



下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、.英国伦敦塔桥(附图)TOWER BRIDGE LONDONOriginally, London Bridge was the only crossing over the Thames. As London grew, so more bridges were added, but these were all to the west of London Bridge, since the area east of London Bridge had become a busy port. In the 19th century, the east end of London became
2、so densely populated that public pressure mounted for a bridge to the east of London Bridge, as journeys for pedestrians and vehicles were being delayed literally by hours.Finally in 1876, the Corporation of London, who were responsible for that part of the Thames, decided that the problem could be
3、put off no longer. Tower Bridge was completed in 1894, after 8 years of construction. However, many people dont realise why it is so different from Londons other bridges.How a Design was ChosenThe big problem for the Corporation of London was how to build a bridge downstream from London Bridge witho
4、ut disrupting river traffic activities. To get as many ideas as possible, the Special Bridge or Subway Committee was formed in 1876, and opened the design of the new crossing to public competition.Over 50 designs were put forward for consideration, some of which you can see if you visit The Tower Br
5、idge Exhibition. However, it wasnt until October 1884 that Horace Jones, the City Architect, in collaboration with John Wolfe Barry, offered the chosen design for Tower Bridge as a solution.The Building of the BridgeIt took 8 years, 5 major contractors and the relentless labour of 432 construction w
6、orkers to build Tower Bridge.Two massive piers had to be sunk into the river bed to support the construction, over 11,000 tons of steel provided the framework for the towers and walkways. This was then clad in Cornish granite and Portland stone, both to protect the underlying steelwork and to give t
7、he bridge a more pleasing appearance.How it Works - Then NowWhen it was built, Tower Bridge was the largest and most sophisticated bascule bridge ever built (bascule comes from the French for see-saw). It was a hydraulically operated bridge, using steam to power the enormous pumping engines. The ene
8、rgy created was then stored in six massive accumulators so that, as soon as power was required to lift the bridge, it was readily available. The accumulators fed the driving engines, which drove the bascules up and down. Despite the complexity of the system, the bascules only took about a minute to
9、raise to their maximum 86 degrees.Nowadays, the bascules are still operated by hydraulic power, but since 1976 they have been driven by oil and electricity rather than steam. The original pumping engines, accumulators and boilers are on show as part of The Tower Bridge Exhibition, and you can also s
10、ee the current machinery and control cabins when you come on a Behind The Scenes Tour. (Behind The Scenes Tours must be pre-booked)Interesting FactsTower Bridge has a fascinating history, which is explored in detail for visitors at The Tower Bridge Exhibition. Here are a few interesting facts you ma
11、y not have known:1910 The high-level walkways, which were designed so that the public could still cross the bridge when it was raised, were closed down due to lack of use. Most people preferred to wait at the bottom and watch the bascules rise up!1912 During an emergency, Frank McClean had to fly be
12、tween the bascules and the high-level walkways in his Short biplane, to avoid an accident.1952 A London bus had to leap from one bascule to the other when the bridge began to rise with the bus still on it.1977 Tower Bridge was painted red, white and blue to celebrate the Queens Silver Jubilee. (Befo
13、re that, it was painted a chocolate brown colour).1982 Tower Bridge opened to the public for the first time since 1910, with a permanent exhibition inside called the Tower Bridge Exhibition. The Walkways were glazed for the first time to house the new Exhibition.1993 The centenary exhibition - The Tower Bridge Experience opened, featuring animatronic models telling the story of Tower Bridge.1994 Tower Bridge became available to hire for parties and rece
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 大考语文试题答案及解析
- 测试七英语试题及答案
- 高速公路智能交通系统在高速公路养护管理中的智能调度策略
- 美育概论考试题及答案
- 教育行业在线教育模式研究报告:2025年市场分析与策略
- 数据支付测试题及答案
- 即时配送行业2025年配送路径优化与成本控制物流趋势研究报告
- 金融客户关系管理数字化升级金融行业CRM系统性能优化报告
- 装备制造业2025年自主创新能力提升与产业技术创新体系建设策略创新报告
- 科学测试题大全及答案
- 2025苏州中考数学二轮专题复习-圆的综合应用-专项训练【含答案】
- 空气输送斜槽选型手册
- 服装IE(浙江纺织服装职业技术学院)知到智慧树答案
- 培训机构教务管理岗位职责
- 水利工程项目法人质量责任追究和奖惩制度
- DB44-T 2537-2024 小型水电站退役导则
- 托幼机构安全应急预案制度
- 酒店执行力培训
- 企业合规之内控与风险管理
- 广东省水利水电建筑工程预算定额(上册)
- 住建部建设工程施工劳务分包合同(2024版)
评论
0/150
提交评论