1、turkey eren (1+1)x600mw supercritical coal fired power plantquality inspection and acceptance record project name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(the verticality checking of middle columns)page 5 of 5cmecnepcnepcnepcturkey eren (1+1)x600mw supercritical coal fired power plantquali
2、ty inspection and acceptance record project name#1锅炉中部钢架安装记录。#1 boiler steel structure installation( diagonal checking of middle column elevation 41m) page 4 of 5待添加的隐藏文字内容1cmecnepcnepcnepcturkey eren (1+1)x600mw supercritical coal fired power plantquality inspection and acceptance record project na
3、me#1锅炉中部钢架安装记录。#1 boiler steel structure installation(space checking of middle columns elevation 41m axis g ) page 3 of 5cmecnepcnepcnepcturkey eren (1+1)x600mw supercritical coal fired power plantquality inspection and acceptance record project name#1锅炉中部钢架安装记录。#1 boiler steel structure installatio
4、n(space checking of middle columns elevation 41m axis k ) page 2 of 5cmecnepcnepcnepcturkey eren (1+1)x600mw supercritical coal fired power plantquality inspection and acceptance record project name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(steel structure checking and installation) page 1
5、of 51.appearance of the equipment: no crack, severe corrosion, damage.2.factory welding: no slag, porosity and other ponent material: no misuse.4.the deviation of column, beam length comply with manufacturers technical documentation requirements, maximum 8 mm.5.column curvature 1 / 1000
6、 (column length), the maximum is 7 mm6.column deviation turn value 1 / 1000 (column length), the maximum 8 mm, in line with requirements.7.beam deflection, and lateral bending of values: 17mm ,deviation is less than 1.5 mm.9. bolt hole ellipticity deviation is less than 1.5mm10.the bolts and nuts ha
7、s no cracks and bumps, threads are complete without grease, rust and other attachments.11.the bolts, nuts and washers are the line with equipment, technical documentation requirements.12.the node friction joints surface comply with equipment technical documentation requirements.clean rust ,grease an
8、d dust without distortion, bending, burrs and other defects.13.engagement plates are installed flatly, position is correctly, and structures is close.14.the maximum relative displacement of beam and column centers is 2 mm .15.the maximum parallel deviation between beams is 3 mm.16.the maximum elevat
9、ion deviation of beam is 3 mm .17.the maximum horizontal deviation of beam is 2 mm.18.the maximum space deviation of beam is 3 mm.19.the steel bolt tightening torque of each node all comply with manufacturers technical documentation requirements: m16 initial screw torque is 130n.m; final screw torque end with the cinquefoil shape nut off, final pre-tension is 100kn. m22 initial screw torque is 340n.m; final screw torque end with the cinquefoil shape nut off, final pre-tension is 190kn. m24 initial screw torque is 440n.m; final screw torque end with the cinquefoi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 边城读后感300字左右作文
- 公司股份转让协议
- 如何升职自荐信
- 2025年邵阳职业技术学院单招职业倾向性考试题库带答案详解夺分金
- 安全管理科普讲解
- 别墅庭院设计理念
- 2025年重庆市广元市单招职业倾向性考试题库附参考答案详解(b卷)
- 2025年重庆市宜宾市单招职业倾向性测试题库附答案详解(完整版)
- 2025年人工智能工程师编程能力考核试卷及答案
- 桩基施工安全教育试题及答案
- 《施工计划进度表》
- Unit 5 People around me(教学设计)-2024-2025学年人教PEP版(一起)(2024)英语一年级上册
- 2018年全国硕士研究生入学统一考试数学二考研真题及答案解析
- 村委会签订土地承包合同
- GB/T 42513.7-2024镍合金化学分析方法第7部分:钴、铬、铜、铁和锰含量的测定火焰原子吸收光谱法
- 2024年全国高校文明校园测评细则
- 职业生涯规划书成长赛道
- 新冠病毒实验室检测课件
- 江苏省无锡市第三高级中学2024届高一物理第一学期期中监测模拟试题含解析
- 第九节-心包疾病的护理课件
- 人教版八年级上册数学全册单元测试卷
评论
0/150
提交评论