k1q2施工机械用水量k1用水系数取1.15Q2同一种机械台数N2施工机械台班用水定额k3用水不均衡系数取2.00根据现场施工机械计划初步估计,q2=2.5 L/ S3)施工现场生活用水量q3=q3施工现场生活用水量P1施工现场高峰昼夜人数(人),取400人N3施工现场生活用水定额(一般为2060L/人班),取40L/人班K4施工现场生活用水不均衡系数,取1.5t每天工作班数q3=400*40*1.5/1*8*3600=0.83L/ S由于本工程的主要生活区不在现场,故用水量可以不计。4)生活区生活用水量根据现场实际情况,项目一期工程现场除安排办公室及部分临时生活设施外,主要生活区及工人生活区另设他处,故用水量不考虑。5)消防用水量q5根据规定,现场面积在5公顷以内者同时发生火警2次,消防用水定额按1015L/S考虑,据现场占地面积, q5暂按15L/S考虑.6)总用水量(Q)计算q1+q2+q3+q4q5,且工程面积小于5公顷故Q= q5=15L/S7)供水管直径d=管网中水流速度,取=2.5d=0.087m故选用供水管为100,现场总用水量约为60t/h。甲方提供DN100管径的给水管,满足需要。施工供水采用50的PVC管按照总平面布置图沿着基坑布置,每50m留置一个阀门。3.2、临时用电设计主要机械设备配置如下:序号机械或设备名称型号规格数量额定功率(KW)小计(KW)1塔吊H3/36B1701402钢筋切断机GQ40-247.5303钢筋弯曲机GJB4043124钢筋调直机43125电渣压力焊HD-5004套3126闪光对焊机21002007插入振捣器ZN60101.1118交流焊机BX3-300424969手提电锯MJ50101.11110圆盘锯MJ105441611砂浆搅拌机HJ-200631812施工井架SS1606116613套丝机441614潜水泵832415混凝土输送泵HBT602110220合计884根据机械表,本工程用电负荷可计算如下: P=1.05(k1P1/cos+k2p2+k3p3)其中:P1为电动机总功率 p2为电焊设备总容量 p3照明总功率 k1=0.5,k2=0.6,k3=0.8,cos=0.7最大用电量出现在主体施工阶段后期,砌体插入阶段。P1= k1P1/cos=0.5(140+30+12+12+11+16+18+66+16+220)/0.7=386kwP2= k2p2=0.5(12+200+96)=154kw由于生活区不在设置在现场,照明总功率按现场机械用电量10%(约55kw)进行考虑, P3=0.860=28kwP=1.05(386+154+28)=568kw 本工程由业主提供1250KW变压器,由于各种设备的运行情况不同,各种设备不在同一时间段内使用,综合考虑现场的使用情况,业主提供的1250KVA变压器能满足施工需要。3.2.1、用电回路的布置本工程临时用电是从业主方提供的1250KVA引出的380V电源,现场设置一级配电箱1个,二级配电箱3个(1#塔吊、1#钢筋加工房、1#木工房、1#电动混凝土输送泵、1#塔吊覆盖施工范围内用电一个回路;2#塔吊、2#钢筋加工房、2#木工加工场、2#电动混凝土输送泵、2#塔吊覆盖施工范围一个回路;3#主管现场办公区域),现场根据机械的使用情况配置适当的移动配电箱,具体位置详总平面布置图。总配电箱内配置:漏电保护断路器(DZ10LE400/430) 4个刀开关(HD13BX1000/31) 1个分配电箱内配置:漏电保护断路器(DZ15LE100/490) 4个漏电保护断路器(DZ15LE63/290) 1个断路器(DZ10250/330) 1个移动配电箱:漏电保护断路器(DE15LE63/490) 1个漏电保护断路器(DE15LE40/490) 3个漏电保护断路器(DE18LE20A) 3个断路器(DZ10100/330) 1个断路器(DZ1063/330) 1个插座(四孔16A、三孔16A) 各3个(1)第一个回路用电负荷统计P1=270KW(2)第二个回路用电负荷统计 P2=270KW(3)第三个回路用电负荷统计 P2=28KW3.2.2、电缆线的选择与布置本工程临时用电采用三相五线制,三根相线,两根零线,即工作零线N和保护接地PE。S导线截面(mm2)P线路输送功率L送电线路的距离允许的相对压降(本工程取5%)C系数(本工程采用铜芯线,取77)根据用电回路的布置及各回路机械总功率的计算:变压器到一级配电箱导线截面:S1=568150/775=221mm2根据计算结果,本工程现场一级柜主电缆选择380mm2的电缆线。又根据规范要求,两根零线截面不宜小于相线截面的一半,取60mm2。故现场电缆为VV380 mm2+260mm2。第一、二回路的导线截面S1=300200/775=155mm2根据计算结果,本工程现场第一回路相线主电缆选择3195mm2的电缆线。又根据规范要求,两根零线截面不宜小于相线截面的一半,取65mm2。