版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、brocade silkworm 3800光纤通道交换机 说明书emc ds-16b22008年11月24日15:13about this guidethis guide provides the following information: chapter 1 introducing the silkworm 3800 overview of the silkworm 3800. chapter 2 installing and configuring the silkworm 3800 instructions for installing, and configuring the sil
2、kworm 3800. chapter 3 operating the silkworm 3800 instructions for basic switch operation and how to interpret system activity. appendix a product specifications description of components, physical specifications, environmental and other facility requirements, switch memory, and standards compliance
3、. glossary definitions for the terms used in this document and in related brocade documentation. index topics indexed alphabetically. introducing the silkworm 38002008年11月24日15:15this chapter provides the following information: 1.overview on page 1-1 2.monitoring and managing the silkworm 3800 on pa
4、ge 1-3 overview2008年11月24日15:15the silkworm 3800 is a 16-port fibre channel gigabit switch that supports link speeds up to 2 gbps. each port automatically negotiates to the highest common speed of all devices connected to the port. the ports are compatible with sfps (small form factor pluggable medi
5、a), are universal and self-configuring, and are capable of individually becoming an f_port (fabric enabled), fl_port (fabric loop enabled), or an e_port (expansion port). the silkworm 3800 includes the brocade fabric operating system?version 3.0, and is compatible with the entire brocade silkworm pr
6、oduct family. it can operate in a fabric containing multiple switches or as the only switch in a fabric. the silkworm 3800 is one rack unit in height, has an air-cooled chassis, and can be set up as a stand-alone unit or mounted in a 19-inch rack. the silkworm 3800 includes the following 1.16 optica
7、l ports, each with two leds (light-emitting diodes), one to indicate port status and one to indicate link speed 2.one serial port with an rs-232 connector 3.one 10/100 mbps ethernet port with an rj-45 connector 4.a switch power?led on the front panel, indicating whether the switch has power 5.a swit
8、ch status?led on the back panel, indicating the overall status of the switch 6.one or two power supplies, with built-in fans and leds (if two power supplies are installed, they are redundant and individually hot-swappable) 7.two fan trays, individually hot-swappable.the front panel15:15figure 1-1 sh
9、ows the front panel of the silkworm 3800, which contains the serial port, ethernet port, fiber optic ports and their corresponding leds, and the switch power led. figure 1-1 the front panel of the silkworm 3800 the ports on the front panel of the silkworm 3800 are color-coded in groups, with four pu
10、rple ports alternating with four unmarked ports, to indicate which ports can be used in the same brocade isl trunkingtm group. brocade isl trunking is a brocade fabric os feature that enables distribution of traffic over the combined bandwidth of up to four isls between two directly adjacent switche
11、s, while preserving in-order delivery. for information about brocade isl trunking, refer to the brocade isl trunking user guide.the back panel2008年11月24日15:16figure 1-2 shows the back panel of the silkworm 3800 switch, which provides access to the fan trays and power supplies and the switch status l
12、ed. each power supply also has an led that indicates the status of that power supply. the power supplies, fan trays, and motherboard are all frus (field replaceable units). monitoring and managing the silkworm 38002008年11月24日15:16the silkworm 3800 can be managed in-band using fibre channel protocol,
13、 or out-of-band by connecting to the ethernet port. the management functions allow the administrator to monitor fabric topology, port status, physical status, and other information to aid in system debugging and performance analysis. the switch automatically performs post (power on self-test diagnos
14、tics) each time it is turned on, and any errors are recorded in the error log. for more information about post, see post specifications on page a-6. the silkworm 3800 is compatible with the following management interfaces: 1.command line interface through a telnet connection for more information ref
