




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、时磊忖呎Spiral chute1、product descripti onSpiral chute is in tegrated spiral separator , spiral chute, shaker , cen trifugal concen trati on machine characteristics of the equipment,mining,mineral processingis the bestequipme nt, especially the seaside, riverside, sand beach, the stream of placer mining
2、 is more ideal. The product has the adva ntages of reas on able structure, simple in stallati on, covers an area of small, simple operati on, stable ore ben eficiati on, clear, large process ingcapacity, high efficiency enrichment ratio high, high recovery rate, reliable operation characteristics. H
3、ave weight light, moisture-proof, rust-proof, corrosi on resista nee, of the feeding quantity and concentration, particle size, quality of volatility adaptability is strong, no no ise.2、Separation principleSpiral chute is a membra ne flow gravity separati on equipme nt, the select ion prin ciple is
4、the use of useful minerals and gangue in proportion, particle size, shape differences,inrotati ng in cli ned flow by gravity, cen trifugal force, hydrody namic pressure and frictio n force with differe nt groove face, realize the useful min erals and gan gue stratificatio n, branch tape sorting. Hea
5、vy, coarse granu larity, fast sedime ntati on of particles graduallymovedtowards the spiral groove inner edge, the proporti on of small, fine particle size, particle sedimentationslow gradually moved to the spiral groove edge, gradually banding,cul min at ing in the spiral groove end by cutt ing ore
6、 tank is respectively conn ected out, to realize separatio n.3、Applicati onThe sorting equipme nt for grain size 0.3-0.02 mm fine iron ore, tita nium ore, chromite, pyrite, zircon, monazite, rutile , phosphorus ore, tungsten, tin, B mine of tantalum niobium ore with the differe nee of specific gravi
7、ty, and other non-ferrous metals, rare metals and non-metallic mineral. The sorting process with a stable, easy to control, to allow changes to the mi neral concen tratio n ran ge, high en richme nt, high recovery rate, small occupati on area, little water consumption,simple structure, no need of po
8、wer, large processingqua ntity, simple in stallati on, convenient operati on, small in vestme nt, quick adva ntages.4、The method of useThe spiral chute is erected, calibrated vertical line, with metal or wood fixed in position, by the sand pump will ore to spiral top two iniet, adding supplemental w
9、ater, mineral ore concentration regulation paddle, paddle down naturally from high swirl, in rotating inclined flow produces a kind of in ertial cen trifugal force, with ore proport ion, particle size, shape differe nces, swirl through the action of gravity and cen trifugal force, will be mine and s
10、and separat ing, concen trate into the concen trate pipe conn ected with a hopper, taili ngs intotailing bucket a pipeline is connected to a sand pool, then the pump discharge, finished process ing the whole process.啪島龄叶5、Structure and technical parameterMainly by the ore separator , cross, to mine
11、groove, helical groove, cutt ing trough, pick ore bucket and slot pillar of seve n comp onen ts. The helical groove is spiral chute of the main components, each spiral chute is 2 - 4 head spiral groove, each head spiral groove is composed of 5 spiral plates (according to mineral properties and benef
12、iciation process need, after tests also con sider 4 circles, in order to reduce the equipme nt height) spiral plate by bolts are fixed together , spiral sheet is made of glass fiber rein forced plastic (FRP) made, light weight, an ti-corrosi on, moisture-proof, anti deformati on and stre ngth.A*-Ao
