




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
XXXXXX FIELD DEVELOPMENT PROJECT COSIGN DISCIPLINE SIGNATURE DATE MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION PAGE X OF X REV.DATEDESCRIPTIONBYCH K.APPRO. CLIENT OFFSHORE OIL ENGINEERING CO.,LTD. CNOOC DOCUMENT NO. REV. CERTIFI. NO. XXXXX MATERIAL INSPECTION PROCEDURE FOR PIPNG FABRICATION DOC-XXXXXX 0 CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 2 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. CONTENTS 1.0SCOPE 2.0REFERENCE STANDARD 3.0MATERIAL RECEIVING INSPECTION 4.0MATERIAL INSPECTION/TRACEABILITY 5.0MARKING TRANSFERENCE FOR SURPLUS MATERIALS 6.0 REPORT FORMS CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 3 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. 1.0SCOPE This procedure covers the methods, techniques and acceptance standards for material inspection of piping fabrication of XXXXXX project. 2.0REFERENCE STANDARD Clients Specification ASTM A6 ASME B31.3 3.0 MATERIAL RECEIVING INSPECTION All materials for this project purchased by contractor or supplied by client shall be placed in either the yard storage area designated for the project or placed in the project warehouse area. There they shall be examined for compliance with the purchase order, invoice and clients specifications. The warehouse supervisor, engineer, user and QC material inspector shall verify such items as quality, quantity, markings wall thickness, dimensions, and condition. 3.1 MATERIAL VERIFICATION Materials shall be verified according to the packing list, Mill certificate, and specification. The inspectors shall sign the verification record when the materials are acceptable. 3.2 CONFORMANCE MATERIAL Material, which meets specification, shall be marked or tagged with all relevant information. Material supply department shall have the materials stored separately from materials of other project and kept in dry and tide protection circumstance. Materials shall be given adequate protection for preventing from deforming and foreign hitting. 3.3 NON-CONFORMANCE MATERIALS Non-conformance materials shall be marked, recorded, evaluated and removed CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 4 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. to quarantine. 3.4 JUDGMENT OF NON-CONFORMANCE MATERIALS The judgment shall be performed by experienced person in quality control, production and workmanship. 3.5 NON-CONFORMANCE MATERIAL REPAIR Material that may be repaired to bring them into specification requirements shall only be carried out by approved methods and personnel strictly in accordance with the manufacturer instructions, thereby in no way compromising the warranty or guarantees on the material in question. Client to approve any repairs to client supplied material. 3.6 REJECTION AND SCRAPPING Material that can not reach to conformance by repair shall be rejected or scrapped. Client to approve all rejection or scrapping of client supplied material. 4.0 MATERIAL INSPECTION QC inspector shall inspect material specification, grade, heat no. (control no.) in accordance with material issuing list and Mill Certificates before material are used, QC inspector shall prepare the inspection report and sign on when the items/parts he has inspected is acceptable to the specified requirements. Inspection report shall be submitted to Client or the Certification Authority for review. 4.1 Certification and inspection requirements for procured bulk piping items shall be defined on a form to be produced by the construction contractor. This form shall become an attachment to the majority of material requisitions and purchase orders. 4.2 Information included on the form shall be: a. The level of Company, certifying authority which is unanimously agreed and the Contractor surveillance inspection required for each item. b. The requirements for certifying authority design appraisal for each item, if any. CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 5 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. c. The requirements for certification documentation for each item. 4.3 Material will be rejected unless a certification and inspection form is attached or a written note from Certification Engineer confirms that no certification is required special conditions apply. 4.4 The following certification documentation shall be specifically checked for conformance to specification: a.Pipe Mill Material Certificates. b.Steel Mill Material Certificates. c. Manufacturers Certificate for flange, fittings and valves etc. 5.0 MARKING TRANSFERENCE FOR SURPLUS MATERIAL In princi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025云南普洱思茅区南屏镇玉屏社区卫生服务站招聘2人考试参考题库附答案解析
- 2025贵州贵阳国家高新区选聘区管国有企业领导人员2人笔试模拟试题及答案解析
- 2025年中卫市中医医院高校毕业生实习招募笔试模拟试题及答案解析
- 2025年四川锅炉高级技工学校面向社会公开考核招聘5名高层次人才笔试备考题库及答案解析
- 2025汉中镇巴县中医院招聘(10人)笔试参考题库附答案解析
- 园林施工试题和答案
- 2025四川广汉骨科医院招聘骨科住院医师、内科住院医师、急诊科(ICU)医师、中医科医师岗位8人考试参考题库附答案解析
- 2025金华经济技术开发区下属公办学校公开招聘参聘制教师14人考试参考题库附答案解析
- 2025安徽六安市霍山县公办幼儿园招聘保育员9人笔试参考题库附答案解析
- 高级财务管理指南
- 湖南省安仁县2025年上半年事业单位公开招聘试题含答案分析
- 2025-2026学年秋季第一学期学校德育工作安排表
- 房屋市政工程生产安全重大事故隐患排查表(2024版)
- 外墙排水管施工合同
- 2022年十部经典的三级片电影
- 眼震视图结果分析和临床意义
- 2011-2017国民经济行业分类标准转换对照表
- 《现代汉语》PPT课件(223页PPT)
- 顶推法钢箱梁安装施工方案
- 桥架支吊架安装实用标准图
- 中国诗词协会入会申请表
评论
0/150
提交评论