




已阅读5页,还剩11页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
BIM from the Construction ManagerGeneral Contractor Viewpoint,Barnhart, Inc. a Heery International Company Sumeet GadiSenior Vice PresidentRandy LaNearBIM ManagerACCM ConferenceJune 19th 20th Newport Beach CA.,Barnhart, Inc. a Heery International Company,Founded in 1983, celebrating our 25th yearHeadquartered in San Diego6 Regional Offices throughout California4th Largest Educational Builder in the Nation Largest K-12 Educational Builder in the NationA pioneer in use of new technologies for the construction industry,Why Barnhart implemented BIM,Strategic ConsiderationsWe are committed to being a Leader in technology use in our industryWe have historically been in the forefront of new technology adoptionBIM is the wave of the futureIncreasing awareness and desire among OwnersTactical ConsiderationsDesign Validation Constructability Analysis Interference DetectionConstruction Planning VisualizationConstruction Coordination Trade Collaboration,How Barnhart implemented BIM,Strategic ConsiderationsLevel of Corporate CommitmentBaby Steps Vs. Deep End of the PoolResourcesTactical ConsiderationsProject SelectionDecide Extent of ModelingDefine Deliverables,How Barnhart implemented BIM,Strategic DecisionsFull Corporate CommitmentDeep End of the PoolIn-house Core Competency with Out-sourced AugmentationTactical DecisionsDel Norte High SchoolComplete Architectural/Structural/Systems ModelConstruction / As-built / Facilities Model,Construction Management Real Life Applications Of BIM / VDC / IPD,BUILDING INFORMATION MODELINGVIRTUAL DESIGN CONSTRUCTIONINTEGRATED PROJECT DELIVERYBIM / VDC / IPD How does it provide Advantages and Benefits And What Challenges to ExpectProject ExamplesDel Norte High School, Poway Unified School DistrictOceanside High - Performing Arts Center, Oceanside Unified School DistrictBIM TopicProject scenariosDefining the BIM Process,BIM Current Real World UseCDs, Drawings, Plans, Models, Projects & Workflows,How are we utilizing BIM and what BIM tools are we usingConstructability (clarification, interference detection, )Scheduling Timeliner in Navisworks 4DQuantity Takeoffs 5DLEED Certified ProjectsTodays Tools & WorkflowsRevit Architectural, Structural, & MEP 2009Navisworks Manage 2009AutoCAD MEP 2009VE ToolkitUSGBCLEEDPlanned Future Tools and Possible WorkFlowsAutodesk 3Ds MaxInnovaya or Quantity TakeoffIntegrated Project Delivery,Construction Challenge for Del Norte High School Production Studio Room A150,Sloped Structure above SpaceNo Section Cuts in Construction DocumentsHow to fit everything into the space had been only conceptualized bestMechanical Return Air duct to adjoining space wouldnt fit across the Supply air duct and between the Suspended ceiling and the pipe batten system.,Architectural Floor Plan,Mechanical Floor Plan,Architectural Elevation,BIM Solutions for Del Norte High School Production Studio Room A150,CoordinationSuspended Gyp Board CeilingTight Space RequirementsPipe Batten Grid For Production StudioOriginal Design would not fit,Interference ResolutionSpace Requirements verified by ModelPlacement reviewed with Field personnel Pipe Batten Hardware Rep able to visualize space and equipment in relation to structuralNavisworks files created for full visualization and communication of the spaceNew Routing and layout per collaborative BIM review effort,OHS Performing Arts Center,Three disciplines Modeling the Project in Autodesk Revit Architectural, MEP & Struct.First BIM Project for all Three Architect Self taught in Revit MEP consultant had basic trainingStructural Consultant had basic trainingThe Challenge BIM to CDs,Mechanical floor plan that clearly shows the ducts penetrating the Auditorium Floor Right ?,Overcoming Project Challenges and changing Industry Mindsets,BIM Model really does clearly showing the ducts penetrating the Auditorium Floor !,How Barnhart utilizes NavisWorks,The ViewsSeeing is BelievingGraphical communicationViewer for team membersCollision detectionTime LinerRenderingsPresentationSpeed,BIM as a Project Approach,Utilizing a BIM Workflow on a Project will Naturally bring about Collaboration Responsibility AccountabilityWith a BIM Workflow and BIM models the focus becomes project focused not CD focused and Drives an integrated Project Delivery Process Mutual Respect and Trust Mutual Benefit and Reward Early Involvement of Key Participants Early Goal Definition Intensified Planning Open Communication Appropriate Technology Organization and LeadershipWith a BIM model you can produce your CDs from the BIM model and everything matches between the BIM Model and the CD set,BIM Advantages and Benefits Leveraging BIM for Coordination,VisualizationCoordination and Design / Improved Workflow Coordination ReviewMonitor other Disciplines work (Grids/Levels/Walls/Floors/Columns)Interference CheckBetween Linked Files and Within Single FileProject Review / Quality Control Project Managers Coordination ScheduleDownstream UsabilityConstruction Industry Data Shared for Phasing Coordination, Facilities Lifecycle Management,BIM Challenges and Obstacles Summary,Change (Human nature you know)Current Practices (Construction Project Delivery Systems)Interoperability (Between existing software platforms)Qualified PeopleLegal ConsiderationsIndustry Understanding of just what BIM is and is notIndustry Acceptance and application of these understandingsInitial Cost to Change (hardware, software, training, implementation)Defined DeliverablesDefined BIM ProcessesDefined BIM Project Roles,Design VisualizationDesign Assistance & Constructability ReviewSite Planning & Site Utilization“4D” Schedulin
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 吉林省吉林市学校消防安全测试题十九(含答案)
- 2025-2030中国血液制品供需缺口测算及产能扩张规划分析报告
- 2025-2030中国自动驾驶高精地图资质获取策略与数据更新机制研究报告
- 2025-2030中国膨化食品添加剂技术突破与市场前景研究报告
- 2025-2030中国肝炎治疗药物研发进展与市场格局报告
- 帕金森病护理综合知识与习题集
- 2025-2030中国糙米饮料加工废弃物综合利用报告
- 2025-2030中国精酿啤酒教育市场培育与认证体系构建可行性报告
- 2025-2030中国精神类药物消费趋势与政策环境影响分析报告
- 2025-2030中国管理咨询行业垂直细分领域市场机会研究报告
- 二零二五版养老保险单质押退休金贷款合同3篇
- 第八章-统计指数(平均指数)
- 《电动自行车停放充电场所消防技术规范》(DB 32-T 3904-2020)
- 2024年中国创新方法大赛考试题库(含答案)
- 2024年废旧船舶拆解合同范本
- 川教版2024-2025学年五年级上册信息技术全册教案
- 清洁间歇性导尿的护理
- 哈工大课件教学课件
- 森林防火智能预警监测系统方案
- 2024~2025学年中考数学重难创新题 二次函数性质综合题含答案
- 《 大学生军事理论教程》全套教学课件
评论
0/150
提交评论