13、oooi-rhajine1 st eel & t evl23_tpiTsl4Fr doc I the i bttrcrpli *ti百-”t ora dot6-Finta *m ue了1diaiiKe 1s, 1 evtITfll Hint*4-FrdQCI Iht ibttrcapliAn5-”t srt slotBF viali bi asjpiicti Uidtit When Igiii布磊5卅Model5LL-12005LL-9005LU6005LL400External diameter (min)12009006004CQScrew distance mm)SQ0J20.54067
14、5.54Q.4Q5450,360,270 240,130Ratio(Screw distance /diameter)075.0.6,0.45075,0,6,0,450.75,0.6,0450.6.0.45Inclination artgle(fl)9”9”9Max, scroll buckets for each machine4-24-232Fseding granularity (mm)0.30030.3-0.030.2-0.020.2-0.02Feeding concentration(%)25-5525-5525-5525-55Capaclty(t/h)4-62-368彳20.15-
15、0.2Length(inm)1360105070040Dimensions Wldth(mm)13601060700460Height(mm)5230400026001500Weight (kg)600400150506、InstallationSpiral chute in stallati on procedures and requireme nts:1) First check the glass steel spiral slice quality (especially the work surface quality), size and shape to meet the re
16、quireme nts for assembly2) Screw plate connecting bolt hole by the general factory in advanee with a drill. If the manu facturer has no process ing is required, accord ing to the same template drill ing, in order to ensure good interchangeability.3) Bolt the five coil sheet are connected into a grou
17、p of spiral groove, level set, two adjace nt flange connection with in the surface smooth tran siti on is conn ected, specialattention should be paid on the surface may not be lower than the corresponding lower sheet surface. Alo ng the diameter directi on .(the slot width direct ion) to edge alig n
18、ment as the sta ndard, do not allow plate rim in side, so the in stallati on is inten ded to preve nt the occurre nee of ore fluid splash. Joint gap, with putty.4) The coupled five of a group of four (or two or three) spiral groove rotat ing together into a desired shape, distribution.5) The four ro
19、ots (three) colu mn is respectively arran ged in four (or three, two) spiral groove, bolt the spiral groove and the pillar is fixed, the n in stall the cross (tripod), so that each spiral along the park are cloth, then all bolts. After installation, spiral plate to时磊忖呎maintain the n atural shape, wi
20、th no obvious varia nt.6) Would give mine groove and product in tercepti on groove are respectively arran ged in the spiral groove of the head end and the tail end to en sure that the connection ofclose water leakage. If there is a gap, by coati ng seali ng. To en sure the smooth tran siti on of gro
21、ove surface.7) To mine even divider and product assemble bucket and the slot bracket is not conn ected, free placed on the bracket, the in stallati on should pay atte nti on to in thechart are position. Each row of tube to distributor are respectively aligned with corresp onding to the ore tank.6-S
22、shaking table1、ApplicationThe 6-S shaking table is one of the main equipment of gravity concentration, it is widely used in separating tungsten, tin, tantalum,niobium, gold and other rare metals andprecious metal ore. Can be used for roughing, concentration, scavenging different operations, separati
23、ng coarse sand (2-0.5mm) (0.5-0.074mm), fine sand, clay (- 0.074) of differe nt gra in grade It can also be used to separate iron, mangan ese ore and coal. When process ing tun gste n, tin ore, the table effective recycli ng particle size range for the 2-0.22mm.2、PerformaneeThe shaking table is in t
24、he beneficiation process is complex a tilt bed plane, ore particle swarm from the bed surface an gle to the trough in to, at the same time by lateral flush ing water supply to the water tank, and the mineral particles in gravity, lateral flow momentum, bed reciprocatingasymmetric motion produced by
25、the inertia and friction effects next,according to the proportion and hierarchical granularity, and along the bed surface for Ion gitudi nal moveme nt along the in cli ned bed surface and tran sverse moti on. Therefore, specific gravity and particle size of differe ntmin eral particles along the dir
