




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
XXXXXX FIELD DEVELOPMENT PROJECT COSIGN DISCIPLINE SIGNATURE DATE MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION PAGE X OF X REV.DATEDESCRIPTIONBYCH K.APPRO. CLIENT OFFSHORE OIL ENGINEERING CO.,LTD. CNOOC DOCUMENT NO. REV. CERTIFI. NO. XXXXX MATERIAL INSPECTION PROCEDURE FOR PIPNG FABRICATION DOC-XXXXXX 0 CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 2 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. CONTENTS 1.0SCOPE 2.0REFERENCE STANDARD 3.0MATERIAL RECEIVING INSPECTION 4.0MATERIAL INSPECTION/TRACEABILITY 5.0MARKING TRANSFERENCE FOR SURPLUS MATERIALS 6.0 REPORT FORMS CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 3 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. 1.0SCOPE This procedure covers the methods, techniques and acceptance standards for material inspection of piping fabrication of XXXXXX project. 2.0REFERENCE STANDARD Clients Specification ASTM A6 ASME B31.3 3.0 MATERIAL RECEIVING INSPECTION All materials for this project purchased by contractor or supplied by client shall be placed in either the yard storage area designated for the project or placed in the project warehouse area. There they shall be examined for compliance with the purchase order, invoice and clients specifications. The warehouse supervisor, engineer, user and QC material inspector shall verify such items as quality, quantity, markings wall thickness, dimensions, and condition. 3.1 MATERIAL VERIFICATION Materials shall be verified according to the packing list, Mill certificate, and specification. The inspectors shall sign the verification record when the materials are acceptable. 3.2 CONFORMANCE MATERIAL Material, which meets specification, shall be marked or tagged with all relevant information. Material supply department shall have the materials stored separately from materials of other project and kept in dry and tide protection circumstance. Materials shall be given adequate protection for preventing from deforming and foreign hitting. 3.3 NON-CONFORMANCE MATERIALS Non-conformance materials shall be marked, recorded, evaluated and removed CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 4 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. to quarantine. 3.4 JUDGMENT OF NON-CONFORMANCE MATERIALS The judgment shall be performed by experienced person in quality control, production and workmanship. 3.5 NON-CONFORMANCE MATERIAL REPAIR Material that may be repaired to bring them into specification requirements shall only be carried out by approved methods and personnel strictly in accordance with the manufacturer instructions, thereby in no way compromising the warranty or guarantees on the material in question. Client to approve any repairs to client supplied material. 3.6 REJECTION AND SCRAPPING Material that can not reach to conformance by repair shall be rejected or scrapped. Client to approve all rejection or scrapping of client supplied material. 4.0 MATERIAL INSPECTION QC inspector shall inspect material specification, grade, heat no. (control no.) in accordance with material issuing list and Mill Certificates before material are used, QC inspector shall prepare the inspection report and sign on when the items/parts he has inspected is acceptable to the specified requirements. Inspection report shall be submitted to Client or the Certification Authority for review. 4.1 Certification and inspection requirements for procured bulk piping items shall be defined on a form to be produced by the construction contractor. This form shall become an attachment to the majority of material requisitions and purchase orders. 4.2 Information included on the form shall be: a. The level of Company, certifying authority which is unanimously agreed and the Contractor surveillance inspection required for each item. b. The requirements for certifying authority design appraisal for each item, if any. CON.NO XXXXXX FIELD DEVELOPMENT PROJECT DOC XXXXXX MATERIAL INSPECTION PROCEDURE FOR PIPING FABRICATION Page: 5 of 5Rev. X OFFSHORE OIL ENGINEERING CO., LTD. c. The requirements for certification documentation for each item. 4.3 Material will be rejected unless a certification and inspection form is attached or a written note from Certification Engineer confirms that no certification is required special conditions apply. 4.4 The following certification documentation shall be specifically checked for conformance to specification: a.Pipe Mill Material Certificates. b.Steel Mill Material Certificates. c. Manufacturers Certificate for flange, fittings and valves etc. 5.0 MARKING TRANSFERENCE FOR SURPLUS MATERIAL In princi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 张家口市人民医院皮肤科医疗安全考核
- 张家口市人民医院儿童心肺复苏技能定期考核
- 2025年上半年全省事业单位公开招聘工作人员(含教师)笔试南充考区模拟试卷及答案详解(易错题)
- 衡水市中医院呼吸道传染病防护与隔离技术年度授权复审题
- 2025江苏镇江市精神卫生中心第一批编外岗位(非事业编制)招聘8人考前自测高频考点模拟试题附答案详解
- 2025春季四川叙永县委组织部叙永县人力资源和社会保障局叙永县事业单位人才岗位需求70人模拟试卷及完整答案详解
- 2025年深圳市烟草专卖局(公司)应届高校毕业生招聘22名模拟试卷及答案详解(考点梳理)
- 上海市人民医院免疫荧光技术考核
- 秦皇岛市中医院护理培训资源建设考核
- 2025福建福州市长乐区金峰镇人民政府公益性岗位招聘15人模拟试卷有完整答案详解
- 2025-2026学年江苏省徐州市八年级(上)第一次月考数学试卷(含答案)
- 战火勋章答题题库及答案
- 流延膜设备安全操作培训课件
- 医学基础期末试题及答案
- 2025年放射诊疗培训试题及答案
- (零模)苏州市2026届高三年级期初阳光调研试卷 历史试卷(含答案)
- 九年级英语上学期第一次月考(广东卷)(原卷版)
- 码头生产调度管理办法
- 智能巡查机器人系统设计
- 3.2营造清朗空间教学设计 2025-2026学年统编版道德与法治八年级上册
- 教科版物理八年级上册《2.光的反射定律》听评课记录2
评论
0/150
提交评论