




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、WS103WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEM(g) The point where the voltage drops from approximately 10 V to 0 V is the place where the defogger wire is broken.HINT:If the defogger wire is not broken, the voltmeter should indicate 0 V at the positive (+) end of the defogger wire but graduall
2、y increase to approximately 12 V as the meter probe moves to the other end.REPAIR1.REPAIR WINDOW DEFOGGER WIRE(a)Clean the broken wire tips with a grease, wax and silicone remover.Place the masking tape along both sides of the wire.(b)(c)Thoroughly mix the repair agent (Dupont paste No. 4817 or equi
3、valent).Using a fine tip brush, apply a small amount of the agent to the wire.After a few minutes, remove the masking tape.NOTICE:Do not repair the defogger wire again for at least 24 hours.(d)(e)WS B106759Masking TapeBroken Wire Repair PointB106758E03WS104WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SY
4、STEMDESCRIPTIONWhen the rear window defogger switch, which is built into the heater control assembly, is operated, the operation signals are transmitted to the A/C amplifier assembly through LIN. When the A/C amplifier assembly receives the signals, it turns on the RR DEF relay to operate the rear w
5、indow defogger.WIRING DIAGRAM WSEngine Room R/B, J/BA/C Amplifier AssemblyRR DEF Relay238from A/C No. 2 Fuse 11 E1from RR DEF Fuse1311L20Defogger WireNoise Filter1112N1L25E3A/C Controller Assembly37E114: LIN Communication LineE1B137053E02TX+15RDFGLIN1GND154Rear Window Defogger System does not Operat
6、eWS105WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEMPECTION PROCEDURE(a)Select the DTC check on the intelligent tester to check for communication errors.ResultBA(a)Select the ACTIVE TEST, use the intelligent tester to issue a control command, and then check the window defogger operation.Air Conditi
7、onerOKNGWS (a) Replace the air conditioner control assembly.NEXT(a) Turn the engine switch on (IG), press the defogger switch, and check that the window defogger operates.NGOKENDREPLACE A/C AMPLIFIER ASSEMBLY4CONFIRM REAR WINDOW DEFOGGER OPERATION3REPLACE AIR CONDITIONER CONTROL ASSEMBLYGo to step 5
8、ItemTest DetailsDefogger Relay (Rear)Turns rear window defogger OFF/ON2PERFORM ACTIVE TEST BY INTELLIGENT TESTERGO TO MULTIPLEX COMMUNICATION SYSTEMResultProceed toNo DTC is outputADTC are output (LIN communication)B1CHECK FOR DTCsWS106WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEM(a) Select the AC
9、TIVE TEST, use the intelligent tester to issue a control command, and then check the DEFOG relay operation.(b) Check that operation sound of the RR DEF relay is heard.OKNGSee page WS-108.NGOK(a)(b)Disconnect the RR DEF relay.Measure the voltage according to the value(s) in the table below.Standard v
10、oltage: Engine room R/B, J/B WSNGOKREPAIR OR REPLACE A/C NO. 2 FUSE, HARNESS OR CONNECTORTester ConnectionConditionSpecified Condition1 - Body groundEngine switch on (IG)10 to 14 VB137052E017CHECK WIRE HARNESS (RR DEF RELAY - BATTERY POSITIVE)REPLACE RR DEF RELAY6PECT RR DEF RELAYGo to step 9ResultP
11、roceed toRelay operating sound is heardOKRelay operating sound is not heardNG5PERFORM ACTIVE TEST BY INTELLIGENT TESTERWS107WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEM(a) Disconnect the RR DEF relay and A/C amplifier assembly connector.(b) Measure the resistance according to the value(s) in the
12、table below.Standard resistanceNGOKWS See page WS-108.NGOK(a) Disconnect the RR DEF relay.(b) Measure the voltage and resistance according to the value(s) in the table below.Standard resistance: Engine room R/B, J/BStandard voltage: Engine room R/B, J/BTester ConnectionConditionSpecified Condition5
13、- Body groundAlways10 to 14 VTester ConnectionConditionSpecified Condition4 - Body groundAlwaysBelow 1 WB137052E0110CHECK WIRE HARNESS (RR DEF RELAY - BATTERY POSITIVE AND BODY GROUND)REPLACE RR DEF RELAY9PECT RR DEF RELAYREPLACE A/C AMPLIFIER ASSEMBLYREPAIR OR REPLACE HARNESS OR CONNECTORTester Con
14、nectionConditionSpecified Condition2 - E1-38AlwaysBelow 1 W2 - Body groundAlways10 kW or higherEngine Room R/B, J/B:A/C Amplifier Assembly:E1RDFGB140724E048CHECK WIRE HARNESS (RR DEF RELAY - A/C AMPLIFIER ASSEMBLY)WS108WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEMNGOK(a) Disconnect the noise filte
15、r connector.(b) Measure the resistance according to the value(s) in the table below.Standard resistanceNGOK(a) Disconnect the RR DEF relay and defogger wire connectors.(b) Measure the resistance according to the value(s) in the table below.Standard resistance WSNGOKREPAIR OR REPLACE HARNESS OR CONNE
16、CTORTester ConnectionConditionSpecified Condition3 - L20-2AlwaysBelow 1 W3 - Body groundAlways10 kW or higherEngine Room R/B, J/B:Noise Filter:L20B140738E0212CHECK WIRE HARNESS (RR DEF RELAY - NOISE FILTER)REPLACE NOISE FILTERTester ConnectionConditionSpecified ConditionL20-1 - L20-2AlwaysBelow 1 WL
17、20-1 - Body groundAlways10 kW or higherL20B140726E0211PECT NOISE FILTERREPAIR OR REPLACE RR DEF FUSE, HARNESS OR CONNECTORWS109WINDSHIELD / WINDOWGLASS WINDOW DEFOGGER SYSTEM(a) Measure the resistance according to the value(s) in the table below.Standard resistanceNGOK(a) Measure the resistance according to the value(s) in the table below.Standard resistanceWS NGOKREPAIR OR REPLACE REAR WINDOW DEFOGGER WIREREPAIR OR REPLACE HARNESS OR CONNECTORTester ConnectionConditionSpecified ConditionN1-1 - Body groundAlwaysBelow 1 WN1B127529E0314CHECK WIRE HARNESS (DEFOGGER WIRE CONN
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年高性能中级维修电工及技能培训考核试题(附答案)
- 2025年高考时事政治题库及参考答案详解【预热题】
- 2025年高级会计师资格考试高级会计实务试题及答案
- 宁化护理笔试题及答案
- 老年俱乐部管理办法
- 舆论引导员管理办法
- 计时工退出管理办法
- 贷款利息优惠管理办法
- 人防在建工程管理办法
- 中央加强教师管理办法
- 眼科常见疾病诊疗指南
- 铁道车辆构造与检修高职PPT完整全套教学课件
- 浙人美2011版四年级美术上册《水资源》教案及教学反思
- 《机电设备组装与调试》课程标准
- 350吨汽车吊地基承载力验算
- 2023年高等教育文学类自考-03297企业文化考试参考题库(含答案)
- 哈尔滨医科大肿瘤外科学腹外疝
- 浅谈农村小学心理健康问题现状及其防治策略 论文
- 《金税四期管控下企业纳税筹划实务指南》读书笔记思维导图
- 初中英语 Should I be allowed to make my own decisions 课件
- 高考一轮复习成语
评论
0/150
提交评论