15、er to the brocade fabric os procedures guide and the brocade fabric os reference. 2.brocade web tools for more information refer to the brocade web tools users guide. 3.brocade scsi enclosure services for more information refer to the brocade ses users guide. 4.standard snmp applications for more in
16、formation refer to the brocade mib reference. all these management methods can be used either in-band (fibre channel) or out-of-band (ethernet), except for brocade ses, which can be used in-band only. in addition, the silkworm 3800 supports the following brocade software: 1.brocade zoning for inform
17、ation refer to the brocade zoning users guide. 2.brocade quickloop for information refer to the brocade quickloop users guide. 3.brocade fabric watch for information refer to the brocade fabric watch users guide. 4.brocade advanced performance monitoring for information refer to the brocade performa
18、nce monitoring users guide. 5.brocade extended fabrics for information refer to the brocade distributed fabrics users guide. 6.brocade remote switch for information refer to the brocade distributed fabrics users guide. 7.brocade isl trunking for information refer to the brocade isl trunking users gu
19、ideinstalling and configuring the silkworm 38002008年11月24日15:16the silkworm 3800 can be installed either as a stand-alone unit or in a rack that meets eia (electronic industries association) standards. this chapter provides the following information: 1.installation and safety considerations on page
20、2-1 2.items included with the silkworm 3800 on page 2-2 3.setting up the silkworm 3800 as a stand-alone unit on page 2-2 4.installing the silkworm 3800 in an eia rack on page 2-3 5.configuring and connecting the silkworm 3800 on page 2-6 installation and safety considerations2008年11月24日15:16the foll
21、owing conditions are required to ensure successful and safe operation of the switch: 1.the supply circuit, line fusing, and wire size must conform to the electrical rating on the switch nameplate. 2.the ambient air temperature near the switch must not exceed 40 degrees celsius. this is particularly
22、important to verify if the switch is installed in a closed or multi-rack assembly. 3.the volume of air flow available to the switch must be at least 300 cubic feet per minute, and the front and rear air vents must not be blocked. 4.if the switch is to be installed in a rack: (1)the rack space must b
23、e 1u high, 19 inches wide, and 24 inches deep. (2)all equipment installed in the rack should have a reliable branch circuit ground connection. do not rely on a connection to a branch circuit, such as a power strip. (3)the additional weight of the switch should not unbalance the rack or exceed the ra
24、cks weight limits. (5)the rack should be mechanically secured to insure stability in the event of an earthquake. items included with the silkworm 38002008年11月24日15:16the following items are included with the standard shipment of the silkworm 3800: 1.the silkworm 3800 switch, with two fan trays and e
25、ither one or two power supplies installed 2.one 10 ft. rs-232 serial cable, convertible to an rj-45 connector through removal of the adapter on the end of the cable 3.one or two 6 ft. power cables, according to the number of power supplies included with the switch 4.rubber mounting feet (used only f
26、or setting up the switch as a stand-alone unit) 5.the silkworm 3800 quickstart guide 6.the brocade documentation cd-rom the silkworm rack mount kit (p/n xbr-000016) is required if the switch is to be installed in a rack. this kit is not included with the standard shipment of the silkworm 3800, and c
27、an be ordered from your switch supplier (it is the same kit used for the silkworm 2800). setting up the silkworm 3800 as a stand-alone unit2008年11月24日15:17this procedure provides instructions for setting up the switch as a stand-alone unit on a flat surface. the following items are required for this
