




已阅读5页,还剩6页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
空间面板数据分析R的splm包 (任建辉,暨南大学)The splm package provides methods for fitting spatial panel data by maximum likelihood and GM. 安装R软件及其编辑器Rstudio 网址: /下载好Rstudio以后,操作都可以Rstudio中完成了,包括命令的编写、命令运行、图形展示,最方便的要数查看数据了。 R界面 Rstudio界面,形如matlab下面进入正题,了解splm包中的数据、命令及结果展示。所有命令都写在编辑窗口(studio左上区域),可以单独的运行每行命令,也可选取一段一起执行,点run按钮。1、首先,安装splm包并导入,命令如下:intall.packages(“splm”),选择最近的下载点library(splm) library(splm)载入需要的程辑包:MASS载入需要的程辑包:nlme载入需要的程辑包:spdep载入需要的程辑包:sp载入需要的程辑包:Matrix载入需要的程辑包:plm载入需要的程辑包:bdsmatrix载入程辑包:bdsmatrix下列对象被屏蔽了from package:base: backsolve载入需要的程辑包:Formula载入需要的程辑包:sandwich载入需要的程辑包:zoo载入程辑包:zoo下列对象被屏蔽了from package:base: as.Date, as.Date.numeric载入需要的程辑包:spam载入需要的程辑包:gridSpam version 0.40-0 (2013-09-11) is loaded.Type help( Spam) or demo( spam) for a short introduction and overview of this package.Help for individual functions is also obtained by adding thesuffix .spam to the function name, e.g. help( chol.spam).载入程辑包:spam下列对象被屏蔽了from package:bdsmatrix: backsolve下列对象被屏蔽了from package:base: backsolve, forwardsolve载入需要的程辑包:ibdreg载入需要的程辑包:car载入需要的程辑包:lmtest载入需要的程辑包:Ecdat载入程辑包:Ecdat下列对象被屏蔽了from package:car: Mroz下列对象被屏蔽了from package:nlme: Gasoline下列对象被屏蔽了from package:MASS: SP500下列对象被屏蔽了from package:datasets: Orange载入需要的程辑包:maxLik载入需要的程辑包:miscToolsPlease cite the maxLik package as:Henningsen, Arne and Toomet, Ott (2011). maxLik: A package for maximum likelihood estimation in R. Computational Statistics 26(3), 443-458. DOI 10.1007/s00180-010-0217-1.If you have questions, suggestions, or comments regarding the maxLik package, please use a forum or tracker at maxLiks R-Forge site:/projects/maxlik/Warning message:程辑包Matrix是用R版本3.0.3 来建造的 注意:在导入splm时,如果发现还有其他配套的包没有安装,需要先安装。 2、接着,查看数据及结构,命令如下: data(Produc,package=”Ecdat”) View(Produc) 3、引入空间权重矩阵(spatial weights matrix),命令如下data(usaww)Views(usaww)4、空间面板数据的广义矩估计,命令spgmGM GM summary(GM)Spatial panel fixed effects GM modelCall:spgm(formula = log(gsp) log(pcap) + log(pc) + log(emp) + unemp, data = Produc, listw = usaww, spatial.error = TRUE, moments = fullweights)Residuals: Min. 1st Qu. Median 3rd Qu. Max. -0.14000 -0.01950 -0.00316 0.01530 0.16800 Estimated spatial coefficient, variance components and theta: Estimaterho 0.sigma2_v 0.Coefficients: Estimate Std. Error t-value Pr(|t|) log(pcap) -0. 0. -0.0854 0. log(pc) 0. 0. 10.2405 2.2e-16 *log(emp) 0. 0. 27.5256 2.2e-16 *unemp -0. 0. -3.5691 0. *-Signif. codes: 0 * 0.001 * 0.01 * 0.05 . 0.1 15、空间面板极大似然估计,命令spmlfm- log(gsp)log(pcap)+log(pc)+log(emp)+unemp# fixed effects panel with spatial errorsFespaterr fm Fespaterr summary(Fespaterr)Spatial panel fixed effects error modelCall:spml(formula = fm, data = Produc, listw = mat2listw(usaww), model = within, spatial.error = b, hess = FALSE)Residuals: Min. 1st Qu. Median 3rd Qu. Max. -0.1250 -0.0238 -0.0035 0.0171 0.1880 Coefficients: Estimate Std. Error t-value Pr(|t|) rho 0. 0. 16.9138 2e-16 *log(pcap) 0. 0. 0.2052 0.83745 log(pc) 0. 0. 8.8494 2e-16 *log(emp) 0. 0. 28.0638 2e-16 *unemp -0. 0. -2.0788 0.03764 * -Signif. codes: 0 * 0.001 * 0.01 * 0.05 . 0.1 1#random effects panal with spatial lagRespatlag Respatlag summary(Respatlag)Spatial panel random effects ML modelCall:spreml(formula = formula, data = data, index = index, w = listw2mat(listw), w2 = listw2mat(listw2), lag = lag, errors = errors, cl = cl)Residuals: Min. 1st Qu. Median Mean 3rd Qu. Max. 1.38 1.57 1.70 1.70 1.80 2.13 Error variance parameters: Estimate Std. Error t-value Pr(|t|) phi 21.3175 8.3017 2.5678 0.01023 *Spatial autoregressive coefficient: Estimate Std. Error t-value Pr(|t|) lambda 0. 0. 5.554 2.793e-08 *Coefficients: Estimate Std. Error t-value Pr(|t|) (Intercept) 1. 0. 