故现场电缆为VV365 mm2+250mm2。第三回路的导线截面S2=2850/775=3.6mm2根据计算结果,本工程现场第二回路相线主电缆选择310mm2的电缆线。又根据规范要求,两根零线截面不宜小于相线截面的一半,取15mm2。故现场电缆为VV310mm2+27.5mm2。总配套供电器材及电缆用量:序号材料名称材料规格用量1电缆VV380 mm2+260mm2180m2电缆VV365 mm2+250mm2200m3电缆VV310mm2+27.5mm280m4配电柜一级1个5配电柜二级3个6配电柜三级20个4、施工现场布置4.1、临时用水布置从业主指定的供水点,采用100的镀锌管管从供水点引出至施工现场,沿途分段预留设置接水口,布置垂直50供水管到各楼,然后每楼每层设置布置垂直50供水管,每层设置20管取水点,确保现场施工用水的供应。施工现场排水,在各楼四周设置排水沟,并在大门处设置沉淀池,将水引入沉淀池后用潜水泵抽排进市政管网。 4.2、临时用电布置4.2.1地下室施工用电在地下室结构施工时,由二级配电箱引出引出临时用电线,再根据需要配备移动配电箱,以便照明,焊接及振动棒等使用。4.2.2主体结构施工及装修阶段的用电布置在主体结构施工时,为了保证楼层的施工用电,从0.000开始,从二级配电箱中分别引线。电缆线从楼层向上敷设时,由于自重可能会引起电缆线的下坠,故在敷设过程中每个楼层的高度用M12膨胀螺栓加U形卡固定电缆线,以保证其稳定性。为了保证每层楼在施工时,杜绝乱搭乱接现象,以保证现场文明施工,电缆线从40PVC套管中穿设,从而避免电缆线外露。4.2.3、TN-S接地接零保护系统系统在电源中性点直接接地的三相电力系统中,由电源中性点引出的工作零线N和保护零线PE分开设置的系统,即三相五线制系统,如图所示。在这一系统下,所有电器设备正常不带电的确外露可导电部分均与PE线用金属导体作电器连接。在如图所示的施工现场临时工程接地接零保护系统中,电源中性点直接接地的工作电阻为2欧,为保证PE线的可靠,防止因起某处断线而失去接零保护作用,以及有利于降低PE线接地电阻值,在现场PE线的首端处,中间处、末端处作三处的重复接地,每处重复接地电阻为8欧。见图:TN-S接地接零保护系统原理性示意图 4.3、施工现场防雷措施根据重庆市当地平均雷暴日气候调查,该工程所在地平均雷暴日15d,工程施工过程中所用机械设备高度最高的为塔吊h=65m,避雷针采用16的圆钢l=2m制作,安装在塔吊顶部,接地安装按重复接地要求进行安装。避雷针保护范围为以塔吊为圆心R=90的圆,施工建筑物已在此保护范围内。覆盖范围如下图所示:5、施工现场用水用电安全技术措施5.1、现场临时用电必须符合施工现场临时用电安全技术规范的规定,项目上有各项安全用电管理制度,加强对职工的安全用电教育。5.2、现场价高电线的走向按照施工总平面布置图严格走线,在适当位置设置明显的标志,小心保护,警示职工。5.3、现场配电箱或开关柜的设置点平整,不得被水淹或土埋,严防碰撞或物体打击,附近不能堆放杂物。配电箱或开关柜的配线绝缘良好,排列整齐,绑扎成束并固定在盘内。其导线的剥头不得过长,接压牢固。盘面操作不得带有电体明露。5.4、照明、动力合一的流动刀闸箱装设四级漏电电流动作保护器。5.5、电器设备的金属外壳与专用保护零线连接,专用保护零线由工作接地,配电室的零线和第一次漏电保护电源侧的零线引出,接零保护系统如上图。保护接零应单独敷设,不得他用。保护接零的接地电阻要求一月测一次。5.6、移动式电动机械使用软橡胶电缆,严禁一个开关接两台及两台以上的电动设备。夜间施工的照明线路应尽量使用胶管线,并在白天及时收验。5.7、严格执行电气线路
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 织物基丝网印刷射频能量收集天线的设计、制备及性能优化
- 2025年快开门式压力容器R1证理论全国考试题库含答案
- 2025全国特种作业操作证高处安装维护拆除模拟试卷及答案
- 保卫管理员创新意识评优考核试卷含答案
- 2025绿化技师考试题及答案
- 温室水汽回收用海藻酸盐凝胶复合吸湿剂制备与应用
- 2025年最低生活保障服务合作协议书
- 稀土熔炼工安全综合测试考核试卷含答案
- 新型PDINH基复合光催化材料的制备及其性能研究
- 密码技术应用员安全检查考核试卷含答案
- GB/T 3672.1-2002橡胶制品的公差第1部分:尺寸公差
- 月度工作总结
- 《C++语言基础》全套课件(完整版)
- 箱涵高支模方案
- 第十章我国的环境保护政策和法规课件
- 《社会工作伦理案例分析》课件 儿童和青少年社会工作伦理
- 艺人明星形象代言肖像权使用合同模板
- 绿化养护检查记录表
- 减盐防控高血压治课件全球减盐行动课件
- 《饲料学》粗饲料
- (实施)产万吨高吸水性树脂(SAP)技改项目环评
评论
0/150
提交评论