28、 procedure: (1)the silkworm 3800 (2)the power cable or cables provided with the silkworm 3800 (3)the rubber mounting feet provided with the silkworm 3800 to set up the switch as a stand-alone unit: 1. unpack the silkworm 3800, and verify all ordered items are present. 2. apply the rubber feet. (1)cl
29、ean the four depressions that are at each corner of the bottom of the switch to ensure they are free of dust. (2)place a rubber foot in each depression, with the adhesive side against the chassis, and press into place. 3.place the switch on a flat, sturdy surface. 4. provide power to the switch. (1)
30、connect the power cable to the silkworm 3800 power supply and to a power outlet. ensure the power cable is routed so that it is not exposed to stress. (2)turn on the power supply (flip the ac switch to “i”) when ready to supply power to the switch. the switch automatically runs post (power on self-t
31、est) each time it is turned on. (3)if the silkworm 3800 includes a second power supply, repeat steps 4a - 4b for the remaining power supply. do not connect the switch to the network until the ip address is correctly set. for instructions on how to set the ip address, see configuring and connecting t
32、he silkworm 3800 on page 2-6.installing the silkworm 3800 in an eia rack2008年11月24日15:17this procedure provides instructions for installing the silkworm 3800 in a rack that meets eia standards, using the silkworm rack mount kit, p/n xbr-000016. the following items are required to install the silkwor
33、m 3800 in a rack: 1.the silkworm 3800 2.the power cable or cables provided with the silkworm 3800 3.the silkworm rack mount kit, p/n xbr-000016 4.a #2 phillips screwdriver with torque capability all screws used in this procedure should be tightened to a torque of 25 inch-pounds. to install the switc
34、h in a rack: 1. unpack the silkworm 3800 and verify all items are present. 2. unpack the silkworm rack mount kit and verify all items are present (listed in table 2-1 on page 2-4). 3. separate the inner and outer slide rails (item 1). (1)slide open one of the slide rails until the lock engages. (2)d
35、epress the lock release lever and remove the inner rail from the outer rail. (3)repeat steps 3a - 3b for the other rail. (4)install the inner (smaller) slide rail on the chassis as shown in figure 2-1 on page 2-4. (1)position one of the inner rails with the flat side against the side of the switch a
36、nd the chamfered end of the rail closest to the rear of the switch, aligning the holes in the rail with the threaded holes in the side of the switch. (2)attach the inner rail using two of the following screws: item 6, screw, 8-32 x 3/16”, zinc. (3)repeat steps 4a - 4b for the second inner rail on th
37、e other side of the switch chassis. 5. optional step: if desired, install the right rack mount bracket and left rack mount bracket, items 2 and 3, on the switch chassis. these brackets are used to secure the switch to the rack. (1)position the right rack mount bracket at the right front corner of th
38、e switch, so that the two holes in the bracket align with the two threaded holes in the switch. (2)attach the bracket using two of the following screws: item 6, 8-32 x 3/16? zinc. (3)repeat steps 5a - 5b for the left rack mount bracket on the left front corner of the switch. (4)attach two of the fol
39、lowing brackets to each outer slide rail: item 4, rack mounting bracket, 3 hole. see figure 2-1 for bracket position. (1)position one of the rack mounting brackets at the end of one of the outer slides. (2)attach the bracket using two of the following screws, with the screw heads inside the slides:
40、item 9, screw, 8-32 x 3/8? zinc. (4)place one of each of the following items on the outer end of the screw, in the order listed: item 10, washer, flat, #8, item 11, washer, lock, #8 item 12, nut, hex, 8-32 (5)repeat steps 6a - 6c for the three remaining rail ends. 7.install the outer (larger) slides
41、 in the rack. (1)align one of the outer slides in the rack at the desired height, as shown in figure 2-1. (2)attach the slide using two of item 5, rack bar nut, 3 hole, and two of item 7, screw, 10-32 x 3/8? black. (3)repeat steps 7a - 7b for the other slide rail. 8. install the switch in the rack.