26、ect ion ofmoveme nt of the respective gradually by the A side to side B fan-shaped shed, concen trate and taili ngs from the end side of the discharg ing end is divided into differe nt, concen trate, middli ng and taili ngs.6-s has a double high rich ore ratio, high separation efficiency, safeguards
27、 easily, convenient for adjusti ng the stroke. In cha nge cross fall and stroke is still maintain the surface of bed moveme nt bala nee, the spri ng is placed in the box body, compact structure, and can in tur n draw final concen trate and tail in gs.3、Classification1) According to the different pos
28、ition of ore, shaker can be divided into right and left type cradle type cradle two forms. The right type cradle for the ore location for the rocking mecha nism is on the right side, left type cradle to mine is located in the left.2) 6-S shaker can be divided into fixed shaking table , channel bar s
29、haking table, big cha nnel steel shak ing table.时需Sr彳3) According to the concentration particle size, divided into coarse sand table, sand table and slimmer three.4、StructureThis table is mainly composed of a bed head, motor, adjustable slope, the bed surface,mine shafts, sink, and reflex and lubric
30、ation system of eight components.The surface of bed Ion gitud inal reciprocat ing moti on through a crank connecting rod type driving mechanism to realize. The electric motor through the belt drive to make the big belt wheel drives the cran kshaft to rotate, the rocker made subseque ntly moves up an
31、d dow n, rocker down wards, elbow board drive rear axle and the reciprocati ng rod moves backwards, the spring being compressed. The bed surface is through linkage seat and a reciprocating lever connected, so this is also so the bed surface for backward movement, when the rocker upward movement, due
32、 to the tension spring drive, the bed surface will move forward.,Forts-end 2.c h utet fuce 4.Feed -vuter 匚hute5,Adj usting slope S.Lubtsystem 7*Sti ipe 8+Ce nent block1-lidnd wheelsciev*? ./tisti4 nut saddle stMt h shnkr7,qiip 91590015003120-43 60-12042810x1630x13701340CT(G,N,B.S)-91890018003125-55
33、75-16543110x1630x13701500CT(G,N.B,S)-92190021003130-63 90-18043410x1630x13701780CT(G,N.B,S)-92490024003136-65 105-19043710x1630x13701960CT(G.N,B(S)-92790027003140-73 120-21044010 x 1630 x13702050CT(G,N.B,S)-1012105012002225-53 75-15042530X1780 x15201380CTfG.N.B ,2)-1015106015002236-65 105-19542830x1
34、780 x15201620CT(G,N,B.S)-1018105018002240-75 120-2255.53130 x 1780 x15201870. . ShellShelldiameterfmm) length(m m)Shell rotation speedfr/mi n)Feeding Processing size(mm) capacity(tZh)Power(k w)CTB6012 6001200352-010-201.5CTB6018 6001800352-015-302.2CTB7518 750 1800352-020-452.2CTB9018 9001800353-040
35、-603CTB9021 9002100353-045-603CTB9024 9002400283-045-704CIH101810501800203-050-755.5CTB1021 10502100203-050-1005.5CTB1024 10502400203-060-1205.5CTB1218 12001800183-080-1405.5CTB1224 12002400183-085-1807.5CTB123012003000183-0100-1807.5时磊忖呎4、In stallati on and use1) At first mach ine in stalled must check the tran sport load ing
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 数学不等式求解技巧及实际应用案例
- 光伏发电系统施工安全管理规范
- 教师培训项目合同范本与法律要点
- 燃气管道施工现场安全风险识别与控制
- 工业设备安全配置管理手册
- 小学数学教师招聘试题库
- 2025-2030智慧农业技术应用分析及市场发展趋势研究报告
- 2025-2030智慧农业产业链整合研究与发展趋势分析报告
- 中学英语知识点整合与考点训练卷
- 2025-2030智慧养老机构建设项目市场供需现状及投资潜力评估规划分析报告
- 人教鄂教版五年级上册科学期中测试题(1-3单元)(含答案)
- 心灵树洞中小学生心理健康主题班会PPT教学课件
- 木质纤维素的生物分解及其转化技术
- 海康威视磁盘阵列使用说明精.选
- GB/T 7387-1999船用参比电极技术条件
- GB/T 39473-2020北斗卫星导航系统公开服务性能规范
- GB 16808-2008可燃气体报警控制器
- 公司有限空间作业安全专项排查表
- 强度调制机理光纤传感器基本原理课件
- 《当代中国经济》第一章中国经济体制改革
- 《自强不息的人格修养》-课件1
评论
0/150
提交评论