11.0016 2.2e-16 *log(pcap) 0. 0. 0.5190 0.6037 log(pc) 0. 0. 10.4258 2.2e-16 *log(emp) 0. 0. 25.3892 2.2e-16 *unemp -0. 0. -6.5009 7.984e-11 *-Signif. codes: 0 * 0.001 * 0.01 * 0.05 . 0.1 16、伴有随机效应和序列误差相关的空间面板模型的极大似然估计,命令speml#random effects panel with spatial lag and serial error correlation#optimization method set to “BFGS“Sarsrmod Sarsrmod summary(Sarsrmod)Spatial panel random effects ML modelCall:spreml(formula = fm, data = Produc, w = usaww, lag = TRUE, errors = sr, method = BFGS)Residuals: Min. 1st Qu. Median Mean 3rd Qu. Max. 2.66 3.02 3.18 3.18 3.31 3.77 Error variance parameters: Estimate Std. Error t-value Pr(|t|) psi 0. 0. 1214.1 |t|) lambda 0. 0. 9.973 |t|) (Intercept) 1. 0. 5.4295 5.652e-08 *log(pcap) 0. 0. 2.2829 0.02244 * log(pc) 0. 0. 0.7636 0.44510 log(emp) 0. 0. 25.1801 bsjktest(fm, data=Produc, listw = usaww, test=C.1)Baltagi, Song, Jung and Koh C.1 conditional testdata: log(gsp) log(pcap) + log(pc) + log(emp) + unempLM = 0.2617, df = 1, p-value = 0.609alternative hypothesis: spatial dependence in error terms, sub RE and serial corr.(2)bsktest,Baltigi,Song and Koh LM test for spatial panels bsktest(fm,data=Produc, listw = mat2listw(usaww),+ test=LM1, standardize=TRUE)Baltagi, Song and Koh SLM1 marginal testdata: log(gsp) log(pcap) + log(pc) + log(emp) + unempSLM1 = 0.083, p-value = 0.9338alternative hypothesis: Random effects(3)Covariance extractor method for splm objects sarremod library(lmtest) coeftest(sarremod)z test of coefficients: Estimate Std. Error z value Pr(|z|) (Intercept) 1. 0. 11.0016 2.2e-16 *log(pcap) 0. 0. 0.5190 0.6037 log(pc) 0. 0. 10.4258 2.2e-16 *log(emp) 0. 0. 25.3892 library(car) lht(sarremod,log(pcap)=log(pc)Linear hypothesis testHypothesis:log(pcap) - log(pc) = 0Model 1: restricted modelModel 2: function (x, .) UseMethod(formula) Df Chisq Pr(Chisq) 1 2 1 36.268 1.719e-09 *-Signif. codes: 0 * 0.001 * 0.01 * 0.05 . 0.1 1(更多详情请查看splm的help文档以及文后列的参考文献) 参考文献1.Baltagi,B.H.,Song,S.H.,Jung B. and Koh, W.(2007) Testing panel data regression models with spatial and serial error correlation. Journal of Econometrics,140,5-512.Baltagi,B.H.,Song,S.H and Koh, W.(2003) Testing panel data regression models with spatial error correlation. Journal of Econometrics,117,123-1503.Millo,G.,Piras,G.(2012) splm:Spatial Panel Data Models in R. Journal of Statistical Software,47(1),1-38.URL /v47/i01/4.Elhorst, J.P (2003) Specification and estimation of spatial panel data models, International Regional Science Review,26,pages 244-2685.Elhorst, J.P(2009) Spatial panel data models, In Fisher,M.M. and Getis,A.(eds),Handbook of Applied Spatial Analysis Springer,Berlin6.Giovanni Millo and Gaetano Carmeci,(2011) “Non-life insurance consumption in Italy: a subregional panel data analysis”, Journal of Geographical Systems,13:273-2987.Qu Feng and William C. Horrace,(2012)”Alternative Measures of Technical Efficiency :Skew,Bias and Scale”, Journal of Applied Econometrics, Forthcoming.8.Kapoor,M.,Kelejian,H.H. and Prucha,I.R.(2007) Panel data model with spatially correlated error components,Journal of Econometrics,140,pages 97-1309.Mutl,J.,and Pfaffermayr,M.(2011) The H
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 升学指导及咨询方案
- 营养素失衡与环境污染的前沿探索-第1篇-洞察及研究
- 学生餐具消毒安全培训课件
- 虚实夹杂证辨治-洞察及研究
- 嘉积中学 2025- 2026学年度第一学期第一次大测高三物理科参考答案及评分标准
- 低碳运营模式探索-洞察及研究
- 广东省部分学校2025-2026学年高三上学期9月联考历史试卷(含答案)
- 2025年安全员B证考试题及答案
- 情报融合知识图谱构建-洞察及研究
- 办公室岗位说明书0
- 发展经济学第四版教学课件02章发展经济学的形成与发展
- TCADHOH 0005-2024 听障人士120 报警服务规范
- 小学2年级心理健康教育课件《不做“小火山”》
- TSDDP 8-2024 新型无机磨石施工质量与验收规范
- 《人工智能导论》课程考试复习题库(含答案)
- 法律咨询服务质量控制方案
- 村集体经济理事长述职报告范本
- GB 1002-2024家用和类似用途单相插头插座型式、基本参数和尺寸
- DL∕T 515-2018 电站弯管 标准
- DZ∕T 0270-2014 地下水监测井建设规范
- 2024年河北石家庄市轨道交通集团有限责任公司招聘笔试参考题库含答案解析
评论
0/150
提交评论