42、(1)position the switch in front of the rack and insert into the rack by sliding the inner slides on the switch into the outer slides on the rack. (2)check the alignment of the slides by sliding the switch in and out of the rack. any difficulty moving the switch indicates misalignment; if this occurs
43、, adjust the slide positions until the movement is smooth. 9. optional step: if the right rack mount bracket and left rack mount bracket were installed on the front corners of the switch, attach both brackets to the cabinet rack using two of item 7, screw, 10-32 x 3/8”, per bracket. the screws shoul
44、d pass through the front of each bracket and through the slide rail. 10. provide power to the switch. (1)connect the power cable to the silkworm 3800 power supply and to a power outlet. (2)turn on the power supply (flip the ac switch to “i”) when ready to supply power to the switch. the switch autom
45、atically runs post each time it is turned on. (3)if the silkworm 3800 includes a second power supply, repeat steps 10a - 10b for the remaining power supply. do not connect the switch to the network until the ip address is correctly set. for instructions on setting the ip address, see configuring and
46、 connecting the silkworm 3800 on page 2-6. configuring and connecting the silkworm 38002008年11月24日15:19this procedure provides instructions for configuring and connecting the silkworm 3800 for use in a network and fabric. the following items are required to configure and connect the silkworm 3800: (
47、1)the silkworm 3800 installed and connected to a power source (2)workstation that has a terminal emulator application (such as hyperterminal) (3)serial cable provided with the switch, for connecting the switch to the workstation (4)an unused ip address (5)ethernet cable for connecting the switch to
48、the workstation or to a network containing the workstation (6)sfps and cables, as required to connect the switch to the fabric to configure the silkworm 3800 and connect it to a fabric: 1. replace the factory ip address and related information with the ip information provided by your network adminis
49、trator. (1)remove the shipping plug from the serial port and insert the serial cable provided with the silkworm 3800. (2)connect the other end of the serial cable to an rs-232 serial port on the workstation. if no rs-232 serial port is available on the workstation, the adapter on the end of the seri
50、al cable can be removed to use the rj-45 connector to create a serial connection. (3)verify that the switch power is on and post is completed. (4)disable any serial communication programs running on the workstation. (5)open a terminal emulator application (such as hyperterminal on a pc, or term in a
51、 unix environment), and configure as follows: in a windows 95, 98, 2000, or nt environment: parameter value bits per second: 9600 databits: 8 parity: none stop bits: 1 flow control: none in a unix environment, enter the following string at the prompt: tip /dev/ttyb -9600 (6)from the terminal emulato
52、r application, log on to the switch with administrative privileges through the serial connection. the default administrative logon is admin and the default password is password. g. enter the following at the prompt: ipaddrset (7)enter the following information at the corresponding prompts, listed be
53、low: ethernet ip address 7: enter the new ethernet ip address. 1.ethernet subnetmask : enter the new ethernet subnetmask. 2.fibre channel ip address none: enter the new fibre channel ip address if desired. 3.fibre channel subnetmask none: enter the new fibre channel subnet mask if d
54、esired. 4.gateway address : enter the new gateway address. 1.set ip address now? y = set now, n = next reboot: enter y?to set now. (8)you can verify the address was correctly set by entering the following: ipaddrshow (9)record the ip address on the label provided for this purpose on the silkworm 3800. (10)once the ip address is verified as correct, remove the serial cable, and replace the shipping plug in the serial port. the serial port is intended only for use during the initial setting of the ip address and for service purposes. using the serial port duri
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 危大工程专项施工方案文明施工
- 高陡边坡预应力锚索喷锚支护施工方案
- GB/T 44554.9-2025电子凭证入账要求第9部分:国库集中支付电子凭证
- 2026上海复旦大学国家智能评价与治理实验基地赵星课题组招聘博士后2人考试参考试题及答案解析
- 2026北京市延庆区教育委员会第一批招聘教师60人考试参考试题及答案解析
- 2026山东青岛水务集团有限公司招聘1人考试备考试题及答案解析
- 2026四川内江市隆昌市普润镇中心学校招聘2人考试备考试题及答案解析
- 2026广西农业科学院甘蔗研究所甘蔗绿色高效栽培技术团队招聘编制外工作人员1人考试参考试题及答案解析
- 2026年甘肃省金昌市机关事务管理局补招临聘驾驶员笔试参考题库及答案解析
- 2025浙江省旅游投资集团招聘25人(第八批)考试备考试题及答案解析
- 2025年教师师德师风自查问题清单及整改措施范文
- DL-T5796-2019水电工程边坡安全监测技术规范
- 2023年副主任医师(副高)-推拿学(副高)考试历年高频考点真题演练附带含答案
- 产品质量法课件
- FZ/T 82006-2018机织配饰品
- 《食品包装学(第三版)》教学PPT课件整套电子讲义
- plc电机正反转-教案
- 燃机三菱控制系统简述课件
- 全尺寸测量报告FAI
- 稽核管理培训课件
- 临时电箱日常巡查记录表
评论
0/150
提交评论