已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Hot water heat pump installation instructionsThank you for using our Zhigao central air conditioners.This instruction book is a general version of heat pump hot water machine from Zhigao.The appearance of machine that you buy may be different from the instruction book we described. But it doesnt matter for your operations.Before you use it, please read the instruction book carefully and take care of it The product you are using is air heat pump and water heater of Zhigao, it needs cleaning and maintaining periodically. If it is not done, the rate of breaking down would increase, and its life would reduce seriously; while if cleaned reasonably, the internal dust would be eliminated as result of improving indoor air quality, and reducing the power consumption.To protect your legal rights, please install by qualified workers. .The product you are using is heat pump and water heater of Zhigao. If it operates within a short time in winter, make sure charge for 24 hours a day; if not operates for a long time, be sure to draw off water in it, avoiding the units cracking. Please contact with central air-conditioning management system center, Zhigao regularly, professionals will be sent with paying for checking, draining, adding water, adjustment and other cleaning and maintenance services. Just in case, air conditioner fails down.Contents1. Measures of safety precautions . 2. Choosing places of installing3. Installation of units 4. Installation of wanderled controller5. Electrical connection 6. Test of units working 7. Protection and maintenances 8. Names of various part of unit and parameter 9. Instructions of unit function10. Installation of available accessoriesClosures chart 1 chart 2 chart 39 1. Measures of Safety PrecautionsWarningDealer or qualified installer is needed.Installers should be qualified, if install by themselves. Incorrect operations will result in fire, electric shock, injury and leakage.If the accessories are purchased locally, they should be designated.Using the specified product may cause fire accidents such as electric shock , leakage. For retails, professional installers are needed.Power connections shall comply with the requirements of the local electric company.By law, reliable grounding is needed. If the ground connection is imperfect, it may result in electric shock. When the heat pump water heater needs to be moved or re-installed, contact your dealer or professional operators.Improper installation will result in fire, electric shock, injury, leakage and other accidents. Dont make repairs by yourself.Improper repairs can cause fire, electric shock, injury, leakage and other accidents, be sure to ask your dealer or professionals for help.Caution1. Check the installation of leakage protection.Leakage protection switch must be installed, if not, it may result in electric shock.2.Connect the cable correctly.If the cable is in the wrong way, it may damage the electrical components.3.The unit can not be set in the combustibles (paint, gasoline, chemical reagents, etc.) near the operation to prevent the risk of fire or explosion. If caught a fire, please immediately turn off the power and put the fire out with a fire extinguisher.4.Dont touch the refrigerant exhausting components to avoid being scalded.According to the instructions, the unit is required regular maintained to ensure its working.If the unit fails to work, please find the fault and eliminate it ,according to the manual of the Fault Analysis and Troubleshooting, or contact central air conditioning product management center, identify and eliminate causes of malfunction before rebooting; Dont do in the case of failure without forcibly boot .5.If the refrigerant or water happens to leak, please immediately turn off all switches,; For example, the unit can not be operated by the controller, you must turn off the main power to make it stop.6.Please use the specified capacity fuse, do not use wire, copper wire instead , or it would caught a fire.2Choosing places of installing 2-1 Choosing places for installing 1)Units can be installed on the ground or on a suitable roof, but make sure ventilate as much as possible. 2)Avoid units to be installed in which theres certain requirements of noise and vibration. 3)The installing places should be avoided where has direct sun shining, and should be far away from the boiler flue or the air which will corrode copper condenser and coils.4)If the units location are available to unauthorized people ,security measures should be taken, such as setting the fence and so on. This would prevent accidental damage or artificial breakage and it also would prevent the controlling box to be opened to expose the running electrical components 5)The base height of the unit installing should be no less than 100mm.Make sure theres a drain to let water run out smoothly with no pounding. 6)When installing on the ground, the unit should be placed on a flat concrete base, which should be extended in the permafrost below. Do not place the base unit connecting with the building foundation to avoid noise and vibration transmitting to influence others. The base unit with mounting holes can be tightened with the unit.7)When the unit is installed on the roof, steels of base units must be strong enough to support the weight of the crew and worker, the unit can be used to support a similar ground-mounted concrete foundation and channel frame. Load-bearing steel tanks with the unit damper mounting holes must be in the same center line, and has sufficient width to install.8)For special occasional installation requirements , please consult an architect or building contractor or other professional advices.Caution When determine the installation positions, water pipes and wiring installation should be considered with no smoking, steaming or other heat draught. Whats more, working noises and cold or hot winds do not affect the surrounding.2-2Tank installation site selection1)Places of providing sufficient space for the installation and maintenance.2)Supporting surface is flat, and can sustain the tank and be fixed to the tank at a vertical direction3)Places of no corrosive gas leakage.4)Places are easy to install plumbing and electrical connections2Choosing places of installing2 The suitable place for installing 2-3 Rooms for installation 1. When installing , resume some place for mending as the following chart, then install the unit 2.Make sure leave enough room for mending . 2Choosing places of installingPay Caution:1.If theres obstruct on the air conditioner unit, please put upper it more than 200mm.2.If theres piles of things around the unit , then the distance from its top should be 400 mm 3. If the air conditioner unit is settled in the underground,indoor,or other closed places, please pay attention to the air circulation around the units , the volume of air for RS-200M/Y should be more than 8000m3/h, so is 12000m3/h for RS-380/TA.2-4 The moving of air conditioner unit 1. Please use four steel wires of more than & 6mm hanging units to move in . 2. To avoid the units surface to be scratched, deformed, please contact soft things on their surface with the wire. 3.When it is over, please move away the transporting plate.2-5 The moving of many air conditioner units Chart 2.3 RS-200M/Y Foundation bolts 4/tableWorking distance of foundation bolts as the following chart Chart 3 The units of installation3-1 The connection of pipe CautionDuring the installing procession, air, dust, and other debris should be not allowed in the piping system. Water heater should be heated before installing inlet and outlet water pipe.3-1-1 Heat insulation Insulation m
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 小学主题班会课件:民族团结共筑和谐
- 2026年宁夏固原中小学教师招聘考试题库及答案(教育综合知识完整版)
- 就市场调研数据共享的商洽函(6篇)范文
- 云计算数据中心运营管理与维护指南
- 远离网络沉迷迈向美好未来四年级主题班会课件
- 化学工程与制药工程作业指导书
- 优化项目立项评审流程通知函(3篇范文)
- 感恩父母孝敬长辈家庭美德小学主题班会课件
- 商洽签订长期供货协议函6篇范文
- 项目管理优化提升协作效率方案
- 2026年国家开放大学生产与运作管理期末复习资料考试综合练习(典优)附答案详解
- 2026年生成式AI驱动的智慧短视频创作应用与案例分析
- 招标采购代理规范
- 扬州2025年江苏扬州市江都区教师进城选拔考试笔试历年参考题库附带答案详解
- 新生儿科院感培训制度
- 公共场所卫生培训制度
- 反家暴反歧视培训课件
- 物业安全生产教育和培训制度
- 牙再植知情同意书
- 独立站课件教学课件
- 《JYT 0584-2020扫描电子显微镜分析方法通则》(2026年)实施指南
评论
0/150
提交评论