1、中 国 核 工 业 华 兴 建 设 有 限 公 司china nuclear industry huaxing construction co., ltd.项 目 名 称project文 件 编 码code文 件 类 别doc. type文 件 名 称doc. title检验试验计划 inspection and test plan预制內罐环梁施工 itp itp for pre-cast bearing ring项目inspection and test plan 检验试验计划itp for pre-cast bearing ring 预制内罐环梁施工检查试验计划检试验计划的编号qc lev

2、el: ivreference codes, standards, intervention points 检验点item项目inspection & testing 检查和检验specifications (min. requirement forinspection and testing) 参考法规、标准、规范(检查和acceptance criteria验收标准inspection frequency检验频率sc co sv cl laremark备注检验的最低要求)1approvals 批准 (一次 once/100%/ spot check 抽查)method s

3、tatement for pre-cast bearing ring 预制内罐环梁施工方案approval of concrete mixture design 砼配合比设计的批准 concrete mix trials混凝土开盘鉴jgj55-2011jgj55-2011approved 审核通过并批准approved 审核通过并批准approved 审核通过并批准hhhrhwhhwhhw2rebar raw material test 钢筋原材检验2.1sample取样gb 1499.2-2007gb 1499.2,9.2 条 clause 9.2hwww2.5tensil

4、e property抗拉性能bend performance弯曲性能mass per meter重量偏差length长度gb 1499.2-2007gb 1499.2-2007gb 1499.2-2007gb 1499.2-2007gb 1499.2 表 6&7.3 条 & clause 7.3gb 1499.2 表 8&8.2 条 & clause 8.2gb 1499.2 表 3&6.3 条 & clause 6.3gb 1499.2 表 3&6.3 条 & clause 6.3table 6table 8table 3table 3hhhwriririririririririririri

5、3rebar installation 钢筋安装3.13.2rebar variety, grad, specifications, quantity. 钢筋的品种、级别、规格和数量location位置drawings图纸drawings图纸meet the design requirements 符合设计要求meet the design requirements 符合设计要求hhwwwwririlegend and intervention codes: sc vendor or subcontractorco lng tank contractorcl clientsv supervis

6、ion companyr review documents and certificates ri random inspectionw witness point (100% inspection) h hold pointqc level: (refer to the document “ 总包的质量控制文件、方案、规范等 ).level i: full stage inspection carried out progressively from commencement of erection or manufacturing to final acceptance. level ii

7、: set of inspections at specific stages during the manufacturing/erection process.level iii: examination and/or test of the product and the quality records in its as-built state against specified criteria.level iv: review and inspection of manufacturer product and documentation, incl. vendor qc reco

8、rds at receipt by tank contractor.this document is the intellectual property of contractor and/or owner. it must not be copied or used other than for this project without written consent of contractor and owner.rev.a page 1 of 4项目inspection and test plan 检验试验计划itp for pre-cast bearing ring 预制内罐环梁施工检

9、查试验计划检试验计划的编号qc level: ivreference codes, standards, intervention points 检验点item项目inspection & testing 检查和检验specifications (min. requirement forinspection and testing) 参考法规、标准、规范(检查和acceptance criteria验收标准inspection frequency检验频率sc co sv cl laremark备注检验的最低要求)3.33.4thickness of cover保护层厚度reinforced c

10、oncealed engineering acceptance钢筋隐蔽工程验收gb50204-2002(2011 版)meet the design requirements 符合设计要求hhwhwhriw4formwork installation 模板安装4.1section dimension截面尺寸gb50204-2002(2011 版)table 4.2.7 表 4.2.7+4,-5mmhwwri4.54.6bottom formwork levelness 底模平整度验收formwork strengthening and stability摸板加固稳定性clea

11、r up inside forms模板内的清理applying release agent or not 摸板是否刷隔离剂inspecting the location of lifting hole检查吊装孔位置spot check随机检查spot check随机检查wwwwwwwwwwwwwwwririririri5concrete pouring 混凝土浇筑requisition for concreting申请浇筑令concrete slump混凝土坍落度concrete elevation inspection(in-process control)混凝土标高检查(

12、浇筑过程检查)date/time/qty/castinglocation.etc 日期、时间、数量、浇筑部位16030mmhhhhwwhwwriririlegend and intervention codes: sc vendor or subcontractorco lng tank contractorcl clientsv supervision companyr review documents and certificates ri random inspectionw witness point (100% inspection) h hold pointqc level: (r

13、efer to the document “ 总包的质量控制文件、方案、规范等 ).level i: full stage inspection carried out progressively from commencement of erection or manufacturing to final acceptance. level ii: set of inspections at specific stages during the manufacturing/erection process.level iii: examination and/or test of the p

14、roduct and the quality records in its as-built state against specified criteria.level iv: review and inspection of manufacturer product and documentation, incl. vendor qc records at receipt by tank contractor.this document is the intellectual property of contractor and/or owner. it must not be copie

15、d or used other than for this project without written consent of contractor and owner.rev.a page 2 of 4项目inspection and test plan 检验试验计划itp for pre-cast bearing ring 预制内罐环梁施工检查试验计划检试验计划的编号qc level: ivreference codes, standards, intervention points 检验点item项目inspection & testing 检查和检验specifications (m

16、in. requirement forinspection and testing) 参考法规、标准、规范(检查和acceptance criteria验收标准inspection frequency检验频率sc co sv cl laremark备注检验的最低要求)5.45.5concrete sampling 混凝土取样concrete curing 混凝土养护method statement for pre-cast bearing ring预制内罐环梁施工方案hhwwwwriri66.1cast in site structure appearance 现浇结构外观appearance

17、外观质量gb50204-2002(2011 版) 8.2.1the appearance of concretestructure shall not have serious gb50204-2002(2011 版) h w w ridefects 现浇结构外观质量不应有严重缺陷6.26.3elevation 标高levelness 平整度hhhhwwriri6.4appearance外观质量gb50204-2002(2011 版) 8.2.1the appearance of concretestructure shall not have serious gb50204-2002(201

18、1 版) h w w ridefects 现浇结构外观质量不应有严重缺陷7assembly 组装7.1location 位置drawings图纸meet the design requirements 符合设计要求h h w rilegend and intervention codes: sc vendor or subcontractorco lng tank contractorcl clientsv supervision companyr review documents and certificates ri random inspectionw witness point (10

19、0% inspection) h hold pointqc level: (refer to the document “ 总包的质量控制文件、方案、规范等 ).level i: full stage inspection carried out progressively from commencement of erection or manufacturing to final acceptance. level ii: set of inspections at specific stages during the manufacturing/erection process.leve

20、l iii: examination and/or test of the product and the quality records in its as-built state against specified criteria.level iv: review and inspection of manufacturer product and documentation, incl. vendor qc records at receipt by tank contractor.this document is the intellectual property of contra

21、ctor and/or owner. it must not be copied or used other than for this project without written consent of contractor and owner.rev.a page 3 of 4项目inspection and test plan 检验试验计划itp for pre-cast bearing ring 预制内罐环梁施工检查试验计划检试验计划的编号qc level: ivreference codes, standards, intervention points 检验点item项目insp

22、ection & testing 检查和检验specifications (min. requirement forinspection and testing) 参考法规、标准、规范(检查和acceptance criteria验收标准inspection frequency检验频率sc co sv cl laremark备注检验的最低要求)levelness meet the design requirements7.2 h h w ri平整度 符合设计要求legend and intervention codes: sc vendor or subcontractorco lng tank contractorcl clientsv supervision companyr review documents and certificates ri random inspectionw witness point

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论